Entry-Level Project Engineer: Submittals, RFIs & Change Orders

M.C. Dean, Inc.

Virginia (MN)

On-site

USD 76,000 - 94,000

Full time

13 days ago
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Benefits offered by this job

Medical, dental, vision, life and disa
Paid time off
Tuition reimbursement
401k Retirement Plan
Military Reserve pay offset
Paid maternity leave

Job summary

M.C. Dean is seeking an engineering professional to support project documentation, submittals, RFIs, and change management. The role emphasizes maintaining thorough project records and coordinating access, permits, and cost-tracking across assignments.

Ideal candidates have a Bachelor of Science in Engineering (ABET preferred) with 0+ years of related experience and a willingness to engage in cross-functional project activities within a dynamic team environment.

Qualifications

  • Bachelor of Science in Engineering; ABET accreditation preferred.
  • 0+ years of experience in engineering or related field.

Responsibilities

  • Process submittals.
  • Process RFIs.
  • Maintain daily work tickets.
  • Post RFIs and change orders.
  • Track and manage change orders.
  • Maintain as-built documentation as work progresses.
  • Document project issues and conditions.
  • Maintain organized project records.
  • Submit hours and cost codes.
  • Obtain permits, badges and access requests in advance.
  • Assist with preparing change orders.
  • Manage project library.
  • Participate in Key Project Review (KPR).

Education

Bachelor of Science in Engineering

Job description

M.C. Dean is seeking an engineering professional to support project documentation, submittals, RFIs, and change management. The role emphasizes maintaining thorough project records and coordinating access, permits, and cost-tracking across assignments.

Ideal candidates have a Bachelor of Science in Engineering (ABET preferred) with 0+ years of related experience and a willingness to engage in cross-functional project activities within a dynamic team environment.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Associate Project Engineer - Documentation & RFI Specialist
Associate Project Engineer - Documentation & RFI Specialist

M.C. Dean, Inc. • South Hill (VA)

On-site
USD 55,000 - 65,000
Entry-Level Project Engineer - Electrical & Systems
Entry-Level Project Engineer - Electrical & Systems

M.c.-Dean,-Inc. • Richmond (VA)

On-site
USD 76,000 - 94,000
Medical insurance
Dental insurance
Vision insurance
+7
Aspiring Project Engineer: Submittals & RFI Focus
Aspiring Project Engineer: Submittals & RFI Focus

M.C. Dean, Inc. • Monroe (LA)

On-site
USD 45,000 - 55,000
Project Engineer, Associate
Project Engineer, Associate

M.C. Dean, Inc. • Baltimore (MD)

On-site
USD 72,000 - 109,000
Project Engineer: Build Smart, Secure Infrastructure
Project Engineer: Build Smart, Secure Infrastructure

M.C. Dean • South Hill (VA)

On-site
USD 75,000 - 114,000
Competitive salary
Insurance (medical, dental, vision)
Paid time off
+4
Project Engineer: Planning, Coordination & Cost Savings
Project Engineer: Planning, Coordination & Cost Savings

M.C. Dean, Inc. • Burlington (TX)

On-site
USD 70,000 - 90,000
Associate Project Engineer: Building Intelligence & Systems
Associate Project Engineer: Building Intelligence & Systems

M.C. Dean, Inc. • Burlington (TX)

On-site
USD 60,000 - 70,000
Deputy Project Leader
Deputy Project Leader

M.C. Dean, Inc. • Virginia (MN)

On-site
USD 70,000 - 90,000
Project Engineer: Drive Critical Systems & Delivery
Project Engineer: Drive Critical Systems & Delivery

M.C. Dean, Inc. • Rock Hill (SC)

On-site
USD 60,000 - 80,000
Project Engineer, Associate
Project Engineer, Associate

M.C. Dean, Inc. • Frederick (MD)

On-site
USD 75,000 - 114,000
Medical, dental, vision, life, and disability insurance
Paid time off
Tuition reimbursement
+3