Get more replies from employers
Send a job-specific resume in minutes.
Caturus Management Services, LLC, headquartered in Houston, seeks an Engineer, Process to lead process design, commissioning, and startup efforts for LNG facilities. You will manage Inlet Facilities, dehydration, LNG processing modules, utilities, and safety systems, collaborating with Operations, Marine, and contractor teams.
The role requires a Bachelor’s degree in engineering, 5+ years of process engineering experience, and LNG project exposure.
Department: Engineering
Employment Type: Full Time
Location: US TX Houston - Technip Office
About Us: The Caturus platform founded by Kimmeridge – an alternative asset manager focused on the energy sector – supports Kimmeridge’s overarching goal of providing low‑cost energy on demand with the lowest carbon footprint.
Kimmeridge’s vision in creating Caturus is to build the only independent, fully integrated natural gas and LNG export platform in the U.S. through a combination of its upstream operations and via Commonwealth LNG, a 9.5 million tonnes per annum liquefied natural gas export terminal in southwestern Louisiana on the U.S. Gulf Coast. The combined entities are committed to delivering responsibly sourced, low‑emission fuel to domestic and international markets.
Caturus is a Houston‑based, private exploration and production company seeking to materially grow production through development of deep, high pressure, dry gas windows of the Eagle Ford and Austin Chalk, as well as Haynesville formations located in Texas and Louisiana while maintaining a relentless focus on safety.
Commonwealth LNG was founded by industry veterans who decided to re‑engineer the LNG construction model. Using proven best practices, Commonwealth is committed to building a world‑class LNG export facility while focusing on safety, managing risk and achieving best‑in‑class environmental standards.
This Engineer, Process is responsible for the delivery of the process designs, process assurance on commissioning and start‑up, and performance test verification of the CWLNG LNG ISBL / OSBL facilities. These facilities include gas Inlet Facilities, MRU, AGRU, dehydration, NGL Extraction, natural gas liquefaction, Condensate recovery, storage and loading, Refrigerant storage, Power generation, Relief System, and Utilities – Heating Medium (hot oil), Fuel Systems, Water, Air, and Nitrogen.
Key Accountabilities:
Education, Certificates, and Licenses:
Experience:
Knowledge, Skills, and Abilities: