Energy Marshal for Datacenter Construction

SHORM Consulting

Ohio

On-site

USD 110,000 - 165,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

SHORM Consulting is seeking an Energy Marshal to oversee hazardous energy, electrical safety, commissioning, startup, testing, and energization on a data center construction project. The Energy Marshal ensures compliance with Energy Isolation Procedures (EIP), Lockout/Tagout (LOTO), and owner/client energization protocols.

You will work with project management, commissioning teams, contractors, equipment vendors, and client representatives to plan, document, and execute energization safely.

Qualifications

  • 7–10 years in electrical construction, commissioning, or operations.
  • 3–5 years as Energy Marshal or similar role.
  • Experience on hyperscale data center projects.
  • Experience with MV/LV distribution systems.
  • Experience with UPS, generators, switchgear, transformers.

Responsibilities

  • Oversee Energy Isolation Program and LOTO activities.
  • Coordinate energization plans with project teams.
  • Review JHAs/AHAs and Energization Plans.
  • Verify prerequisites before energization activities begin.
  • Maintain energization logs and diagrams.

Skills

Electrical safety principles
OSHA 29 CFR 1926/1910
NFPA 70E
Organizational & communication skills
Project coordination

Education

Bachelor's degree in Safety/Engineering or related field
Associate degree with relevant experience
High School Diploma/GED with electrical experience

Tools

MS Office Suite
Electronic permit systems

Job description

Job Description

Job Description

Job Summary

The Energy Marshal is responsible for overseeing and coordinating all activities involving hazardous energy, electrical safety, commissioning, startup, testing, and energization activities on a data center construction project. The Energy Marshal serves as the primary authority for ensuring compliance with site-specific Energy Isolation Procedures (EIP), Lockout/Tagout (LOTO) requirements, electrical safe work practices, and owner/client energization protocols.

This position works closely with project management, commissioning teams, trade contractors, electrical contractors, equipment vendors, and client representatives to ensure all energization activities are planned, documented, communicated, and executed safely.

Essential Duties and Responsibilities
Energy Control & Isolation:
  • Manage and oversee the site's Energy Isolation Program.
  • Review, approve, and coordinate Lockout/Tagout (LOTO) activities.
  • Verify proper isolation of electrical, mechanical, hydraulic, pneumatic, and stored energy systems.
  • Maintain site energy control logs and isolation records.
  • Conduct field verification of lockout boundaries and energy sources.
Energization & Commissioning Support:
  • Coordinate energization schedules with construction, commissioning, and owner teams.
  • Participate in energization planning meetings.
  • Review Method of Procedures (MOPs), Switching Procedures, and Energization Requests.
  • Verify all prerequisites are completed before energization activities begin.
  • Monitor critical switching and startup operations.
Safety Oversight:
  • Conduct field audits of energized work activities.
  • Ensure compliance with OSHA, NFPA 70E, NEC, and project-specific requirements.
  • Verify qualified personnel are performing electrical work.
  • Stop work when unsafe conditions or procedural violations are identified.
  • Participate in incident investigations involving energy sources.
Documentation & Compliance:
  • Maintain Energization Tracking Logs.
  • Maintain electrical one-line diagrams and isolation records.
  • Review Job Hazard Analyses (JHAs), Activity Hazard Analyses (AHAs), and Energization Plans.
  • Ensure all permits and approvals are obtained before work begins.
  • Track temporary power systems and energization status.
Training & Communication:
  • Conduct Energy Marshal orientations and contractor briefings.
  • Lead daily energization coordination meetings as required.
  • Provide guidance regarding LOTO procedures and energy isolation requirements.
  • Communicate changes in system status to affected stakeholders.
Minimum QualificationsEducation
One of the following:
  • Bachelor's degree in Safety, Engineering, Construction Management, Electrical Engineering, or related field; OR
  • Associate degree in a related field with additional experience; OR
  • High School Diploma/GED with significant electrical construction and commissioning experience.
Experience
  • 7–10 years of electrical construction, commissioning, or operations experience.
  • 3–5 years serving as an Energy Marshal, Electrical Safety Coordinator, Commissioning Coordinator, Electrical Superintendent, or similar role.
  • Previous experience on hyperscale data center projects.
  • Experience with medium-voltage (MV) and low-voltage (LV) electrical distribution systems.
  • Experience with UPS systems, generators, switchgear, transformers, and critical power infrastructure.
Required Knowledge, Skills, and Abilities
  • Thorough understanding of electrical safety principles.
  • Strong knowledge of OSHA 29 CFR 1926 and 1910 requirements.
  • Knowledge of NFPA 70E electrical safe work practices.
  • Understanding of commissioning and startup processes.
  • Ability to interpret electrical one-line diagrams and switching procedures.
  • Strong organizational and communication skills.
  • Ability to work in a fast-paced construction environment.
  • Proficiency with Microsoft Office Suite and electronic permit systems.
Preferred Certifications
One or more of the following:
  • OSHA 30-Hour Construction
  • NFPA 70E Training (Current)
  • Authorized Lockout/Tagout Training
  • Certified Safety Professional (CSP)
  • Construction Health and Safety Technician (CHST)
  • Certified Utility Safety Professional (CUSP)
  • Electrical Safety Compliance Professional (ESCP)
  • Journeyman or Master Electrician License
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Energy Marshal
Energy Marshal

Brasfield & Gorrie, LLC • Charlotte (NC)

On-site
USD 110,000 - 160,000
Energy Marshal
Energy Marshal

Brasfield & Gorrie, LLC • Atlanta (GA)

On-site
USD 90,000 - 140,000
Energy Marshal
Energy Marshal

Sheakley • Jeffersonville (OH)

On-site
USD 156,000 - 194,000
Per Diem $150/day
Energy Marshal
Energy Marshal

Sheakley • Ironton (OH)

On-site
USD 103,000 - 110,000
Energy Marshal
Energy Marshal

Amteck, LLC • Lexington (KY)

On-site
USD 90,000 - 120,000
Medical insurance
Dental insurance
Vision insurance
+4
Energy Marshal
Energy Marshal

Brasfield & Gorrie • Georgia

On-site
USD 90,000 - 150,000
Energy Marshal - Jeffersonville, OH
Energy Marshal - Jeffersonville, OH

Sheakley Workforce Staffing • Jeffersonville (OH)

On-site
USD 137,000 - 237,000
Energy Marshal - Ironton, OH
Energy Marshal - Ironton, OH

Sheakley Workforce Staffing • Ironton (OH)

On-site
USD 103,000 - 110,000
Energy Marshal / LOTO Superintendent (Mission Critical Data Centers)
Energy Marshal / LOTO Superintendent (Mission Critical Data Centers)

Adams Electric Company • Hamlet (NC)

On-site
USD 120,000 - 150,000
Energy Marshall (Traveling)
Energy Marshall (Traveling)

Consigli Construction • St. Louis (MO)

On-site
USD 120,000 - 180,000