Turn this role into an interview — a resume and cover letter built around what this employer wants.
BlazerJobs, Inc. is seeking a School Speech-Language Pathologist (SLP) for elementary settings in Ellicott City, MD for the 2023-2024 academic year. This long-term substitute contract places SLPs across multiple school sites with collaborative teams of educators and IEP staff.
The role requires a Master’s in Speech-Language Pathology, MD SLP licensure, and preferably CCC-SLP; CFY considered. Caseloads include AAC-facing needs at select sites, with a strong emphasis on progress-driven therapy and
BlazerJobs, Inc. is seeking a School Speech-Language Pathologist (SLP) for elementary settings in Ellicott City, MD for the 2023-2024 academic year. This long-term substitute contract places SLPs across multiple school sites with collaborative teams of educators and IEP staff.
The role requires a Master’s in Speech-Language Pathology, MD SLP licensure, and preferably CCC-SLP; CFY considered. Caseloads include AAC-facing needs at select sites, with a strong emphasis on progress-driven therapy and