Electrical QA/QC Manager - Data Center Construction in Sandersville

Energy Jobline ZR

Sandersville (MS)

Presencial

USD 90.000 - 140.000

Jornada completa

Hace 12 días

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Descripción de la vacante

Confidential Company is seeking an experienced Electrical QA/QC Manager for a major data center construction project in Sandersville, GA. The role focuses on overseeing electrical quality, inspection of underground electrical infrastructure, development of ITPs, and coordination of testing and commissioning readiness.

You will review drawings and documentation, manage NCRs, and ensure compliance with NEC/NFPA standards while maintaining thorough quality records for turnover packages.

Formación

  • 5+ years of electrical construction or QA/QC experience.
  • 3+ years in a dedicated electrical QA/QC role.
  • Experience with underground electrical infrastructure and medium-voltage equipment.
  • Knowledge of NEC and NFPA standards.
  • Ability to interpret electrical one-line diagrams and construction drawings.

Responsabilidades

  • Oversee electrical QA/QC activities during construction.
  • Inspect underground duct banks, conduits, feeders, switchgear, transformers, and power distribution installations.
  • Develop, implement, and maintain electrical Inspection and Test Plans (ITPs).
  • Review drawings, specifications, approved submittals, and installation procedures.
  • Coordinate and document electrical testing (insulation resistance, continuity, hi-pot).
  • Manage nonconformance reports (NCRs), corrective actions, deficiencies, and punch-list items.
  • Coordinate quality inspections with electrical superintendents, testing contractors, engineers, and commissioning teams.
  • Maintain accurate quality records, inspection documentation, and turnover packages.
  • Support electrical system readiness for testing, energization, and commissioning.
  • Ensure compliance with applicable electrical codes and project requirements.

Conocimientos

Electrical QA/QC experience
Organizational skills
Documentation skills
Communication skills

Educación

Electrical trade license

Herramientas

Megger testing equipment
Hi-pot testing equipment

Descripción del empleo

Job DescriptionJob Description

About the Role

We are seeking an experienced Electrical Quality Assurance / Quality Control (QA/QC) Manager for a major data center construction project in Sandersville, Georgia. This position offers an opportunity to oversee electrical installation quality on a large-scale mission-critical construction project involving underground electrical infrastructure, medium-voltage systems, and complex power distribution equipment.

The ideal candidate has extensive electrical construction experience with a strong background in inspections, testing, quality documentation, and commissioning readiness.

Key Responsibilities
  • Oversee electrical quality assurance and quality control activities throughout construction.
  • Inspect underground duct banks, conduit systems, electrical feeders, switchgear, transformers, and power distribution installations.
  • Develop, implement, and maintain electrical Inspection and Test Plans (ITPs).
  • Review electrical drawings, specifications, approved submittals, and installation procedures.
  • Coordinate and document electrical testing, including insulation resistance, continuity, and high-potential testing as applicable.
  • Manage nonconformance reports (NCRs), corrective actions, deficiencies, and punch-list items.
  • Coordinate quality inspections with electrical superintendents, testing contractors, engineers, and commissioning teams.
  • Maintain accurate quality records, inspection documentation, and turnover packages.
  • Support electrical system readiness for testing, energization, and commissioning.
  • Ensure compliance with applicable electrical codes, quality standards, and project requirements.
Required Qualifications
  • 5+ years of electrical construction or electrical QA/QC experience .
  • 3+ years in a dedicated electrical quality control or quality management role .
  • Strong background in commercial, industrial, or mission-critical electrical construction.
  • Experience inspecting underground electrical infrastructure and medium-voltage equipment.
  • Working knowledge of megger testing, hi-pot testing, and electrical inspection procedures.
  • Familiarity with NEC, applicable NFPA standards, and electrical construction specifications.
  • Experience documenting inspections, NCRs, corrective actions, and project turnover.
  • Ability to interpret electrical one-line diagrams, construction drawings, and equipment specifications.
  • Strong organizational, technical documentation, and communication skills.
Qualifications
  • Data center or hyperscale construction experience.
  • Experience with medium-voltage distribution, switchgear, transformers, UPS systems, and electrical infrastructure.
  • Experience supporting electrical commissioning and equipment turnover.
  • Electrical trade license or relevant quality management credentials.
  • Prior experience working for a major electrical construction contractor.
What This Opportunity Offers
  • Highly competitive compensation based on experience.
  • Responsibility for quality oversight of critical electrical infrastructure.
  • Exposure to sophisticated mission-critical construction systems.
  • Potential opportunities for professional advancement.

Company Description

Representing a Confidential Company

Company DescriptionRepresenting a Confidential Company

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Electrical QA/QC Lead - Data Center Construction
Electrical QA/QC Lead - Data Center Construction

Energy Jobline ZR • Sandersville (MS)

Presencial
USD 90.000 - 140.000
Electrical General Foreman - Data Center Construction in Atlanta
Electrical General Foreman - Data Center Construction in Atlanta

Energy Jobline ZR • Atlanta (GA)

Presencial
USD 55.000 - 83.000
Electrical QAQC Manager- Data Centers
Electrical QAQC Manager- Data Centers

Highfield Professional Solutions Ltd • Atlanta (GA)

Presencial
USD 150.000 - 180.000
Full Benefits
Long-term career progression
Senior Quality Manager
Senior Quality Manager

Ascendo Resources, LLC • Atlanta (GA)

Presencial
USD 120.000 - 180.000
Electrical QA / QC Manager - DC Construction
Electrical QA / QC Manager - DC Construction

Data Center Frontier LLC • Lithia Springs (GA)

Presencial
USD 110.000 - 150.000
Medical insurance
401(k) plan
Regional Senior Quality Manager - Electrical Construction
Regional Senior Quality Manager - Electrical Construction

Metric DCX • Atlanta (GA)

Presencial
USD 120.000 - 180.000
Regional Senior Quality Manager
Regional Senior Quality Manager

Highfield Professional Solutions Ltd • Atlanta (GA)

Presencial
USD 85.000 - 115.000
Annual bonus opportunity
Comprehensive medical/dental/vision
401(k) with company match
+2
Electrical Quality Controls Inspector
Electrical Quality Controls Inspector

Giga Energy Inc. • EE. UU.

A distancia
USD 90.000 - 130.000
Electrical QA/QC Lead | Zero-Defect Project Delivery
Electrical QA/QC Lead | Zero-Defect Project Delivery

Just Construction Recruitment • Texas

Presencial
USD 80.000 - 100.000
QA/QC Manager (Electrical) - Hyperscale Data Centers
QA/QC Manager (Electrical) - Hyperscale Data Centers

Goodall Brazier • EE. UU.

Presencial
USD 90.000 - 130.000
Uncapped bonus potential