Earned Value Management (EVM)/Integrated Performance Management (IPM) Analyst – SME Level – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC

Chantilly (VA)

On-site

USD 140,000 - 190,000

Full time

3 days ago
Be an early applicant
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical, dental, vision
Paid leave
Employee referral program

Job summary

Leffler Consulting, LLC in Chantilly, VA seeks an experienced EVM/IPM Analyst to support national security satellite and ground systems. An active Top Secret/SCI clearance with a CI polygraph is required.

The role emphasizes IPM analysis, schedule risk, EVM data integration, and cross-team collaboration to drive objective performance measurements and EACs using Empower, Tableau, and SAFe practices.

Qualifications

  • Master's or Bachelor's with extensive relevant experience.
  • Experience with IPM performance analysis tools.
  • Understanding SAFe methodologies; SAFe certification preferred.
  • Proficiency in Microsoft Office (PowerPoint, Project, Excel) and data analysis.

Responsibilities

  • Perform IPM analysis for space and software intensive systems.
  • Analyze Integrated Master Schedule and critical paths.
  • Integrate cost, schedule, and technical performance data for IPM situational awareness.
  • Collaborate with Government and contractor teams on IPM data and reporting.

Skills

IPM analytics
SAFe methodologies
Analytical thinking
Written & spoken communication

Education

Master's degree
Bachelor's degree

Tools

Empower
Tableau
Full Monte
Schedule Analyzer
JIRA

Job description

Job Description

Leffler Consulting is seeking a seasoned Earned Value Management (EVM)/Integrated Performance Management (IPM) Analyst to join our team in Chantilly providing support to national security satellite and ground systems. An active Top Secret/SCI clearance with a CI polygraph is required.

Location

Chantilly, VA

Job Description

Leffler Consulting is seeking a seasoned Earned Value Management (EVM)/Integrated Performance Management (IPM) Analyst to join our team in Chantilly providing support to national security satellite and ground systems. An active Top Secret/SCI clearance with a CI polygraph is required.

Duties
  • IPM analysis in space and software intensive systems.
  • Integrated Master Schedule analysis including focus on driving and critical path(s); total float analysis for changes to primary, secondary and tertiary critical path(s).
  • Schedule analysis to include duration uncertainty, correlation, sensitivity analysis, risk register integration into schedule risk analysis (SRA) models, probabilistic branching, Monte Carlo simulations, assessing simulation results for senior executive decision making, and independent evaluations and simulations of development Contractor SRAs.
  • Fully integrated analysis of technical, cost and schedule performance for complete program IPM situational awareness.
  • Assist contractor program teams in implementing the Integrated Program Management Data and Analysis Report (IPMDAR) deliverable.
  • Assist Government program offices in understanding how to evaluate, analyze, and interpret IPM data in the new IPMDAR reporting schema.
  • Integrating technical performance with technical performance metrics that drives objective performance measurement (BCWP) and analysis of predictive schedule forecasts and EACs.
  • Independent evaluation of Contractor EVM system(s) and use of modern data driven methods and tools.
  • Assist Government program offices in preparing for and conducting Integrated Baseline Reviews.
  • Provide oversight and implementation guidance related to Program replan and Over Target Baseline / Schedule.
  • Developing independent estimate(s) at complete (EAC) and integrating with the government budget build.
  • Integrating IPM analysis with cross program analysis, cost estimates, GEACs and other cross program analysis activities.
  • Integrating IPM practices with Agile and DevOps methods.
  • Developing requirements for reports that integrate IPM COTS (e.g., Empower) with Agile tools (e.g., JIRA) for integrated performance management reports.
  • Perform other duties as assigned to support corporate initiatives, including but not limited to bid and proposal tasks such as resume reviews and technical writing.
Required Education
  • A master's degree and 15 years of relevant work experience or a bachelor's degree and 17 years of relevant work experience
Required Experience
  • Experience with IPM performance analysis tools
  • Understanding SAFe methodologies, SAFe certification preferred
  • Experience with COTS tools, including Full Monte, Schedule Analyzer for Project, Empower, and Tableau preferred
  • Must be proficient in Microsoft Office, including PowerPoint, Project, and Excel (pivot tables and macros)
  • Excellent analytical skills
  • Strong oral and written communication skills
Desired Education
  • Refer to "Required Education"

Founded in 2001, Leffler Consulting is a women-owned small business (WOSB) headquartered in Chantilly, Virginia. We provide financial management and life-cycle budget and cost support to our nation’s most critical programs in the Intelligence Community (IC) and Department of Defense (DoD). Leffler Consulting specializes in all areas of financial management, audit readiness, and process improvement and controls while also providing a broad array of support functions critical to supporting the mission requirements of our customers. We offer competitive salaries and a generous benefits package, including medical, dental, vision, and disability coverage, paid leave, paid holidays, an employee assistance program, and an employee referral program.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Senior EVM/IPM Analyst — Top Secret/SCI Clearance
Senior EVM/IPM Analyst — Top Secret/SCI Clearance

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 140,000 - 190,000
Medical, dental, vision
Paid leave
Employee referral program
Senior Budget Analyst – TS/SCI Clearance w/CI Poly Required
Senior Budget Analyst – TS/SCI Clearance w/CI Poly Required

Leffler Consulting • Chantilly (VA)

On-site
USD 100,000 - 130,000
Medical coverage
Dental coverage
Vision coverage
+4
Schedule Analyst SME – TS/SCI Clearance w/CI Poly Required
Schedule Analyst SME – TS/SCI Clearance w/CI Poly Required

Leffler Consulting • Chantilly (VA)

On-site
USD 90,000 - 120,000
Medical coverage
Dental coverage
Vision coverage
+4
EVM Analyst
EVM Analyst

Technomics, Inc. • Arlington (VA)

On-site
USD 75,000 - 95,000
Competitive salary
Employee-owned benefits
Mentorship opportunities
Space Systems Engineer – TS/SCI Clearance w/CI Poly Required
Space Systems Engineer – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 120,000 - 165,000
Medical insurance
Dental insurance
Vision insurance
+2
Cost Analyst/Estimator – TS/SCI Clearance w/CI Poly Required
Cost Analyst/Estimator – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 70,000 - 105,000
Medical Insurance
Dental Insurance
Vision Insurance
+5
Space Systems Engineer – TS/SCI Clearance w/CI Poly
Space Systems Engineer – TS/SCI Clearance w/CI Poly

Leffler Consulting • Chantilly (VA)

On-site
USD 120,000 - 160,000
Medical, dental, vision coverage
Disability coverage
Paid leave and holidays
+2
Acquisition Support Engineer – TS/SCI Clearance w/CI Poly Required
Acquisition Support Engineer – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 150,000 - 200,000
EVM Analyst
EVM Analyst

Technomics, Inc. • Troy (MI), Northern (KY)

On-site
USD 90,000 - 130,000
Sr. EVMS Analyst
Sr. EVMS Analyst

Leidos • Huntsville (AL)

On-site
USD 92,000 - 167,000