Director, Transmission & Interconnection — Strategy Leader

Treaty Oak Clean Energy

Austin (TX)

On-site

USD 180,000 - 250,000

Full time

7 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Unlimited PTO
Health benefits
401K

Job summary

Treaty Oak Clean Energy, a leader in utility-scale solar plus storage, is seeking a Director of Transmission and Interconnection in Austin, TX. The role leads interconnection strategy and execution across multiple markets, coordinating with Development, Legal, Finance, and HV Engineering to optimize timelines and costs.

Candidate will oversee interconnection studies, agreements, and stakeholder engagement, with a strong background in transmission planning, market rules, and contract negotiation.

Qualifications

  • 8–10 years of experience in interconnection, project development, or transmission planning.
  • Experience at an IPP, utility, ISO/RTO, or consulting firm is required.
  • Bachelor’s degree in engineering.

Responsibilities

  • Lead interconnection strategy and execution for utility-scale solar and storage projects across ISO and vertically integrated markets.
  • Evaluate transmission tariffs, IRPs, costs, timelines, and queue positions across markets; provide recommendations to project teams.
  • Coordinate interconnection requirements including applications, studies, agreements, and milestones.
  • Negotiate interconnection study results and agreements with utilities toward favorable outcomes.
  • Build relationships with utilities and ISOs; track interconnection progress for timely project completion.
  • Identify optimal interconnection locations based on cross-functional siting criteria.
  • Track tariff changes and key transmission upgrades in target markets.
  • Represent the company in stakeholder and regulatory processes and working groups.

Skills

Interconnection knowledge
Transmission planning
Stakeholder management

Education

Bachelor’s degree in engineering

Tools

PSSe
PSLF
PowerWorld
TARA

Job description

Treaty Oak Clean Energy, a leader in utility-scale solar plus storage, is seeking a Director of Transmission and Interconnection in Austin, TX. The role leads interconnection strategy and execution across multiple markets, coordinating with Development, Legal, Finance, and HV Engineering to optimize timelines and costs.

Candidate will oversee interconnection studies, agreements, and stakeholder engagement, with a strong background in transmission planning, market rules, and contract negotiation.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Director of Transmission Interconnection – Renewable Energy
Director of Transmission Interconnection – Renewable Energy

Origisenergy • Austin (TX)

Hybrid
USD 95,000 - 125,000
Employer paid health insurance
Paid time off
401(k) plan with employer matching contributions
Director, Transmission and Interconnection
Director, Transmission and Interconnection

Treaty Oak Clean Energy • Austin (TX)

On-site
USD 180,000 - 250,000
Unlimited PTO
Health benefits
401K
Head of Transmission & Interconnection Strategy
Head of Transmission & Interconnection Strategy

Valid8 Financial, Inc. • Albuquerque (NM)

On-site
USD 190,000 - 220,000
Director, Transmission & Interconnection Strategy
Director, Transmission & Interconnection Strategy

Avantus • San Diego (CA)

Hybrid
USD 127,000 - 191,000
401(k) matching
Medical and dental plan options
Flexible PTO
Lead Transmission Planning & Interconnection Strategist
Lead Transmission Planning & Interconnection Strategist

Viridan Group • San Antonio (TX)

On-site
USD 150,000 - 185,000
Grid Interconnection Strategy Lead – Solar & Storage Remote
Grid Interconnection Strategy Lead – Solar & Storage Remote

Recurrent Energy • Austin (TX)

Hybrid
USD 120,000 - 180,000
Senior Manager, Interconnection Strategy & Execution
Senior Manager, Interconnection Strategy & Execution

Urban Grid Solar Projects, LLC • Georgia

Hybrid
USD 100,000 - 150,000
Medical, dental, vision insurance
Health savings account
Paid paternal leave
+1
Interconnection & Transmission Strategy Associate
Interconnection & Transmission Strategy Associate

Avantus • San Diego (CA)

On-site
USD 85,000 - 101,000
401(k) matching
Medical and dental options
Flexible PTO
Director of Transmission Strategy & Interconnection
Director of Transmission Strategy & Interconnection

Exus Renewables North America Open Roles • Pittsburgh

On-site
USD 120,000 - 150,000
Grid Interconnection & Transmission Planning Lead
Grid Interconnection & Transmission Planning Lead

AVA Energy • Austin (TX)

On-site
USD 120,000 - 180,000