Datacenter Construction Project Manager (Full-Time)

MBP

Cheltenham (MD)

On-site

USD 122,000 - 185,000

Full time

14 days+
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Benefits offered by this job

Competitive compensation with bonuses
Paid time off
Employer-paid health benefits
401(k) with match
Tuition assistance
Training & development
Wellness program

Job summary

MBP is seeking experienced leaders to support delivery of complex projects in the Washington/Baltimore DC metropolitan area. This senior position focuses on on-site owner representation for large-scale construction, ensuring cost control, schedule adherence, and quality across lab, data center, or secure facilities with SCIFs.

The ideal candidate has extensive CQM/CCM exposure and a proven track record in construction management, QA, and project controls, with strong client-facing and

Qualifications

  • High school diploma (GED) plus 15 years of related experience and/or education.
  • Bachelor’s degree in engineering, architecture, construction management, or related field, plus 10 years of related experience.
  • Possess OSHA 30-hour certification or obtain within 3 months of hire.
  • Working knowledge of basic mathematics, including computations based on field measurements.
  • Construction-related training or a combination of education and experience that demonstrates the ability to perform the job.
  • Knowledge of codes, materials, methods, and tools utilized in construction, repair, or renovation work.
  • Preferred certifications include CQM (Construction Quality Management), CCM (Certified Construction Manager), Journeyman or Master certification/license.
  • Knowledge of construction practices, principles of construction management and project controls, with working knowledge in areas including scheduling, cost estimating, documentation, contract administration, and construction techniques.

Responsibilities

  • Provide pre-construction and on-site owner representation for medium— to large-scale construction projects, either as part of a team or working independently, depending on the project's size and complexity.
  • Responsibilities include managing cost, schedule, and/or quality on behalf of the client/owner.
  • Working collaboratively with the project delivery team to proactively identify risks and issues and develop mitigation strategies.
  • Reviewing project schedules to verify they are complete, feasible, and reasonable.
  • Reviewing and tracking progress against the accepted schedule.
  • Participate and/or lead progress meetings. Prepare meeting minutes or review meeting minutes prepared by others to verify completeness and accuracy.
  • Provide quality management, including participation in preparatory/pre-installation meetings, and perform or oversee the performance of Quality Assurance (QA) inspections to verify that work is being performed in compliance with contract requirements.
  • Document and track issues until resolution, including working collaboratively with the contractor, designer, and owner to resolve issues as they arise.
  • Review change order proposals for entitlement and price, and lead or assist in negotiations.
  • Coordinate and oversee commissioning agent and other third-party owner contractors.
  • Coordinate punchlist and acceptance with the designer and other project stakeholders.
  • Monitor and verify completion of closeout requirements, including owner training, operations and maintenance manuals, warranties, and stock materials.

Skills

Independent work
Client interface
Project documentation
Quality assurance/control
Microsoft Office proficiency
Reading plans/specs
Communication (verbal/written)
Certifications readiness
On-site navigation
Problem solving

Education

GED plus 15 years experience
Bachelor's in engineering/architecture/construction management
OSHA 30-hour certification
Math aptitude for field measurements
Construction training/experiential knowledge
Codes/materials/methods knowledge
CQM/CCM or Journeyman/Master certs
Project controls knowledge (scheduling/cost/docs)

Job description

EXPERIENCE QUALIFICATION

MBP is seeking leaders in the design and construction industry to support the delivery of complex projects and programs. For this position, we seek candidates in the Washington/Baltimore DC metropolitan area with 10 or more years of combined education and/or experience and demonstrated advanced knowledge and expertise in the installation of complex Mechanical, Electrical, Plumbing, and/or related systems. Experience in supporting the successful delivery of new and/or renovated laboratory, data center, and/or secure facilities with SCIFs is desired. Evidence of progressive career development and demonstrated expertise in quality control, quality assurance, construction management, field engineering, or related fields.

MAIN DUTIES

Duties include providing pre-construction and on-site owner representation for medium— to large-scale construction projects, either as part of a team or working independently, depending on the project's size and complexity. Responsibilities include managing cost, schedule, and/or quality on behalf of the client/owner. Typical duties include

  • Working collaboratively with the project delivery team to proactively identify risks and issues and develop mitigation strategies.
  • Reviewing project schedules to verify they are complete, feasible, and reasonable. Specific scheduling experience is not required, but it is desired.
  • Reviewing and tracking progress against the accepted schedule.
  • Participate and/or lead progress meetings. Prepare meeting minutes or review meeting minutes prepared by others to verify completeness and accuracy.
  • Provide quality management, including participation in preparatory/pre-installation meetings, and perform or oversee the performance of Quality Assurance (QA) inspections to verify that work is being performed in compliance with contract requirements.
  • Document and track issues until resolution, including working collaboratively with the contractor, designer, and owner to resolve issues as they arise.
  • Review change order proposals for entitlement and price, and lead or assist in negotiations.
  • Coordinate and oversee commissioning agent and other third-party owner contractors.
  • Coordinate punchlist and acceptance with the designer and other project stakeholders.
  • Monitor and verify completion of closeout requirements, including owner training, operations and maintenance manuals, warranties, and stock materials.
EDUCATION / KNOWLEDGE
  • High school or General Equivalency Diploma (GED), plus 15 years of related experience and/or education.
  • Bachelor’s degree in engineering, architecture, construction management, or related field, plus 10 years of related experience.
  • Possess OSHA 30-hour certification or obtain within 3 months of hire.
  • Working knowledge of basic mathematics, including computations based on field measurements.
  • Considerable construction-related training or a combination of education and experience that demonstrates the ability to perform the job.
  • Knowledge of codes, materials, methods, and tools utilized in construction, repair, or renovation work.
  • Preferred certifications include CQM (Construction Quality Management), CCM (Certified Construction Manager), Journeyman or Master certification/license.
  • Knowledge of construction practices, principles of construction management and project controls, with working knowledge in areas including scheduling, cost estimating, documentation, contract administration, and construction techniques.
SKILLS AND ABILITIES
  • Ability to work independently and handle all aspects of a project, including client interface, technical issues, documentation, and reporting.
  • Exercises tact and diplomacy in dealing with sensitive and complex issues and situations.
  • Ability to identify potential problems and derive recommended solutions from past experiences.
  • Specialized expertise with quality assurance and quality control techniques.
  • Must have computer skills and be proficient in using Microsoft Office applications, Email, Internet navigation, web-based tools, and other specialized equipment.
  • Ability to read and interpret plans and contract specifications.
  • Ability to communicate quality issues effectively and responsibly (verbally and in writing) with internal and external customers (i.e., contractors, owners, subconsultants, designers, architects, and fellow team members).
  • Ability to obtain and maintain required certifications.
  • Ability to stand and sit as needed on project work sites, climb ladders, work at heights, and work outdoors in a wide range of weather conditions.
  • Ability to safely navigate construction work sites with uneven terrain.
SPECIAL REQUIREMENTS
  • Criminal history background check, reference verification, and work history will be required prior to employment.
  • Must be a US Citizen.
STATUS

Full-time.

The base salary range for this position is $122,000.00 to $185,000.00. Actual compensation will be determined based on work location, qualifications, experience, job-related skills, and relevant education or training.

BENEFITS
  • Competitive compensation with opportunities for semi-annual bonuses.
  • Generous Paid Time Off and holiday schedules.
  • 100% Employer paid medical, dental, vision, life, AD&D, and disability benefits (for individual).
  • Health Savings Account with company contribution.
  • 401(k)/Roth 401(k) plan with company match.
  • Tuition Assistance and Student Loan Reimbursement.
  • Numerous Training and Professional Development opportunities.
  • Wellness Program & Fitness Program Reimbursement.

Applicants must be authorized to work in the U.S. without sponsorship.

MBP is an equal opportunity employer and does not discriminate on the basis of any legally protected status or characteristic. Protected veterans and individuals with disabilities are encouraged to apply.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Datacenter Construction Project Manager (Full-Time)
Datacenter Construction Project Manager (Full-Time)

MBP • Columbia (MD)

On-site
USD 110,000 - 185,000
Competitive compensation with bonuses
Generous Paid Time Off
100% Employer paid medical benefits
+2
Datacenter Construction Project Manager (Full-Time)
Datacenter Construction Project Manager (Full-Time)

MBP (McDonough Bolyard Peck) • Columbia (MD)

On-site
USD 122,000 - 185,000
Competitive compensation
Annual bonuses
Employer-paid health benefits
+4
MEP Construction Project Manager (Full-Time)
MEP Construction Project Manager (Full-Time)

MBP • Cheltenham (MD)

On-site
USD 122,000 - 185,000
Bonuses
PTO
Medical benefits
+3
Architectural Construction Manager (Full-Time)
Architectural Construction Manager (Full-Time)

MBP (McDonough Bolyard Peck) • Columbia (MD)

On-site
USD 100,000 - 130,000
Semi-annual bonuses
Paid time off
Employer-paid medical, dental, vision
+1
MEP Construction Project Manager (Full-Time)
MEP Construction Project Manager (Full-Time)

MBP (McDonough Bolyard Peck) • Columbia (MD)

On-site
USD 122,000 - 185,000
Competitive compensation with semi-ann
Generous paid time off
100% employer paid medical, dental, &
+5
Construction Project Manager (Full-Time)
Construction Project Manager (Full-Time)

MBP (McDonough Bolyard Peck) • Columbia (MD)

On-site
USD 123,000 - 178,000
Paid Time Off
Health benefits
401(k) plan with match
+2
Architectural Construction Manager (Full-Time)
Architectural Construction Manager (Full-Time)

MBP • Cheltenham (MD)

On-site
USD 100,000 - 130,000
Semi-annual bonuses
Generous PTO
Full medical benefits
+5
Senior Construction Project Manager (Full-Time)
Senior Construction Project Manager (Full-Time)

MBP • Cheltenham (MD)

On-site
USD 122,000 - 185,000
Competitive compensation with bonuses
Generous paid time off
Employer-paid medical/dental/vision
+5
Construction Project Manager (Full-Time)
Construction Project Manager (Full-Time)

MBP • Columbia (MD)

On-site
USD 123,000 - 178,000
Bonus opportunities
Paid time off
Employer-paid medical/dental/vision/l_
+5
Architectural Construction Manager (Full-Time)
Architectural Construction Manager (Full-Time)

MBP (McDonough Bolyard Peck) • Bethesda (MD)

On-site
USD 95,000 - 110,000
Competitive compensation with bonuses
Paid Time Off
Employer paid medical benefits
+2