Data Center Construction QA Lead (Owner’s Rep)

Worldwide Mission Critical

Dallas (TX)

On-site

USD 110,000 - 150,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Worldwide Mission Critical is seeking a Data Center Construction Quality Assurance Manager (QA) to act as Owner’s Representative for mission-critical data center projects.

QA will work with owner, project managers, project engineers, general contractors, trade partners, equipment vendors, design and engineering consultants, and commissioning agents to assure that all installed product meets or exceeds contract documents and industry standards.

Qualifications

  • Bachelor’s degree in Electrical Engineering, Mechanical Engineering, or Construction Management preferred.
  • 10+ years of QA/QC experience on data centers or mission-critical build projects.
  • OSHA 30; First Aid/CPR; or able to obtain within first 90 days of hire.
  • LEED AP highly preferred, but not required.
  • Familiarity with NFPA, NEC, IBC and life safety standards.

Responsibilities

  • Develop and maintain project QA/QC Plan inclusive of inspections and corrective actions.
  • Thoroughly understand drawings, specifications, RFIs, submittals, shop drawings, MSDS.
  • Perform cadenced inspections to ensure conformance with contract documents.
  • Report quality deficiencies to General Contractor and trade partners via project platform.
  • Drive corrective actions and root-cause analyses when required.
  • Audit BIM for key geometries, dimensions, and pathways.
  • Lead weekly QA/QC meetings with General Contractor and trade partners.
  • Provide daily quality summaries and weekly owner reports.
  • Verify materials and equipment meet submittals and are safely stored.
  • Travel as required to project sites.

Skills

Excellent communication skills
Interpersonal skills
Travel readiness
Team leadership
Quality assurance

Education

Bachelor’s degree in Electrical Engineering, Mechanical Engineering, or Construction Management preferred

Tools

Procore
BlueBeam Revu
Autodesk Cloud

Job description

Worldwide Mission Critical is seeking a Data Center Construction Quality Assurance Manager (QA) to act as Owner’s Representative for mission-critical data center projects.

QA will work with owner, project managers, project engineers, general contractors, trade partners, equipment vendors, design and engineering consultants, and commissioning agents to assure that all installed product meets or exceeds contract documents and industry standards.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Mission-Critical Data Center QA Leader
Mission-Critical Data Center QA Leader

Worldwide Mission Critical • Little Rock (AR)

On-site
USD 120,000 - 160,000
Data Center QA/QC Manager | 50% Travel | Owner's Rep
Data Center QA/QC Manager | 50% Travel | Owner's Rep

KALCON • Georgia

On-site
USD 130,000 - 200,000
Medical insurance
Dental insurance
Vision insurance
+4
Data Center QA/QC Lead for Mission Critical Projects
Data Center QA/QC Lead for Mission Critical Projects

Pogue Construction • Athens (TX)

On-site
USD 120,000 - 160,000
On-Site QA/QC Lead for Mission-Critical Data Centers
On-Site QA/QC Lead for Mission-Critical Data Centers

DataX Connect • United States

On-site
USD 130,000 - 200,000
Medical plan
Dental & vision coverage
401(k) with company match
+4
Data Center Construction Quality Assurance Manager
Data Center Construction Quality Assurance Manager

Worldwide Mission Critical • Dallas (TX)

On-site
USD 110,000 - 150,000
Data Center QA/QC Lead — Mission-Critical Quality
Data Center QA/QC Lead — Mission-Critical Quality

Pogue Construction • Wills Point (TX)

On-site
USD 120,000 - 180,000
Data Center QA/QC Lead — Mission Critical
Data Center QA/QC Lead — Mission Critical

Pogue Construction • Tyler (TX)

On-site
USD 110,000 - 170,000
Data Center QA/QC Manager — Lead Quality for Critical Builds
Data Center QA/QC Manager — Lead Quality for Critical Builds

ARCO National Construction Company • St. Louis (MO)

On-site
USD 110,000 - 170,000
Bonus program
ESOP
401k
+8
Data Center QA/QC Leader – Mission Critical Projects
Data Center QA/QC Leader – Mission Critical Projects

Pogue Construction • Kaufman (TX)

On-site
USD 90,000 - 130,000
Data Center Construction Quality Assurance Manager
Data Center Construction Quality Assurance Manager

Worldwide Mission Critical • Little Rock (AR)

On-site
USD 120,000 - 160,000