Data Center Construction Managers

AECOM Corporation

Las Vegas (NV)

On-site

USD 160,000 - 195,000

Full time

4 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

AECOM is seeking a Data Center Construction Manager to be onsite in Las Vegas, NV. You will inspect mechanical and electrical systems, review shop drawings, and monitor installation, testing, and commissioning to ensure compliance with contract requirements.

The role requires a BA/BS plus eight years of experience (or equivalent). Preferred: CQM or related certifications; Bachelor’s in CM/engineering/architecture. Onboarding at an AECOM office is required.

Qualifications

  • BA/BS plus eight years of relevant experience or demonstrated equivalency of experience and/or education.
  • 7 years of experience with construction and/or quality management.
  • Bachelor’s degree in construction management, engineering, or architecture.

Responsibilities

  • Inspect building systems (mechanical and electrical) for compliance with contract requirements.
  • Review contractor shop drawings and submittals for alignment with project specs.
  • Monitor installation, testing, and commissioning of electrical and mechanical systems.
  • Identify and report non-conformances, coordinating with contractors and engineers for corrective actions.
  • Maintain detailed inspection reports, logs, and records for quality control and compliance tracking.
  • Oversee corrective actions for unacceptable construction work and support final inspections and closeouts.
  • Witness and document critical tests, such as pressure and leak tests and system startups.
  • Verify quality of materials, workmanship, and equipment installations to project specs.
  • Work with contractors, engineers, and inspectors to resolve issues on-site.
  • Represent the Client in alignment with contract requirements and project deliverables.
  • Coordinate client outage/shutdown procedures and the GC workplan.

Skills

Construction management
Quality management

Education

BA/BS in related field
Bachelor’s degree in CM/engineering/architecture

Job description

  • Legal Entity: AECOM Technical Services Inc
  • Business Line: PPM
  • Work Location Model: On-Site
  • Primary Location: US - Las Vegas, NV - 181 E Warm Spri
  • Compensation: USD 160,000 - USD 195,000 - yearly
Company Description

Work with Us. Change the World.

At AECOM, we're delivering a better world. Whether improving your commute, keeping the lights on, providing access to clean water, or transforming skylines, our work helps people and communities thrive. We are the world's trusted infrastructure consulting firm, partnering with clients to solve the world’s most complex challenges and build legacies for future generations.

There has never been a better time to be at AECOM. With accelerating infrastructure investment worldwide, our services are in great demand. We invite you to bring your bold ideas and big dreams and become part of a global team of over 50,000 planners, designers, engineers, scientists, digital innovators, program and construction managers and other professionals delivering projects that create a positive and tangible impact around the world.

We're one global team driven by our common purpose to deliver a better world. Join us.

Job Description

AECOMis seekingData Center Construction Managers. This position will be onsite in Las Vegas, Nevada.

Job responsibilities include and are not limited to the following:

  • Inspect building systems, including mechanical and electrical, for compliance with contract requirements and industry standards.
  • Review contractor shop drawings and submittals to confirm alignment with project specifications.
  • Monitor the installation, testing, and commissioning of electrical and mechanical systems, confirming proper functionality and performance.
  • Identify and report non-conformances, coordinating with contractors and engineers to implement corrective actions.
  • Maintain detailed inspection reports, logs, and records for quality control and compliance tracking.
  • Oversee corrective actions for unacceptable construction work and support final inspections, punch lists, and project closeouts.
  • Witness and document critical tests, such as pressure tests, leak tests, and system start-ups.
  • Verify the quality of materials, workmanship, and equipment installations to confirm adherence to project specifications.
  • Work closely with contractors, engineers, and other inspectors to resolve issues.
  • Maintain professionalism in attire and communication during all time on site and in meetings.
  • Represent the Client in alignment with contract requirements and project deliverables.
  • Coordinate client Outage / Shutdown Procedure.
  • Coordinate GC Workplan and advise if the construction contractor fails to promptly remove, correct, or replace unacceptable construction work, and assess any delays caused by such failure.
Qualifications
  • BA/BS plus eight years of relevant experience or demonstrated equivalency of experience and/or education.

Preferred Requirements:

  • 7 years of experience with construction and/or quality management.
  • CQM or other professional certifications.
  • Bachelor’s degree in construction management, engineering, or architecture.
Additional Information
  • Sponsorship for US employment authorization is not available now or in the future for this position.
  • Relocation is not available for this position.

To support this commitment, all newly hired employees are required to attend an in-person Day 1 onboarding at an AECOM office location as a condition of employment.

About AECOM

AECOM is proud to offer comprehensive benefits to meet the diverse needs of our employees. Depending on your employment status, AECOM benefits may include medical, dental, vision, life, AD&D, disability benefits, paid time off, leaves of absences, voluntary benefits, perks, flexible work options,well-being resources, employee assistance program, business travel insurance, service recognition awards, retirement savings plan, and employee stock purchase plan.

AECOM is the global infrastructure leader, committed to delivering a better world. As a trusted professional services firm powered by deep technical abilities, we solve our clients’ complex challenges in water, environment, energy, transportation and buildings. Our teams partner with public- and private-sector clients to create innovative, sustainable and resilient solutions throughout the project lifecycle – from advisory, planning, design and engineering to program and construction management. AECOM is a Fortune 500 firm that had revenue of $16.1 billion in fiscal year 2025. Learn more at aecom.com.

What makes AECOM a great place to work

You will be part of a global team that champions your growth and career ambitions. Work on groundbreaking projects - both in your local community and on a global scale - that are transforming our industry and shaping the future. With cutting-edge technology and a network of experts, you’ll have the resources to make a real impact. Our award-winning training and development programs are designed to expand your technical expertise and leadership skills, helping you build the career you’ve always envisioned. Here, you’ll find a welcoming workplace built on respect, collaboration and community—where you have the freedom to grow in a world of opportunity.

As an Equal Opportunity Employer, we believe in your potential and are here to help you achieve it. All your information will be kept confidential according to EEO guidelines.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center Construction Managers
Data Center Construction Managers

AECOM • White Hills (AZ)

On-site
USD 160,000 - 195,000
Data Center Construction Managers
Data Center Construction Managers

AECOM Corporation • Boulder City (NV)

On-site
USD 160,000 - 195,000
Data Center Construction Managers
Data Center Construction Managers

AECOM Corporation • Mount Charleston (NV)

On-site
USD 160,000 - 195,000
Data Center Construction Managers
Data Center Construction Managers

AECOM • Las Vegas (NV)

On-site
USD 160,000 - 195,000
Data Center Construction Managers
Data Center Construction Managers

AECOM • White Hills (AZ)

On-site
USD 160,000 - 195,000
Senior Data Center Construction Managers
Senior Data Center Construction Managers

AECOM • White Hills (AZ)

On-site
USD 160,000 - 205,000
Senior Data Center Construction Managers
Senior Data Center Construction Managers

AECOM • Mount Charleston (NV)

On-site
USD 160,000 - 205,000
Data Center Construction Managers
Data Center Construction Managers

Aecom2 • Las Vegas (NV)

On-site
USD 120,000 - 160,000
Medical, dental, vision benefits
Paid time off
Retirement savings plan
Senior Data Center Construction Manager
Senior Data Center Construction Manager

AECOM • North Las Vegas (NV)

On-site
USD 200,000 - 250,000
Senior Data Center Construction Managers
Senior Data Center Construction Managers

Aecom2 • Las Vegas (NV)

On-site
USD 120,000 - 150,000