Data Center Construction Managers

AECOM

Las Vegas (NV)

Presencial

USD 160.000 - 195.000

Jornada completa

hace 25 horas
Sé de los primeros/as/es en solicitar esta vacante

Consigue una respuesta de este empleador

Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.

Supera los filtros ATS

Descripción de la vacante

AECOM is seeking a Data Center Construction Manager to oversee critical electrical and mechanical systems onsite in Las Vegas, NV. You will review shop drawings, monitor installation and testing, and ensure compliance with contract requirements and project specs.

The role requires a BA/BS with eight years of relevant experience, or equivalent, and offers a compensation range of $160,000 to $195,000 per year. Onsite work and day-one onboarding are required, with relocation not available.

Formación

  • BA/BS plus eight years of relevant experience or demonstrated equivalency of experience and/or education.
  • Preferred: 7 years of construction and/or quality management experience.
  • CQM or other professional certifications.

Responsabilidades

  • Inspect building systems, including mechanical and electrical, for compliance with contract requirements and industry standards.
  • Review contractor shop drawings and submittals to confirm alignment with project specifications.
  • Monitor the installation, testing, and commissioning of electrical and mechanical systems, confirming proper functionality and performance.
  • Identify and report non-conformances, coordinating with contractors and engineers to implement corrective actions.
  • Maintain detailed inspection reports, logs, and records for quality control and compliance tracking.
  • Oversee corrective actions for unacceptable construction work and support final inspections, punch lists, and project closeouts.
  • Witness and document critical tests, such as pressure tests, leak tests, and system start-ups.
  • Verify the quality of materials, workmanship, and equipment installations to confirm adherence to project specifications.
  • Work closely with contractors, engineers, and other inspectors to resolve issues.
  • Maintain professionalism in attire and communication during all time on site and in meetings.
  • Represent the Client in alignment with contract requirements and project deliverables.
  • Coordinate client Outage / Shutdown Procedure.
  • Coordinate GC Workplan and advise if the construction contractor fails to promptly remove, correct, or replace unacceptable construction work, and assess any delays caused by such failure.

Conocimientos

Construction management
Quality management
CQM certification

Educación

Bachelor's degree in construction management, engineering, or architecture

Descripción del empleo

Company Description

Work with Us. Change the World.

At AECOM, we're delivering a better world. Whether improving your commute, keeping the lights on, providing access to clean water, or transforming skylines, our work helps people and communities thrive. We are the world's trusted infrastructure consulting firm, partnering with clients to solve the world’s most complex challenges and build legacies for future generations.

There has never been a better time to be at AECOM. With accelerating infrastructure investment worldwide, our services are in great demand. We invite you to bring your bold ideas and big dreams and become part of a global team of over 50,000 planners, designers, engineers, scientists, digital innovators, program and construction managers and other professionals delivering projects that create a positive and tangible impact around the world.

We're one global team driven by our common purpose to deliver a better world. Join us.

Job Description

AECOM is seeking Data Center Construction Managers. This position will be onsite in Las Vegas, Nevada.

  • Inspect building systems, including mechanical and electrical, for compliance with contract requirements and industry standards.
  • Review contractor shop drawings and submittals to confirm alignment with project specifications.
  • Monitor the installation, testing, and commissioning of electrical and mechanical systems, confirming proper functionality and performance.
  • Identify and report non-conformances, coordinating with contractors and engineers to implement corrective actions.
  • Maintain detailed inspection reports, logs, and records for quality control and compliance tracking.
  • Oversee corrective actions for unacceptable construction work and support final inspections, punch lists, and project closeouts.
  • Witness and document critical tests, such as pressure tests, leak tests, and system start-ups.
  • Verify the quality of materials, workmanship, and equipment installations to confirm adherence to project specifications.
  • Work closely with contractors, engineers, and other inspectors to resolve issues.
  • Maintain professionalism in attire and communication during all time on site and in meetings.
  • Represent the Client in alignment with contract requirements and project deliverables.
  • Coordinate client Outage / Shutdown Procedure.
  • Coordinate GC Workplan and advise if the construction contractor fails to promptly remove, correct, or replace unacceptable construction work, and assess any delays caused by such failure.
Qualifications

Minimum Requirements

  • BA/BS plus eight years of relevant experience or demonstrated equivalency of experience and/or education.

Preferred Requirements:

  • 7 years of experience with construction and/or quality management.
  • CQM or other professional certifications.
  • Bachelor’s degree in construction management, engineering, or architecture.
Additional Information
  • Sponsorship for US employment authorization is not available now or in the future for this position.
  • Relocation is not available for this position.

At AECOM, we are committed to maintaining a secure and trustworthy recruitment process and take any fraudulent hiring activity seriously.

To support this commitment, all newly hired employees are required to attend an in‑person Day 1 onboarding at an AECOM office location as a condition of employment.

Offered rate of compensation will be based on individual education, qualifications, experience, and work location. The range for this position is $160000 to $195000.

About AECOM

AECOM is proud to offer comprehensive benefits to meet the diverse needs of our employees. Depending on your employment status, AECOM benefits may include medical, dental, vision, life, AD&D, disability benefits, paid time off, leaves of absences, voluntary benefits, perks, flexible work options, well‑being resources, employee assistance program, business travel insurance, service recognition awards, retirement savings plan, and employee stock purchase plan.

AECOM is the global infrastructure leader, committed to delivering a better world. As a trusted professional services firm powered by deep technical abilities, we solve our clients' complex challenges in water, environment, energy, transportation and buildings. Our teams partner with public- and private-sector clients to create innovative, sustainable and resilient solutions throughout the project lifecycle - from advisory, planning, design and engineering to program and construction management. AECOM is a Fortune 500 firm that had revenue of $16.1 billion in fiscal year 2025. Learn more at aecom.com.

What makes AECOM a great place to work

You will be part of a global team that champions your growth and career ambitions. Work on groundbreaking projects - both in your local community and on a global scale - that are transforming our industry and shaping the future. With cutting‑edge technology and a network of experts, you’ll have the resources to make a real impact. Our award‑winning training and development programs are designed to expand your technical expertise and leadership skills, helping you build the career you’ve always envisioned. Here, you’ll find a welcoming workplace built on respect, collaboration and community—where you have the freedom to grow in a world of opportunity.

As an Equal Opportunity Employer, we believe in your potential and are here to help you achieve it. All your information will be kept confidential according to EEO guidelines.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Data Center Construction Managers
Data Center Construction Managers

AECOM • White Hills (AZ)

Presencial
USD 160.000 - 195.000
Data Center Construction Managers
Data Center Construction Managers

AECOM • White Hills (AZ)

Presencial
USD 160.000 - 195.000
Data Center Construction Managers
Data Center Construction Managers

Aecom2 • Las Vegas (NV)

Presencial
USD 120.000 - 160.000
Medical, dental, vision benefits
Paid time off
Retirement savings plan
Senior Data Center Construction Managers
Senior Data Center Construction Managers

AECOM • White Hills (AZ)

Presencial
USD 160.000 - 205.000
Senior Data Center Construction Managers
Senior Data Center Construction Managers

AECOM • Mount Charleston (NV)

Presencial
USD 160.000 - 205.000
Senior Data Center Construction Manager
Senior Data Center Construction Manager

AECOM • North Las Vegas (NV)

Presencial
USD 200.000 - 250.000
Senior Data Center Construction Managers
Senior Data Center Construction Managers

AECOM • Las Vegas (NV)

Presencial
USD 160.000 - 205.000
Senior Data Center Construction Managers
Senior Data Center Construction Managers

AECOM • White Hills (AZ)

Presencial
USD 160.000 - 205.000
Senior Data Center Construction Manager
Senior Data Center Construction Manager

AECOM • North Las Vegas (NV)

Presencial
USD 200.000 - 250.000
Senior Data Center Construction Managers
Senior Data Center Construction Managers

AECOM • Denver (CO)

Presencial
USD 175.000 - 225.000