Construction Scheduler - Mobile Construction

X.ai

Southaven (MS)

On-site

USD 90,000 - 130,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Per diem

Job summary

SpaceXSI, a SpaceX subsidiary, seeks a Construction Scheduler to develop CPM baselines and maintain live schedules for projects starting in Memphis, TN and Southaven, MS. You will challenge sequences, flag risks early, and communicate recovery options to leadership.

You will work with field teams, project managers, estimators, and suppliers to reflect committed dates, not wishes, and travel as assignments shift within the mobile construction team.

Qualifications

  • 4+ years of construction scheduling on active projects.
  • 4+ years of using Smartsheet, MS Project, or similar PM tools.
  • 4+ years with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE).

Responsibilities

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and sequences.
  • Maintain live schedule with progress from field and updates on cadence.
  • Own the critical path and explain end-date movements and recovery plans.
  • Produce three-week look-aheads aligned with master schedule.
  • Analyze schedule impact of RFIs, changes, weather, and labor shortages; prepare TIAs and scenarios.
  • Coordinate with PMs, superintendents, estimators, procurement, design, and owners/CMs.
  • Resource-load and cost-load where required; flag resource issues.
  • Prepare narratives, variance reports, S-curves, histograms, and exec summaries for reviews.

Skills

Construction scheduling
Smartsheet
MS Project
DCMA 14-point
USACE metrics
Last Planner
Power BI
Procore
Navisworks (BIM 4D)

Education

Bachelors in construction management or civil engineering

Tools

Smartsheet
MS Project
Procore
Autodesk Construction Cloud
Navisworks

Job description

SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today, SpaceX is actively developing the technologies to make this possible, with the ultimate goal of making life multiplanetary and expanding consciousness to the stars.
SpaceXSI is building Super Intelligence to help humanity understand the universe. Our teams are building the full Super Intelligence stack: from our Colossus supercomputers, to Grok models, to our suite of applications, including Grok Bot, Grok Build, Grok Imagine, Grok Voice, and X. We're creating a powerful flywheel where more compute trains better models, better models power more useful products, and what we learn from people using those products shapes what we build next.

CONSTRUCTION SCHEDULER

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.
The team goes where the next site is - a pad, a factory, a supercluster, whatever has to exist before the rest of the company can move. Right now that is Memphis, TN / Southaven, MS. Then it is the next one. Per diem comes with the assignment.

RESPONSIBILITIES:
  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly)
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates)
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model
  • Visit the site regularly. A scheduler who never walks the job will be wrong
  • Relocate with the mobile team as assignments change, starting in Memphis, TN / Southaven, MS
BASIC QUALIFICATIONS:
  • 4+ years of construction scheduling on active projects (GC, CM, owner's project controls, or specialty contractor)
  • 4+ years of experience using Smartsheet, MS Project, or other project management tool
  • 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
PREFERRED SKILLS AND EXPERIENCE:
  • Comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints)
  • Bachelor’s in construction management, civil engineering, or a related field; OR equivalent field experience
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential
  • Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
  • Forensic delay analysis, time-impact analysis, and claims support
  • Cost/resource loading, earned value, and integration with cost systems
  • Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus
  • Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud
ADDITIONAL REQUIREMENTS:
  • Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence
  • This role is part of the mobile construction team and you will be expected to travel to the assigned work project. Current work assignment is based in Memphis, TN / Southaven, MS. Future assignments will require relocation to other U.S. construction sites. Per diem is provided while on assignment
  • Must be comfortable working in a fully onsite environment
  • Must be willing to work any shift, extended hours and/or holidays during assigned work assignment. This includes rotating shifts, nights and/or weekends. If you are assigned night shift, you will receive a shift differential for hours worked during off nominal hours
  • Must be willing to work in industrial environments with exposure to noise, heavy equipment, excavations, and energized electrical systems. Must be able to lift 25 lbs+ unassisted and perform physically demanding tasks outdoors/indoors, tight conditions and/or at heights

SpaceXSI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Scheduler: CPM, Lookaheads & Field Coordination
Construction Scheduler: CPM, Lookaheads & Field Coordination

Maven Ventures • Southaven (MS)

On-site
USD 55,000 - 90,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

Maven Ventures • Southaven (MS)

On-site
USD 55,000 - 90,000
Construction Superintendent, Structural - Mobile Construction
Construction Superintendent, Structural - Mobile Construction

X.ai • Southaven (MS)

On-site
USD 90,000 - 140,000
Construction Superintendent, Fluid/Mechanical - Mobile Construction
Construction Superintendent, Fluid/Mechanical - Mobile Construction

SpaceX Super Intelligence • Memphis (TN)

On-site
USD 90,000 - 130,000
Construction Superintendent, Fluid/Mechanical - Mobile Construction
Construction Superintendent, Fluid/Mechanical - Mobile Construction

SpaceX Super Intelligence • Southaven (MS)

On-site
USD 110,000 - 160,000
Per diem
Construction Superintendent, Fluid/Mechanical - Mobile Construction
Construction Superintendent, Fluid/Mechanical - Mobile Construction

X.ai • Southaven (MS)

On-site
USD 90,000 - 130,000
Per diem provided
Construction Superintendent, Electrical - Mobile Construction
Construction Superintendent, Electrical - Mobile Construction

SpaceX Super Intelligence • Memphis (TN)

On-site
USD 120,000 - 150,000
Per diem provided
Construction Superintendent, Fluid/Mechanical - Memphis
Construction Superintendent, Fluid/Mechanical - Memphis

ResumeXrays LLC • Mississippi

On-site
USD 95,000 - 150,000
Per diem
Construction Superintendent, Structural - Mobile Construction
Construction Superintendent, Structural - Mobile Construction

SpaceX Super Intelligence • Memphis (TN)

On-site
USD 90,000 - 150,000
Construction Superintendent, Structural - Memphis
Construction Superintendent, Structural - Memphis

ResumeXrays LLC • Mississippi

On-site
USD 90,000 - 150,000