Construction Scheduler

CALTEC Corp.

Long Beach (CA)

In loco

USD 45.000 - 75.000

Part-time

14 giorni+

Una candidatura completa in un minuto

Curriculum e lettera di presentazione personalizzati, pronti da inviare.

Supera i filtri ATS

Vantaggi offerti da questo lavoro

Health insurance
Dental insurance
401(k) retirement plan with company-m劣
Paid sick leave
Flexible scheduling arrangements
Professional development and exposure

Descrizione del lavoro

CALTECCorp. is seeking an experienced Primavera P6 Construction Scheduler to support a unique public infrastructure project in the Los Angeles area. The role will develop, maintain, and analyze CPM schedules, coordinating with project management and field teams on-site.

The position begins with 24 hours per week on-site, with potential for additional hours as the project evolves. The scheduler will collaborate with management and field staff to ensure timely delivery.

Competenze

  • Minimum 5 years of hands-on Primavera P6 construction scheduling experience.
  • Ability to independently develop, update, and analyze CPM schedules.
  • Experience with cost-loaded and resource-loaded schedules.
  • Experience with schedule frag nets, Time Impact Analyses, and delay evaluations.
  • Strong understanding of critical path analysis, sequencing, float, and scheduling logic.
  • Experience producing weekly updates, look-aheads, and narratives.
  • Ability to interpret construction plans, specs, and contract requirements.
  • Strong communication skills to coordinate with field and management teams.
  • Ability to work on-site for the agreed weekly schedule.

Mansioni

  • Develop, maintain, and update CPM schedules using Oracle Primavera P6.
  • Prepare baselines schedules, revised schedules, and recovery schedules.
  • Develop and maintain cost-loaded and resource-loaded schedules.
  • Prepare schedule fragments, Time Impact Analyses (TIA), and supporting documentation for changes, delays, and time extension requests.
  • Perform weekly schedule updates, incorporating actual field progress, remaining durations, and changes in construction sequencing.
  • Prepare 2-week, 3-week, and 6-week look-ahead schedules.
  • Monitor critical path activities, float, milestones and potential project delays.
  • Prepare schedule narratives, progress reports, and variance analyses.
  • Coordinate directly with project managers, superintendents, subcontractors, and owner representatives.
  • Review project drawings, specifications, and contractual scheduling requirements.
  • Attend scheduling and coordination meetings and assist with mitigation and recovery planning.
  • Maintain accurate scheduling records and support project management with schedule-related reporting and analysis.

Conoscenze

CPM scheduling
Schedule development
Lookahead schedules
Progress reporting

Strumenti

Primavera P6

Descrizione del lavoro

AbouttheOpportunity

CALTECCorp.isseekinganexperiencedPrimaveraP6ConstructionSchedulertosupportauniquepublicinfrastructureprojectintheLosAngelesarea.

Thisprojectinvolvesworkingwithoneoftheregion'smostimportantpublicagencies,supportinginfrastructurethatplaysavitalroleinSouthernCalifornia'seconomyandoperations.

Wearelookingforaskilledschedulingprofessionalwhocanindependentlydevelop,maintain,andanalyzedetailedconstructionscheduleswhileworkingcloselywithourprojectmanagementandfieldteams.

Thispositionwillinitiallyrequire24hoursperweek,performedon-site.Theremaybeopportunitiestoincreaseweeklyhoursasprojectrequirementsevolve.Thescheduleoffersflexibilityincoordinatingworkdayswhilemeetingprojectobligations.

KeyResponsibilities
  • Develop,maintain,andupdatedetailedCriticalPathMethod(CPM)schedulesusingOraclePrimaveraP6.
  • Preparebaselineschedules,revisedschedules,andrecoveryschedules.
  • Developandmaintaincost-loadedandresource-loadedschedules,includingmanpowerforecastsandcashflowprojections.
  • Prepareschedulefragnets,TimeImpactAnalyses(TIA),andsupportingdocumentationforchanges,delays,andtimeextensionrequests.
  • Performweeklyscheduleupdates,incorporatingactualfieldprogress,remainingdurations,andchangesinconstructionsequencing.
  • Prepare2-week,3-week,and6-weeklook-aheadschedules.
  • Monitorcriticalpathactivities,float,milestones,andpotentialprojectdelays.
  • Prepareschedulenarratives,progressreports,andvarianceanalyses.
  • Coordinatedirectlywithprojectmanagers,superintendents,subcontractors,andownerrepresentatives.
  • Reviewprojectdrawings,specifications,andcontractualschedulingrequirements.
  • Attendschedulingandcoordinationmeetingsandassistwithmitigationandrecoveryplanning.
  • Maintainaccurateschedulingrecordsandsupportprojectmanagementwithschedule-relatedreportingandanalysis.
RequiredQualifications
  • Minimum5yearsofhands-onPrimaveraP6constructionschedulingexperience.
  • Provenabilitytoindependentlydevelop,update,andanalyzeCPMschedules.
  • Experiencepreparingcost-loadedandresource-loadedschedules.
  • Demonstratedexperiencewithschedulefragnets,TimeImpactAnalyses,anddelayevaluations.
  • Strongunderstandingofcriticalpathanalysis,constructionsequencing,float,andschedulinglogic.
  • Experiencepreparingweeklyupdates,look-aheadschedules,andschedulenarratives.
  • Abilitytointerpretconstructionplans,specifications,andcontractrequirements.
  • Strongcommunicationskillsandabilitytocoordinatewithfieldandmanagementteams.
  • Abilitytoworkon-sitefortheagreedweeklyschedule.

Preferred:ExperiencewithCaliforniapublicworks,infrastructure,transportation,aviation,orothercomplexpublicconstructionprojects.

WhyJoinCALTECCorp.?
  • FlexiblePart-TimeSchedule:Beginwith24hoursperweek,providinganopportunitytomaintainabalancedschedulewhilecontributingtoasignificantproject.
  • PotentialforAdditionalHours:Opportunitiesforincreasedinvolvementasprojectrequirementsevolve.
  • UniqueProjectExperience:ParticipateinacomplexpublicinfrastructureprojectsupportinganessentialLosAngeles-areapublicagency.
  • DirectProjectInvolvement:Workcloselywithexperiencedconstructionexecutives,projectmanagers,andfieldpersonnel.
  • ProfessionalIndependence:Takeownershipofschedulingresponsibilitiesandcontributedirectlytoprojectplanningandexecution.
  • MeaningfulImpact:Yourschedulingexpertisewillplayanimportantroleinmonitoringprogress,identifyingrisks,andsupportingsuccessfulprojectdelivery.
Benefits

CALTECCorp.offersemployeebenefitsthatmayinclude:

  • Healthinsurance
  • Dentalinsurance
  • 401(k)retirementplanwithcompanymatching
  • Paidsickleave
  • Flexibleschedulingarrangements
  • Professionaldevelopmentandexposuretocomplexconstructionprojects

Insuranceandretirementbenefitsaresubjecttoapplicableplaneligibilityrequirements,includingthoserelatingtopart-timeemployment.Flexibleschedulingiscoordinatedaroundprojectneedsandrequiredon-sitework.

CALTECCorp.isanEqualOpportunityEmployer.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Project Scheduler - Los Angeles, CA
Project Scheduler - Los Angeles, CA

Proactive Global • Los Angeles (CA)

In loco
USD 96.000 - 165.000
Equal opportunity employer
Project Scheduler
Project Scheduler

Overall Consulting • Sacramento (CA)

Remoto
USD 68.880 - 123.984
Flexible part-time schedule
Fully remote within California
Opportunity to transition to full-time
Project Scheduler - Construction
Project Scheduler - Construction

CLMI Group • Los Angeles (CA)

In loco
USD 160.000 - 165.000
Salary Range: $160,000 - $165,000
Health Care Plan (Medical, Dental &amp
Retirement Plan (401k)
+3
Construction Scheduler / Project Scheduler
Construction Scheduler / Project Scheduler

PMCS Group • Los Angeles (CA)

In loco
USD 171.000 - 191.000
PTO 120 hours annually
8 paid holidays
Medical, Dental, Vision insurance 100%
+3
Project Scheduler
Project Scheduler

CLMI Group LLC • Los Angeles (CA)

In loco
USD 150.000 - 166.000
401(k)
401(k) matching
Dental insurance
+3
Project Scheduler in Los Angeles
Project Scheduler in Los Angeles

Energy Jobline ZR • Los Angeles (CA)

In loco
USD 135.000 - 150.000
Medical Insurance
Dental Insurance
Vision Insurance
+7
Scheduler - Construction Projects
Scheduler - Construction Projects

Advantage Technical • Boise (ID)

In loco
USD 85.000 - 110.000
Per diem
Health benefits
Paid holidays
+1
Scheduler IV
Scheduler IV

ENGICON CM • Los Angeles (CA)

In loco
USD 120.000 - 170.000
401(k) matching
Dental insurance
Health insurance
+4
Senior Construction Scheduler
Senior Construction Scheduler

CLMI Group, LLC • Los Angeles (CA)

In loco
USD 75.000 - 100.000
Health Care Plan (Medical, Dental & Vision)
Retirement Plan (401k)
401k Matching
+2
Senior Construction Scheduler in Los Angeles
Senior Construction Scheduler in Los Angeles

Energy Jobline ZR • Los Angeles (CA)

In loco
USD 110.000 - 170.000
Health Care Plan (Medical, Dental &amp
Vision
401k Plan