Chicano Studies Instructor (Part-Time) – Impactful Teaching

Palomar College

San Marcos (CA)

On-site

USD 104,435 - 164,209

Part time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

A California community college is seeking qualified part-time instructors to teach Chicano Studies. Candidates must have a Master's degree in Chicano Studies or Ethnic Studies and demonstrate cultural competency. The position involves teaching both on-campus and off-campus courses. Flexible scheduling options are available, including evening and weekend hours.

Qualifications

  • Master’s degree in Chicano Studies or Ethnic Studies required.
  • Must have cultural competency and sensitivity to diverse backgrounds.

Responsibilities

  • Teach curriculum approved courses within the discipline of Chicano Studies.
  • Supervision from the Division Dean and Department Chair.

Skills

Cultural competency
Teaching Chicano Studies

Education

Master’s degree in Chicano Studies
Master’s degree in Ethnic Studies

Job description

Please see Special Instructions for more details.
  • For more information regarding the position, contact Dr. Rodolfo Jacobo, Department Chair at 760-744-1150, ext. 2207 or via email at rjacobo@palomar.edu .
  • This posting is for an application pool, and when a need comes up, the department will contact those that they are interested in.
  • Supplemental materials (optional): List of courses taught in the discipline.
Position Information

Position Title

Department

Department Ethnic Studies

Primary Location

Primary Location N/A

A part-time faculty member’s assignment may include day, evening and/or weekend work, and work at more than one location (San Marcos campus and/or off-campus locations, as well as distance education classes).

Projected Start Date

Full or Part Time

Full or Part Time Part-time

Category

Hours per week Part-time faculty members are not to exceed a load of 67%.

Work Schedule

A part-time faculty member’s assignment may include day, evening and/or weekend work, and work at more than one location (San Marcos campus and/or off-campus locations, as well as distance education classes).

Initial Placement Hourly Range: $75.81 – $119.20 (instructional); $74.60 – $117.69 (non-instructional)


Part-time faculty employees are eligible to elect membership in one of the following retirement plans:

  • APPLE (Accumulation Program for Part-Time Limited-Service Employees)
Job Duties

The Ethnic Studies department is seeking qualified part-time instructors to teach Chicano Studies. Teaching assignment(s) may include any of the curriculum approved courses within the discipline of Chicano Studies.


Teaching assignments at Palomar College may include instruction in any of our special programs, such as dual enrollment, middle college, transitions (formerly incarcerated), and/or currently incarcerated students.

Minimum Qualifications

Must meet one of the sets of qualifications listed under 1) through 3):

  • A Master’s degree in Chicano Studies.
  • A Master’s degree in Ethnic Studies.
  • A combination of education and experience that is at least the equivalent of the qualifications in either 1) or 2) above. You must complete and attach the Application for Equivalency form (www.palomar.edu/hr/equivalency-app/ ), if you do not possess the specific minimum qualifications as stated above, which includes degrees that have not been awarded at the time of submitting the application.

Only coursework completed at, and degrees awarded by, accredited institutions recognized by the U.S. Department of Education will be considered as satisfying the minimum qualifications. Coursework and degrees that are completed outside of the United States are required to have transcripts evaluated (evaluation to U.S. equivalency and a course by course analysis) by an appropriate U.S. credentials evaluation service. For a list of credentials evaluation agencies accepted by Palomar College, visit the National Association of Credentials Evaluation Services ( NACES ) website at https://www.naces.org/members , or the Association of International Credential Evaluators, Inc. ( AICE ) website at http://aice-eval.org/ .

Diversity, Equity, Inclusion, Accessibility and Antiracism (DEIAA) Statement


Palomar College is committed to diversity, equity, inclusion, accessibility and antiracism ( DEIAA ). We are dedicated to empowering students to succeed and are guided by our core values; some of which are the following:

  • Access – We make education possible for everyone.
  • Diversity, Equity, and Inclusion – We recognize and respect diversity, seek to foster a culture of inclusion and belonging, and strive to address inequities.

All positions require cultural competency which includes the sensitivity to and understanding of the diverse academic, socioeconomic, cultural, disability, sex, gender identity, sexual orientation, and ethnic backgrounds of community college students, faculty, and staff.

Licenses and/or Certificates

N/A

Supervision Received

Part-time faculty members receive supervision from the Division Dean and direction from the Department Chair.

Part-time faculty members are not to exceed a load of 67%.


The person selected for hire will be required to complete the following pre-employment requirements: live scan/fingerprinting, official transcript(s), TB risk assessment, and employment verification(s). Other pre-employment requirements may be required depending on the position (i.e. certifications or licenses; see applicable job posting section for details). Successful completion of all pre-employment requirements is mandatory to be eligible for employment. These requirements are in accordance with the following Administrative Procedures and Board Policies: AP 7120 , AP 7120a , AP 7125 , AP 7126 , AP 7127 , AP 7330 , BP 7330 , AP 7336 , AP 7337 , and BP 7335 .

  • For more information regarding the position, contact Dr. Rodolfo Jacobo, Department Chair at 760-744-1150, ext. 2207 or via email at rjacobo@palomar.edu .
  • This posting is for an application pool, and when a need comes up, the department will contact those that they are interested in.
  • Supplemental materials (optional): List of courses taught in the discipline.
Supplemental Questions

Required fields are indicated with an asterisk (*).

  • * Are you interested in and willing to teach a dual enrollment course for the discipline in which you are applying to at a high school within our District?Dual enrollment programs allow high school students to enroll in courses that count toward both college and high school credit.
    • Yes
    • No
  • * How did you hear about this employment opportunity?
    • ACCCA.org
    • CalJOBS
    • CCC Registry
    • ChronicleVitae.com (Chronicle of Higher Education)
    • Colleague/Friend/Relative
    • CraigsList
    • DSPSjobs.com
    • EdJoin
    • Handshake
    • HigherEdJobs.com
    • Human Resources at Palomar College
    • Indeed.com
    • indian-affairs.org
    • Job Fair
    • MilitaryJob.com
    • Other Source
    • Palomar College website
    • San Diego LGBT Job Board (http://www.gsdba.org/pages/Jobs)
    • SDBCjobs.com
    • Vista Chamber
  • If other source, please specify.

    (Open Ended Question)

  • Required Documents

  • Transcript 1
  • Optional Documents
  • Application for Equivalency
  • Cover Letter
  • Resume/CV
  • Supplemental Materials 1 (see the "Additional Application Information" section)
  • Supplemental Materials 2
  • Supplemental Materials 3
  • Transcript 2
  • Transcript 3
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Part-time Faculty, Chicano Studies
Part-time Faculty, Chicano Studies

Palomar College • San Marcos (CA)

On-site
USD 104,435 - 164,209
Part-time Faculty, Anthropology
Part-time Faculty, Anthropology

Palomar College • San Marcos (CA)

On-site
USD 104,435 - 164,209
Flexible work hours
Membership in retirement plans
Part-time Faculty, History
Part-time Faculty, History

Palomar College • San Marcos (CA)

On-site
USD 104,435 - 164,209
Part-time eligibility for retirement plans
Part-time Faculty, Instructional Design/Technology
Part-time Faculty, Instructional Design/Technology

Palomar College • San Marcos (CA)

On-site
USD 104,000 - 164,000
APPLE retirement plan
Early College Credit Counselor/Part-time Faculty
Early College Credit Counselor/Part-time Faculty

Palomar College • San Marcos (CA)

On-site
USD 103,000 - 164,000
APPLE (Accumulation Program for Part‑T
Part‑Time retirement plan eligibility
Part-time Faculty, Asian American Studies
Part-time Faculty, Asian American Studies

Palomar College • San Marcos (CA)

On-site
USD 104,435 - 164,209
Flexible schedule
Eligibility for retirement plans
Part-time Faculty, Police Academy (Administration of Justice)
Part-time Faculty, Police Academy (Administration of Justice)

Palomar College • San Marcos (CA)

On-site
USD 104,435 - 164,209
Part-time Faculty, Administration of Justice
Part-time Faculty, Administration of Justice

Palomar College • San Marcos (CA)

On-site
USD 103,320 - 163,934
APPLE (Accumulation Program for Part‑T
Part-time Faculty, Art (Studio)
Part-time Faculty, Art (Studio)

Palomar College • San Marcos (CA)

On-site
USD 104,435 - 164,209
Retirement plans available
Professional development opportunities
Part-time Faculty, AC, Refrigeration & Heating
Part-time Faculty, AC, Refrigeration & Heating

Palomar College • San Marcos (CA)

On-site
USD 103,000 - 165,000