AI Datacenter Construction Cost Lead

Bitdeer (NASDAQ: BTDR)

Pittsburgh (Allegheny County)

Presencial

USD 180.000 - 260.000

Jornada completa

hace 42 horas
Sé de los primeros/as/es en solicitar esta vacante

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Training and mentoring

Descripción de la vacante

Bitdeer seeks an AI Datacenter Construction Cost Lead to own cost management, budgeting, bids, and contracts across Bitdeer’s AI data center builds. You will secure long-lead equipment and manage change orders, reporting to the VP, Data Center Construction.

Ideal candidates bring hands-on data center cost engineering and procurement experience, strong contract knowledge, and the ability to coordinate with site managers, finance, and supply chain on multiple US sites, including Pittsburgh and

Formación

  • 8+ years in construction cost management, quantity surveying, or procurement, with data center or mission-critical exposure.
  • Strong knowledge of construction contracts (AIA, ConsensusDocs) and GMP, lump-sum, and cost-plus models.
  • Experience procuring MEP trades and long-lead electrical/mechanical equipment.
  • Proficiency with estimating and cost-control tools and advanced Excel.
  • Bachelor’s degree in a related field; professional certifications add value.
  • Owner-side cost or procurement experience with hyperscalers, colocation, or AI infra.

Responsabilidades

  • Cost Planning & Control: develop conceptual/detailed estimates, budgets, and control forecasts; own EAC and cash-flow.
  • Procurement & Contracting: lead RFPs, bid leveling, and vendor selections; administer contracts and purchase orders.
  • Long-Lead Equipment: secure transformers, switchgear, gensets, UPS, chillers; manage OFCI scope and milestones.
  • Commercial Management: review pay apps, liens, and retention; support claims resolution.
  • Value Engineering: lead cost benchmarking to lower $/MW without sacrificing quality or schedule.
  • Supplier & Market Strategy: build contractor/equipment supplier base across US markets; monitor pricing and lead times.

Conocimientos

Cost management
Procurement
Contract knowledge
Excel expertise
Negotiation
Analytical rigor
Integrity

Educación

Bachelor’s degree in Quantity Surveying
Construction Management or Engineering

Herramientas

Cost estimating tools

Descripción del empleo

About Bitdeer

Bitdeer is a world-leading technology company for Bitcoin mining and AI cloud. Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Apart from designing industry-leading ASIC chips and manufacturing mining rigs, the Group handles complex processes involved in computing across the value chain. This includes equipment procurement, transport logistics, datacenter design and construction, equipment management, and network and facility operations. Bitdeer also offers advanced cloud capabilities to customers with a high demand for artificial intelligence. Headquartered in Singapore, Bitdeer operates globally with a diversified 3 GW energy portfolio, and deploys Bitcoin mining and HPC datacenters in the United States, Bhutan, Norway, Canada, Malaysia, and Ethiopia.

To learn more, visithttps://ir.bitdeer.com/

We are seeking

We are seeking an AI Datacenter Construction Cost Lead to own cost management and construction procurement across Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will set budgets, run competitive bids, manage contracts and change orders, and secure long-lead equipment so each project is delivered on budget and on time. You will be the commercial backbone of the construction team, working with site construction managers, the TPM, design, finance, and supply chain. The ideal candidate brings hands-on data center cost engineering and procurement experience and a strong command of construction contracts. Candidates will work on site as needed and should be based in one of the following areas, primarily in Texas and Ohio: Austin, TX; Rockdale, TX; Abilene, TX; Houston, TX; Dallas, TX; Massillon, OH; Clarington, OH; Columbus, OH; Akron, OH; or Pittsburgh, PA.

What You Will Be Responsible For
Cost Planning & Control
  • Budgets & Estimates: Develop conceptual and detailed estimates, cost plans, and control budgets for each build.
  • Cost Reporting: Track committed, incurred, and forecast costs, and own Estimate at Completion (EAC) and cash-flow forecasts.
  • Change Control: Review, negotiate, and track change orders, contingency, and allowances with clear documentation.
Procurement & Contracting
  • Bid Management: Lead RFPs, bid leveling, and contractor and vendor selection for general contractor, trade, and equipment packages.
  • Contract Administration: Prepare and administer construction and supply contracts, GMPs, and purchase orders with legal and finance.
  • Long-Lead Equipment: Secure long-Lead equipment (e.g., transformers, switchgear, generators, UPS, chillers, CDUs) and manage OFCI scope, delivery, and payment milestones.
Commercial Management
  • Pay Applications: Review contractor pay applications, lien waivers, and retention for accuracy and compliance.
  • Claims & Disputes: Manage commercial claims and support their resolution.
  • Value Engineering: Lead value engineering and benchmarking to lower cost per MW without compromising quality or schedule.
Supplier & Market Strategy
  • Supplier Relationships: Build a qualified base of contractors, trade partners, and equipment suppliers across US markets.
  • Market Intelligence: Track pricing, lead times, and labor market conditions to inform budgets and procurement strategy.
  • Cost Benchmarks: Build a cost database and benchmarks from completed projects.
How You Will Stand Out
  • Experience: 8+ years in construction cost management, quantity surveying, or procurement, with significant data center or mission-critical experience.
  • Contracts: Strong knowledge of construction contract forms (e.g., AIA, ConsensusDocs) and GMP, lump-sum, and cost-plus models.
  • Equipment Procurement: Experience procuring MEP trade packages and long-Lead electrical and mechanical equipment.
  • Cost Tools: Proficiency with estimating and cost control tools and advanced Excel.
  • Education: Bachelor’s degree in Quantity Surveying, Construction Management, Engineering, or a related field, or equivalent experience.
  • Certifications: Professional certifications such as RICS, AACE (CCP or CEP), or CPSM.
  • Owner-Side Experience: Owner-side cost or procurement role at a hyperscaler, colocation provider, or AI infrastructure developer.
  • Commercial Judgment: Protects the company’s position while keeping contractor relationships productive.
  • Negotiation: Confident, well-prepared negotiator.
  • Analytical Rigor: Builds accurate, auditable cost data.
  • Integrity: Runs fair and transparent procurement processes.
What You Will Experience Working With Us
  • A culture that values authenticity and diverse perspectives.
  • An inclusive, respectful environment with open workspaces and an energetic, start-up spirit.
  • A fast-growing company with opportunities to network with industry pioneers and enthusiasts.
  • The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
  • Involvement in new projects and in developing processes/systems.
  • Personal accountability, autonomy, rapid growth, and learning opportunities.
  • Attractive benefits and development such as training and mentoring.

Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer (NASDAQ: BTDR) • Abilene (TX)

Presencial
USD 180.000 - 240.000
Training and mentoring
Equal opportunity employer
AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer (NASDAQ: BTDR) • Austin (TX)

Presencial
USD 180.000 - 230.000
Training & mentoring
Competitive benefits
AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer Technologies Group • Columbus (OH)

Presencial
USD 140.000 - 240.000
Training and mentoring
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer (NASDAQ: BTDR) • Clarington (OH)

Presencial
USD 120.000 - 180.000
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer (NASDAQ: BTDR) • Columbus (OH)

Presencial
USD 140.000 - 210.000
Training and mentoring
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer (NASDAQ: BTDR) • Austin (TX)

Presencial
USD 120.000 - 190.000
Training and mentoring
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer (NASDAQ: BTDR) • Abilene (TX)

Presencial
USD 150.000 - 230.000
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer (NASDAQ: BTDR) • Houston (TX)

Presencial
USD 140.000 - 210.000
Training and mentoring
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer (NASDAQ: BTDR) • Massillon (OH)

Presencial
USD 140.000 - 190.000
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer (NASDAQ: BTDR) • Cleveland (OH)

Presencial
USD 150.000 - 230.000