Aerospace Project Management Analyst (Data Analytics, SAP, Earned Value Management)

Radiometer

Town of Florida (NY)

On-site

USD 90,000 - 120,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Bonus/incentive pay
Competitive benefits package
401(k) plan

Job summary

Pall Aerospace is seeking an PMO Analyst to support project and program managers with financial management, tracking, and reporting. Located on-site in Florida, this role focuses on data analytics, governance improvements, and EVM across the Product Development portfolio.

Ideal candidates hold a engineering degree, strong data skills, and PMP/Prince2 certification, with travel expected about 10% globally.

Qualifications

  • Bachelor’s degree in Engineering, Aerospace, or related field.
  • Strong analytical and data manipulation skills (spreadsheets, databases).
  • Prince 2 or PMP project management certification, with Earned Value Management knowledge.
  • Proficiency with project management software and reporting tools.
  • Excellent organizational, communication, and time management skills.
  • Travel approximately 10% of the time, globally.

Responsibilities

  • Support Pall Aerospace business by enabling project development through data analytics, process improvements, and governance.
  • Own standard work for project tools, their use, analysis, and continuous improvement.
  • Support daily management rhythms and tactical execution of active projects.
  • Serve as focal point for the Product Development portfolio with responsibility for Earned Value Management.
  • Lead lower-risk projects to build PM capability and develop future PM skills.

Skills

Analytical skills
Data manipulation
Communication skills

Education

Bachelor’s degree in Engineering or Aerospace

Tools

Project management software
Reporting tools

Job description

Bring more to life. Are you ready to accelerate your potential and make a real difference within life sciences, diagnostics and biotechnology? At Pall Corporation, one of Danaher’s 15+ operating companies, our work saves lives—and we’re all united by a shared commitment to innovate for tangible impact. You’ll thrive in a culture of belonging where you and your unique viewpoint matter. And by harnessing Danaher’s system of continuous improvement, you help turn ideas into impact - innovating at the speed of life. As a global leader in high-tech filtration, separation, and purification, Pall Corporation thrives on helping our customers solve their toughest challenges. Our products serve diverse, global customer needs across a wide range of applications to advance health, safety and environmentally responsible technologies. From airplane engines to hydraulic systems, scotch to smartphones, OLED screens to paper—everyday Pall is there, helping protect critical operating assets, improve product quality, minimize emissions and waste, and safeguard health. For the exponentially curious, Pall is a place where you can thrive and amplify your impact on the world. Find what drives you on a team with a more than 75-year history of discovery, determination, and innovation. Learn about the Danaher Business System which makes everything possible.

Danaher is a leading global life sciences, biotechnology, and diagnostics innovator, helping to solve many of the world’s most important health challenges, ultimately improving quality of life for billions of people today, while setting the foundation for a healthier, more sustainable tomorrow. The Danaher ecosystem is made up of more than 15 businesses united by a shared commitment to innovate for tangible impact.

The Aerospace PMO Analyst is responsible for supporting all Project and Program managers with project financial management, project tracking and reporting as well as reviewing, at portfolio level, data analytics and insights as well as governance support and process improvements. This position reports to the Director of Strategic Programs and is part of the Aerospace Strategic Programs team located in New Port Richey, Florida and will be an on-site role. This position requires access to export-controlled commodities, technical data, technology, software, and services. U.S. citizenship, U.S. legal permanent resident status, protected person status, or U.S. Government export authorization is required. Any offer of employment is contingent upon Pall obtaining the necessary employment visa and export authorization, including, if required, an export license from the applicable U.S. government agency.

Key Responsibilities
  • Support the Pall Aerospace business unit by enabling product development project success through data analytics, process improvement, and execution of established governance.
  • Own the standard work for project critical tools, including their use, analysis, and continuous improvement.
  • Support daily management rhythms and the tactical execution of active projects.
  • Serve as the focal point for the Product Development portfolio with responsibility for Earned Value Management.
  • Lead lower-risk projects to build project management capability and develop skills in preparation for a future Project Manager role.
Qualifications & Requirements
  • Bachelor’s degree in Engineering, Aerospace, or a related field required.
  • Strong analytical and data manipulation skills (spreadsheets, databases).
  • Prince 2 or PMP project management certification, with particular knowledge with Earned Value Management.
  • Proficiency with project management software and reporting tools.
  • Excellent organizational, communication, and time management skills.
  • Travel, Motor Vehicle Record & Physical/Environment Requirements: Ability to travel – with approximately 10% travel, overnight globally.
Benefits & Compensation
  • Pall Corporation offers a broad array of comprehensive, competitive benefit programs that add value to our lives. Our programs contribute to life beyond the job, including health care programs and paid time off.
  • This job is also eligible for bonus/incentive pay.
  • We offer a comprehensive package of benefits including paid time off, medical/dental/vision insurance and 401(k) to eligible employees.
  • Note: No amount of pay is considered to be wages or compensation until such amount is earned, vested, and determinable. The amount and availability of any bonus, commission, benefits, or any other form of compensation and benefits that are allocable to a particular employee remains in the Company’s sole discretion unless and until paid and may be modified at the Company’s sole discretion, consistent with the law.
Equal Opportunity & Workplace Policies

Danaher Corporation and all Danaher Companies are committed to equal opportunity regardless of race, color, national origin, religion, sex, age, marital status, disability, veteran status, sexual orientation, gender identity, or other characteristics protected by law. The U.S. EEO posters are available here. We comply with federal and state disability laws and make reasonable accommodations for applicants and employees with disabilities. If reasonable accommodation is needed to participate in the job application or interview process, to perform essential job functions, and/or to receive other benefits and privileges of employment, please contact: 1-202-419-7762 or applyassistance@danaher.com.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

PMO Analyst (Aerospace, Data Analytics, SAP, Accolade)
PMO Analyst (Aerospace, Data Analytics, SAP, Accolade)

Pall Corporation • Town of Florida (NY)

On-site
USD 70,000 - 90,000
Paid time off
Medical/dental/vision insurance
401(k)
+1
Aerospace Project Management Analyst (Data Analytics, SAP, Earned Value Management)
Aerospace Project Management Analyst (Data Analytics, SAP, Earned Value Management)

Pall Corporation • Tampa (FL)

On-site
USD 60,000 - 80,000
Health/dental/vision insurance
Paid time off
401(k) plan
+1
Aerospace Project Management Analyst (Data Analytics, SAP, Earned Value Management)
Aerospace Project Management Analyst (Data Analytics, SAP, Earned Value Management)

Pall Corporation • Orlando (FL)

On-site
USD 70,000 - 90,000
Paid time off
Health/dental/vision insurance
401(k) plan
+1
Aerospace Regulatory Engineer
Aerospace Regulatory Engineer

Danaher Corporation • Florida

On-site
USD 90,000 - 140,000
Paid time off
Medical/dental/vision insurance
401(k)
Aerospace Regulatory Engineer
Aerospace Regulatory Engineer

Radiometer • Town of Florida (NY)

On-site
USD 120,000 - 180,000
Paid time off
Medical/dental/vision insurance
401(k)
Engineering Manager, Computer Aided Design Services and Configuration Control
Engineering Manager, Computer Aided Design Services and Configuration Control

Pall Corporation • Florida

On-site
USD 90,000 - 120,000
Aerospace Project Management Analyst (Data Analytics, SAP, Earned Value Management)
Aerospace Project Management Analyst (Data Analytics, SAP, Earned Value Management)

Pall - Aerospace • Town of Florida (NY)

On-site
USD 80,000 - 110,000
Engineering Manager, Computer Aided Design Services and Configuration Control
Engineering Manager, Computer Aided Design Services and Configuration Control

Pall - Aerospace • Florida

On-site
USD 100,000 - 140,000
Engineering Manager, Computer Aided Design Services and Configuration Control
Engineering Manager, Computer Aided Design Services and Configuration Control

Danaher • Florida

On-site
USD 105,000 - 145,000
Aerospace Regulatory Engineer
Aerospace Regulatory Engineer

Pall Corporation • Town of Florida (NY)

On-site
USD 110,000 - 150,000
Health insurance
401(k) plan
Paid time off