2nd Shift Custodian — Full-Time, Impactful Cleaning

Cushman & Wakefield

Dover (NH)

On-site

USD 19,000 - 22,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Health insurance
Vision insurance
Dental insurance
FSA
HSA
Retirement savings plans
Life insurance
Disability insurance programs
Paid time off
Unpaid time off

Job summary

Cushman & Wakefield is seeking a Cleaner for a full-time 2nd shift in Dover, NH. The Cleaner will carry out custodial duties under supervision, including floor care, dusting, window cleaning, and restocking supplies to maintain high standards of cleanliness.

The role emphasizes attention to detail, teamwork, and reliable, efficient service. Compensation ranges from $13.60 to $16.00 per hour, with comprehensive benefits available for eligible employees.

Qualifications

  • Basic cleaning responsibilities requires no previous experience.
  • Must be able to take direction, to work with minimal supervision, and to function cooperatively as part of a team.
  • Ability to use cleaning tools and equipment.
  • Use a portable vacuum cleaner – back pack style.
  • Requires attention to detail, a pride in delivering excellent service, organization, and high levels of energy and endurance.

Responsibilities

  • Sweep, mop, and wash floors, and other surfaces (inside buildings).
  • Vacuum rugs in offices and public areas.
  • Spot clean daily and shampoo when directed rugs.
  • Clean bathrooms and restock paper supplies daily.
  • Collect building trash daily placing it in approved container and place in designated collection area for subsequent removal.
  • Replace liners in waste baskets and trash containers per specs.
  • Monitors possible defects such as clogged urinals and lights out, and reports to supervisors.

Skills

Basic cleaning
Teamwork
Attention to detail
Use of cleaning equipment

Job description

Cushman & Wakefield is seeking a Cleaner for a full-time 2nd shift in Dover, NH. The Cleaner will carry out custodial duties under supervision, including floor care, dusting, window cleaning, and restocking supplies to maintain high standards of cleanliness.

The role emphasizes attention to detail, teamwork, and reliable, efficient service. Compensation ranges from $13.60 to $16.00 per hour, with comprehensive benefits available for eligible employees.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

2nd Shift Custodial Technician
2nd Shift Custodial Technician

cw • Stratham (NH)

On-site
USD 23,000 - 29,000
Health insurance
Vision insurance
Dental insurance
+7
Professional Cleaner - Full Time, Detail-Driven
Professional Cleaner - Full Time, Detail-Driven

Cushman & Wakefield • Dover (NH)

On-site
USD 18,735 - 22,041
Health insurance
Vision insurance
Dental insurance
+2
2nd Shift Custodial Specialist
2nd Shift Custodial Specialist

Cushman & Wakefield • Keene (NH)

On-site
USD 19,000 - 22,000
Health insurance
Vision insurance
Dental insurance
2nd Shift Cleaner – Detail‑Oriented, Reliable Team Player
2nd Shift Cleaner – Detail‑Oriented, Reliable Team Player

cw • Florida

On-site
USD 17,000 - 24,000
2nd-Shift Custodian: Reliable Cleaning Pro
2nd-Shift Custodian: Reliable Cleaning Pro

Cushman & Wakefield • Stratham (NH)

On-site
USD 25,000 - 29,000
Health insurance
Vision insurance
Dental insurance
+7
Full-Time Cleaner - 1st Shift, Detail-Oriented
Full-Time Cleaner - 1st Shift, Detail-Oriented

Cushman & Wakefield • Keene (NH)

On-site
USD 17,000 - 21,000
Health insurance
Vision insurance
Dental insurance
+6
Night Shift Cleaner - Detail-Oriented, Full-Time
Night Shift Cleaner - Detail-Oriented, Full-Time

cw • Keene (NH)

On-site
USD 19,000 - 23,000
Health insurance
Vision insurance
Dental insurance
+1
Evening Custodian: Detail-Driven Cleaning Pro
Evening Custodian: Detail-Driven Cleaning Pro

Cushman & Wakefield • Keene (NH)

On-site
USD 20,000 - 23,000
Health insurance
Vision insurance
Dental insurance
+2
2nd-Shift Custodian: Detail-Oriented Cleaning Pro
2nd-Shift Custodian: Detail-Oriented Cleaning Pro

cw • City of Rochester (NY)

On-site
USD 22,000 - 23,000
Health, vision, and dental insurance
Flexible spending accounts
Retirement savings plans
+1
Evening Custodian - 2nd Shift (Office Cleaning)
Evening Custodian - 2nd Shift (Office Cleaning)

Cushman & Wakefield • City of Rochester (NY)

On-site
USD 22,000 - 23,000
Health benefits
Dental & vision insurance
Flexible spending accounts
+2