An application made for this job — a tailored resume and cover letter that speak straight to the posting.
WSH EXPERTS PTE. LTD. is seeking an on-site Sewer/Site Inspector to locate manholes and sewer corridors, photographically document construction activity, and ensure compliance with sanitation regulations.
The role requires Nitec qualification, own vehicle, and construction-related experience, with responsibilities including liaising with project managers, reporting infringements, inspecting chambers, and compiling comprehensive inspection reports with date-stamped photos.
a) locate the manholes and public sewers within the land parcel(s) of the construction project to determine the location of the construction site/activity , and take coloured photographs at each manhole and along the sewer alignment to show the absence/presence of construction activities within sewer corridor. If there is construction activity near sewer corridor, the Team is to measure the distance from construction activity to the sewer alignment. The photographs shall capture the construction activities and equipment/machinery on-site.
b) Communicate with the Builders' Project Manager / Engineer / Owner / QP etc. onsite to obtain documents including but not limited to approval letters, documents, plans, drawings etc. pertaining to the on-going and future construction works near the sewers [Note: information related only if work is carried out within the sewer corridor].
c) Check for any infringements/non compliances or unauthorised activities as per WRN's requirements and Sanitary and Drainage Regulation/Acts requirements. Call and report to the WRN officer-in-charge immediately when unauthorised activities are being identified / spotted during the inspection.
d) Inspect the interior of the last inspection chambers and manholes inside / near the construction project site to check the sewer flow conditions and for signs of illegal discharge of debris / construction materials. All findings including sewers/manholes found to be ponding, defective, silted, dirty etc. are to be clearly documented and reported with coloured photographs.
e) Check for make-shift toilets, illegal sewer connections etc.
f) Submit a report for each site inspection with the following information:
The Team shall submit the reports for the inspections carried out within the week on