An application made for this job — a tailored resume and cover letter that speak straight to the posting.
Gemkom Engineering and Machinery Filial, a branch of Gemkom, is installing and inspecting piping welds and structural welds for a hydrogen-based steel mill project in Boden. You will support QA/QC processes, attend inspections, and manage welding documentation in collaboration with site management.
Required are welding certifications and 5+ years of pipe/pressure vessel welding experience, with knowledge of ASME, AWS, and ISO standards. Accommodation and food support are provided by GEMKOM.
Gemkom Engineering and Machinery Filial is a newly established branch of the Turkish company Gemkom. It is a leading engineering and manufacturing company that operates in a number of areas and in various ways within the steel industry.
We are participating in a project where Stegra AB establishes a steel mill in Norra Svartbyn in Boden where steel will be produced through an almost fossil-free process using hydrogen gas. Our mission is, among other things, to install machines used in steel production and includes work in mechanics, electronics, and plumbing.
Coordinating with staff and sub-contractors on site for project QA-QC progress and process mainly for overall piping weld log improvement at DRP and Gemkom Spool Fabrication Workshop. Conducting on Site VI Visual Inspections at DRP and Spool Fabrication workshop via NOIs when required. Carrying on QA/QC documentation and document controlliny support digital and hard copy QA/QC documentation. QA/QC Planning time & resources, scheduling the inspection activities, updating actual progress and quality documentation, analysing variance, interpreting KPIs, forecasting weekly & monthly inspection requirements etc. Monitoring/discussing QA based documentation submission performance status; QC Supervising all construction activities including providing technical inputs for inspection and documentation methodologies of construction & co-ordination with site management activities of additional LDD works via NCR management system. Attending open box inspections of complex equipment, ensuring that equipment/ materials received are in accordance with the quantity & quality with coordination of logistics when necessary. Responsible for coordination with the engineering, purchase and finance department for design & drawing specification, dispatch of materials at site's, raising invoice and payment. Interacting with client for securing quick approval of the designs provided & carrying out planning as per pert chart requirement. Schedule, coordinate, follow up the documentation VT-MT-PT-UT-RT activities in Piping Weld log and documentation systems. Supporting documentation for WPS, pWPS documents, contacting 3.Part Companies which are licenced /accredited for (GTAW-SMAW-GMAW-SAW-FCAW) welding PQR preparations Supporting documentation for Welding Map - Project Weld Report (Initial and Production) Weld maps/WPS log Preparation Supporting documentation for Post Welding Heat Treatment and Pre -Welding Heat Treatment Inspection and Guidance, coordinating PWHT activities, reporting follow up and weld log & digital system entries. Guadiance and Prepapartion, follow up,documentation of below Quality Control Documents UT Ultrasonic Testing MT Magnetic Particle Testing VT Visual Testing PT Penetrant Testing RT Radiographic Testing Inspection Test Plan (ITP) Preparation Opening NOIs at DRP and Spool Fabrication Workshop Inspect Welding Joint Preparations and Welding Quality by Sampling Review of Project Welding Report, giving trainings/tool boxes to Welders in order to minimize Weld Rejection Rate Control of Welding Consumables at DRP and Spool Fabrication Workshop Preparation of Pipe Line (Oil/Gas/Fluid) /Pressure Vessel Welding Control Reports and Inspection Test Plans Preparing pWPS (Pre Welding Process Specification), W