Lead Power Systems & Grid Compliance for BESS

Volvo Group

Göteborgs kommun

On-site

SEK 1,200,000 - 1,700,000

Full time

11 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Volvo Energy is seeking a Lead Power System and Grid Compliance engineer to drive the grid connection strategy for Battery Energy Storage Systems (BESS) projects. You will translate grid code and owner requirements into technical studies, testing activities, and formal approvals, coordinating with DSOs, TSOs, customers, suppliers, and internal teams.

Ideal candidates have strong power systems knowledge, hands-on PowerFactory experience, and proven ability to manage compliance documentation and

Qualifications

  • Degree in Electrical Engineering, Power Systems Engineering, or equivalent knowledge gained through professional experience.
  • Experience with Battery Energy Storage Systems (BESS).
  • Experience with power system studies, simulations, and grid connection activities using PowerFactory or similar tools.
  • Experience with grid code compliance and utility‑scale energy projects, such as BESS, solar, wind, or substations.
  • Understanding power system behavior, including protection systems, harmonics, and dynamic performance, with experience preparing technical studies, simulation reports, and compliance documentation.
  • Self‑motivated, structured, and solution‑oriented, with strong communication skills and the ability to collaborate effectively with customers, grid owners, suppliers, and internal teams.
  • Fluent in Swedish and English, both written and spoken.

Responsibilities

  • Lead the RfG and grid connection process for BESS projects, from requirement clarification through ION, EON, FON, compliance testing, and final approval.
  • Act as the primary technical interface towards DSOs, TSOs, and other grid stakeholders throughout the grid connection process.
  • Perform and coordinate PowerFactory, EMT, harmonic, protection, and other power system studies required to demonstrate compliance with grid code and connection requirements.
  • Prepare simulation reports, compliance documentation, and technical submissions required for grid owner approvals and operational notifications.
  • Coordinate compliance testing, witness testing, and verification activities with grid owners, suppliers, and project teams.
  • Support supplier selection, design reviews, and technical requirements to ensure BESS systems meet applicable grid code and connection requirements.
  • Lead aggregator sourcing, technical integration, and prequalification activities where required.

Skills

Power systems
Grid connection
PowerFactory experience
Technical communication
Team collaboration
Grid studies

Education

Electrical Engineering degree

Tools

PowerFactory
Grid modeling software

Job description

Volvo Energy is seeking a Lead Power System and Grid Compliance engineer to drive the grid connection strategy for Battery Energy Storage Systems (BESS) projects. You will translate grid code and owner requirements into technical studies, testing activities, and formal approvals, coordinating with DSOs, TSOs, customers, suppliers, and internal teams.

Ideal candidates have strong power systems knowledge, hands-on PowerFactory experience, and proven ability to manage compliance documentation and

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior BESS Electrical Design Architect
Senior BESS Electrical Design Architect

Volvo Group • Göteborgs kommun

On-site
SEK 900,000 - 1,300,000
Lead Power System & Grid Compliance
Lead Power System & Grid Compliance

Volvo Group • Göteborgs kommun

On-site
SEK 1,200,000 - 1,700,000
Senior BESS System Architect — Grid & Power Conversion (Hybrid)
Senior BESS System Architect — Grid & Power Conversion (Hybrid)

Integro Consulting • Göteborgs kommun

Hybrid
SEK 800,000 - 1,100,000
Hybrid work model
Opportunity to work with BESS
BESS System Design Engineer - Grid & Inverters (Hybrid)
BESS System Design Engineer - Grid & Inverters (Hybrid)

Integro Consulting AB • Göteborgs kommun

Hybrid
SEK 900,000 - 1,300,000
Hybrid work in Gothenburg
BESS Installations Project Lead
BESS Installations Project Lead

Volvo Group • Göteborgs kommun

On-site
SEK 900,000 - 1,300,000
System Design Engineer Specialist (Battery Energy Storage Systems)
System Design Engineer Specialist (Battery Energy Storage Systems)

Integro Consulting AB • Göteborgs kommun

Hybrid
SEK 900,000 - 1,300,000
Hybrid work in Gothenburg
Principle Engineer for Planning of New Power System Solutions
Principle Engineer for Planning of New Power System Solutions

Huawei Sweden R&D • Stockholms kommun

On-site
SEK 900,000 - 1,200,000
Lead BESS Electrical Design Engineer
Lead BESS Electrical Design Engineer

Volvo Group • Göteborgs kommun

On-site
SEK 900,000 - 1,300,000
BoP Solution Manager, Energy Storage Systems (ESS) (Sweden)
BoP Solution Manager, Energy Storage Systems (ESS) (Sweden)

BOS Power Group • Stockholms kommun

Hybrid
SEK 900,000 - 1,200,000
Hybrid work setup
BESS Strategy Lead: Tech & Procurement
BESS Strategy Lead: Tech & Procurement

Einride • Stockholms kommun

On-site
SEK 900,000 - 1,300,000