We are looking for a T&C Manager/Lead Electrical Engineer for one of our clients with the following details:
Location: Rabigh, Saudi Arabia
Start Date: ASAP
Contract Duration: 13-month contract (renewable based on project needs)
Work Schedule: 8 hours/day - 6 days/week
Single status assignment
Qualification and Experience Required:
- 8 to 10 years of experience in commissioning and start-up PV solar plants.
- Thorough understanding of all aspects of solar PV systems and associated SCADA controls.
- Experience working with AC & DC Electricity, PV Systems, Trackers, Inverters, and AC collection Systems.
- Excellent teamwork skills, foster a positive team environment through the collaborative decision making.
- Excellent Communication skills (verbal & written).
- Experience working collaboratively with people and initiatives affecting multiple organization.
- Ability to work in a fast-paced environment under tight deadlines and demanding customers.
- Dedication to electrical safety.
- Ability to work independently while maintaining accountability to site management.
- Ability to manage and provide development of testing technicians.
- Coordination of third party testing services for MV systems.
- Coordination of equipment vendor commissioning processes.
- Proficient with PV inverters and DC collection systems.
- Understanding of major electrical equipment such as switchgear, VAR systems, reclosers, MV transformers.
- Knowledgeable of single axis tracking systems.
- Ability to troubleshoot electrical systems within utility PV projects.
- Compile and review electrical testing results.
- Administer and train individuals to perform PV string testing.
- Possess an understanding of the operation of power system protection relays.
- Understanding of Ethernet networks with fiber optic distribution.
- Understanding of the principles of a SCADA system.
- Ability to plan, author, and execute a commissioning process.
- Ability to author switch sequencing.
- Ability to select appropriate PPE for electrical safety.
- Ability to read electrical drawings.
- Understanding of LOTO principles.
- Ability to estimate available power throughout commissioning process.
- Ability to process testing data and demonstrate failure or acceptance of power systems
- Proficient in Microsoft Office suite
- Candidates currently residing in KSA must have a transferable Iqama
Job Functions (Duties & Responsibilities)
- Preparation of project documentation including pre-commissioning and commissioning procedures.
- Preparation of the project commissioning and start-up plan including detailed activities and start-up logic.
- Work with engineers and vendors in the design phases to align handover and commissioning activities.
- Participate in workshops on design aspects that may assist in pre-commissioning, commissioning and start-up activities.
- Assist with the development and management of commissioning and start-up budget, including forecast for future staffing requirements.
- Responsible for managing site materials and logistics.
- Coordinate between all parties involved with commissioning through daily and weekly meetings, i.e., daily POD meetings & weekly Commissioning meetings (Construction, TFAs, 3rd Party Testers, Owner.)
- Coordinate with the Performance Engineering team on Performance Testing and Substantial Completion timing.
- Develop and administer the site energization plan(s).
- Leads and insists on strict adherence to Lock Out/Tag Out Procedures (LOTO) and policies.
- Coordinate with the Grid operator Operations Center energization of circuits, as well as startup, shutdown, and curtailment
- Coordinate and manage contractor and subcontractor activities associated with pre-commissioning and commissioning.
- Interface with Operations Team in commissioning, start-up and final turnover of the facility.
- Work closely with the project planners and schedulers.
- Assist in Operational Readiness Plan and Project Execution Plan development.
- Coordinate vendor activities for commissioning.
- Provide leadership in health, safety and environmental (HSE) issues on site and maintain overall responsibility for ensuring that the team complies with the HSE Plan.
- Ensure hazard/risk analysis is performed before start of activities.
- Coordinate start-up activities with project management, engineering, construction, HSE, contractors, facility operations, and start-up personnel.
- Establish progress reporting systems for all phases of the commissioning and start-up of the facility.
- Ensure the commissioning plan is in compliance with the appropriate external regulatory bodies and OTS systems.
- Liaise with construction management, the client and Vendors to ensure efficient and timely service.
- Develop Project Site-Specific Commissioning Manual
- Setup and manage Startup budgets and forecasting. Labor, subcontracts, STS
- Coordinate between all parties involved with commissioning through daily and weekly meetings, i.e., daily POD meetings & weekly Commissioning meetings (Construction, TFAs, 3rd Party Testers, Owner.)
- Leads and insists on strict adherence to Lock Out/Tag Out Procedures (LOTO) and policies.
- Ensure that an organized documentation filing structure for all commissioning reports and documents is in place before starting testing and being maintained daily.
- Coordinate with the customer Maintenance organization for PMs and CMs as needed.
- Prepare action plans to address gaps in the commissioning schedule/plan.
- Track, review, and approve of all Startup Lessons Learned, Condition Reports, and Best Practices.
If Interested Kindly apply.