From 14th and 15th May
Physically replace & install network devices, including:
Swapping Connections: Migrate endpoint connections from old to new switches.
Testing: Conduct power-on and connectivity tests for all installed devices.
User Acceptance Testing (UAT): Work with on-site contacts to verify device functionality.
Document Installation & Spare Materials: Submit a list of installed devices and leftover materials.
Take Before & After Photos of racks, patch panels, and cabling.