QA/QC Manager / QA/QC Lead – Job Description and Responsibilities in Shoring Works Project
The QA/QC Manager or QA/QC Lead in a Shoring Works Project is responsible for establishing, implementing, monitoring, and maintaining the project's Quality Management System (QMS) to ensure that all shoring, piling, excavation support, ground anchor, and temporary works activities comply with approved drawings, project specifications, contract requirements, applicable codes, and client/consultant standards.
The primary objective is to ensure that all construction activities are executed in accordance with approved quality procedures and that completed works meet the required technical and contractual standards.
1. Quality Management System (QMS)
- Develop, implement, and maintain the Project Quality Plan (PQP).
- Establish quality control procedures and inspection requirements for shoring activities.
- Ensure compliance with ISO 9001 requirements and project-specific quality standards.
- Review and approve method statements, Inspection and Test Plans (ITPs), and checklists.
- Establish quality objectives and performance indicators.
- Conduct internal quality audits and monitor implementation of corrective actions.
- Ensure all project personnel understand applicable quality requirements.
- Coordinate with the client, consultant, main contractor, and subcontractors on quality matters.
2. Review of Technical Documents
- Review shoring shop drawings, construction drawings, and technical specifications.
- Review method statements for:
- Bored piling and shoring pile installation.
- Contiguous and secant pile walls.
- Soldier pile and sheet pile installation.
- Diaphragm wall construction.
- Ground anchor installation and stressing.
- Steel strutting and bracing installation.
- Excavation and dewatering activities.
- Review material submittals and technical data sheets.
- Review concrete mix designs and reinforcement specifications.
- Review temporary works inspection requirements.
- Ensure all documents are approved before commencement of relevant activities.
- Verify that the latest approved revisions are available at the construction site.
3. Inspection and Testing Activities
The QA/QC Manager must ensure that inspection and testing activities are carried out according to approved ITPs.
A. Bored Piling and Shoring Piles
- Verify setting-out and pile locations.
- Inspect borehole diameter and depth.
- Check verticality and pile alignment.
- Verify reinforcement cage dimensions, spacing, cover, and installation.
- Inspect temporary casing and drilling operations where applicable.
- Verify borehole cleaning before concreting.
- Monitor concrete delivery, slump, temperature, and sampling.
- Verify tremie pipe installation and concrete placement.
- Review concrete cube test results.
- Review pile integrity test and other specified testing reports.
B. Ground Anchors and Tiebacks
- Inspect anchor drilling locations, inclination, and depth.
- Verify tendon specifications and installation.
- Check grout mix design and grouting procedures.
- Review grouting records.
- Witness anchor stressing and load testing.
- Verify proof tests, suitability tests, and acceptance criteria.
- Ensure approved stressing records are maintained.
C. Steel Strutting and Bracing
- Inspect steel material certificates.
- Verify steel member sizes and specifications.
- Inspect fabrication and welding activities.
- Verify installation alignment and connection details.
- Check bolt tightening and welding inspection reports.
- Ensure struts, walers, and bracing are installed according to approved drawings.
- Verify installation and removal sequences against approved temporary works procedures.
D. Sheet Piling
- Inspect sheet pile material certificates.
- Verify pile dimensions, profile, and condition.
- Check setting-out and installation alignment.
- Monitor verticality and installation depth.
- Inspect interlocking connections.
- Review installation records and related inspection reports.
4. Inspection and Test Plan (ITP) Management
Prepare, review, and implement project-specific ITPs.
- Define Hold Points, Witness Points, Review Points, and Surveillance Points.
- Coordinate inspection activities with the consultant and client.
- Ensure inspections are conducted at the correct construction stages.
- Verify that all inspection requests are submitted with supporting documents.
- Maintain inspection status and track pending approvals.
- Ensure no work proceeds beyond designated Hold Points without the required release.
5. Non-Conformance Management (NCR)
Identify and record non-conforming construction activities and materials.
- Issue NCRs for deviations from approved drawings and specifications.
- Investigate the root cause of quality problems.
- Coordinate corrective and preventive actions with construction and engineering teams.
- Review and approve proposed corrective action plans within assigned authority.
- Verify implementation and effectiveness of corrective actions.
- Close NCRs after satisfactory verification.
- Monitor recurring quality issues and recommend preventive measures.
Examples of common NCRs in shoring projects:
- Pile installation outside approved tolerance.
- Incorrect pile depth or diameter.
- Improper reinforcement cage installation.
- Concrete quality failing specified acceptance criteria.
- Ground anchor installation not complying with approved design.
- Missing or incomplete pile integrity testing.
- Incorrect steel strut installation.
- Work carried out without approved inspection or method statement.
6. Material Quality Control
Review and approve material inspection procedures.
- Verify material approvals before procurement and installation.
- Ensure materials are received with valid certificates.
- Inspect reinforcement steel, structural steel, cement, concrete, grout, and anchor materials.
- Verify material traceability and identification.
- Ensure materials are stored and handled properly.
- Review mill test certificates (MTCs), material test reports, and compliance certificates.
- Reject or quarantine materials that do not meet project requirements.
7. Quality Audits and Compliance
Prepare and implement internal quality audit schedules.
- Conduct site quality inspections and process audits.
- Monitor subcontractor quality performance.
- Ensure compliance with project specifications, approved procedures, and applicable standards.
- Coordinate external audits by clients and certification bodies.
- Prepare audit reports and follow up on audit findings.
- Monitor quality performance indicators and identify areas for improvement.
8. Geotechnical Instrumentation and Monitoring Quality
This is a particularly important responsibility in deep excavation and shoring projects.
- Ensure the instrumentation and monitoring plan is implemented according to approved requirements.
- Verify installation and calibration records of monitoring instruments.
- Review instrumentation inspection and monitoring procedures.
- Ensure proper installation and identification of:
- Inclinometers.
- Settlement markers.
- Piezometers.
- Groundwater monitoring points.
- Building settlement monitoring points.
- Strut load cells.
- Verify monitoring reports are reviewed and issued within the specified frequency.
- Check monitoring records against approved trigger and action levels.
- Ensure abnormal readings are immediately communicated to the responsible engineering and HSE teams.
- Verify closure of monitoring-related quality observations.
Note: The QA/QC function verifies the quality, traceability, and compliance of monitoring activities and records. Engineering assessment of ground movement and decisions on excavation stability must remain with the responsible geotechnical/design engineer.
9. Documentation and Quality Records
The QA/QC Manager must ensure proper preparation, review, approval, and maintenance of project quality documentation.
Important documents include:
- Project Quality Plan (PQP).
- Inspection and Test Plans (ITPs).
- Method Statements (MS).
- Risk Assessments (RA).
- Material Submittals.
- Shop Drawing Approvals.
- Inspection Requests (WIR/IR).
- Material Inspection Requests (MIR).
- Concrete Test Reports.
- Pile Installation Records.
- Pile Integrity Test Reports.
- Anchor Installation and Load Test Reports.
- Welding Inspection Reports.
- NCR and corrective action reports.
- Calibration Certificates.
- Internal and External Audit Reports.
- Quality Monthly Reports.
- As-built Drawings.
- Final Quality Dossiers.
10. Team Management and Coordination
- Manage and supervise QA/QC Engineers, Inspectors, and Document Controllers.
- Assign inspection responsibilities according to project activities.
- Monitor the performance of QA/QC personnel.
- Provide technical guidance and quality training.
- Coordinate with Project Managers, Construction Managers, Project Engineers, and Site Engineers.
- Attend technical and quality coordination meetings.
- Coordinate inspections with consultants and clients.
- Ensure quality issues are resolved without unnecessary delays to construction progress.