Support accurate mechanical, electrical, plumbing, and fire-protection (MEPF) planning, quantity takeoffs, pricing, and technical coordination for bids and live construction projects.
KEY RESPONSIBILITIES
- Review MEPF drawings, specifications, scope of work, and site constraints; raise discrepancies and missing information early.
- Perform quantity takeoffs for materials, labor, and equipment using drawings, spreadsheets, and takeoff software.
- Prepare detailed estimates and comparative costing for MEPF scopes, including subcontractor quotations where applicable.
- Coordinate technical clarifications, proposed alternatives, and value-engineering options with management and other disciplines.
- Participate in initial ocular inspections or site visits to document dimensions, existing systems, access, and implementation constraints.
- Coordinate with architectural and structural teams to identify clashes and constructability concerns.
- Prepare material schedules, scope inclusions/exclusions, and bid backup documentation.
- Support procurement with technical specifications, material approvals, and review of supplier or subcontractor offers.
- Provide technical recommendations and assist site engineers with RFIs or field issues as assigned.
- Target a typical estimate turnaround of three to five working days, adjusted for project size and completeness of plans.
QUALIFICATIONS
- Graduate of Mechanical Engineering, Electrical Engineering, or a related engineering field. Licensure is preferred.
- At least two years of relevant estimation, design coordination, or construction experience in MEPF.
- Proficiency in Bluebeam, PlanSwift, or comparable quantity-takeoff software, plus Excel/Google Sheets.
- Ability to read and interpret technical plans, specifications, and bill-of-quantities.
- Knowledge of applicable Philippine building codes and relevant installation standards.
- Professional license is preferred; strong coordination and documentation skills are essential.
SUCCESS MEASURES
- Accurate, traceable takeoffs and cost estimates.
- Timely identification of plan gaps and technical risks.
- Estimates submitted within agreed deadlines, typically 3–5 working days for appropriately scoped packages.
ROLE ARRANGEMENT
Mainly office-based in Muntinlupa City with ocular/site visits as required.
Monday to Friday, 8 AM - 5 PM