Thesis Graduation Foundation Engineering - Vibratory Pile Installation

Heerema

Leiden

On-site

EUR 13,000 - 20,000

Full time

8 days ago

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Heerema Foundation Engineering in Leiden offers a graduation internship to develop and validate a nonlinear time-domain model for vibratory pile installation using field data from offshore projects.

The project runs from February to August 2027 and is well suited for an MSc student from Delft University of Technology or a comparable university with interest in soil-structure interaction and numerical modelling.

Qualifications

  • Pursuing an MSc in Offshore Engineering, Civil Engineering or a closely related discipline.
  • Interest in soil-structure interaction and offshore foundation engineering.
  • Experience with numerical models and engineering data; programming and numerical analysis is a plus.
  • Able to work independently while collaborating with engineers.

Responsibilities

  • Work with an existing nonlinear time-domain model for vibratory pile installation.
  • Compare model predictions with offshore field measurements.
  • Analyse pile penetration behavior and load transfer during vibratory installation.
  • Investigate influence of parameters such as hookload, tip resistance and shaft degradation.
  • Perform sensitivity analyses and parameter identifiability analyses.
  • Explore an amplitude-weighted friction-fatigue approach and its potential for predicting refusal.
  • Translate findings into recommendations for future modelling and offshore installation engineering.

Education

MSc in Offshore Engineering, Civil Engineering

Job description

Your role

The offshore wind industry is moving towards larger wind turbines, larger monopile diameters and installations in increasingly challenging water depths and soil conditions. These developments are pushing the limits of conventional pile installation methods and creating a growing need for alternative installation techniques.

Within Heerema’s Foundation Engineering team, you will work on the further development and validation of a nonlinear time-domain model for vibratory pile installation.

The model captures the interaction between the monopile, vibro-lifting tool and surrounding soil during installation. Your research will focus on assessing and improving its predictive capabilities using available field data from large-diameter monopile installations.

You will investigate how well the model reproduces actual penetration behaviour and load transfer, analyse which model parameters have the strongest influence on the results, and explore the limitations of predicting pile refusal.

What will you be working on?

During this graduation assignment, you will:

  • Work with an existing nonlinear time-domain model for vibratory pile installation;
  • Compare model predictions with available offshore field measurements;
  • Analyse pile penetration behaviour and load transfer during vibratory installation;
  • Investigate the influence of parameters such as hookload, tip resistance and shaft degradation;
  • Perform sensitivity and parameter-identifiability analyses;
  • Explore an amplitude-weighted friction-fatigue approach and its potential for predicting refusal;
  • Translate your findings into recommendations for future modelling and offshore installation engineering.

Your work will contribute to a better understanding of vibratory pile installation and its potential as an efficient installation method with a lower environmental impact.

Is this the internship for you?

We are looking for an enthusiastic MSc student with a strong interest in offshore engineering, foundation engineering and numerical modelling.

Ideally, you:

  • Are pursuing an MSc in Offshore Engineering, Civil Engineering or a closely related discipline;
  • Have an interest in soil-structure interaction and offshore foundation engineering;
  • Are comfortable working with numerical models and engineering data;
  • Have experience with or an interest in programming and numerical analysis;
  • Enjoy combining theoretical research with real-world offshore data;
  • Are analytical, curious and able to work independently while actively collaborating with experienced engineers.
What can you expect?
  • You will complete your graduation project within Heerema’s Foundation Engineering discipline and work on a topic that is directly relevant to the future installation of offshore wind foundations.
  • You will have the opportunity to work with experienced foundation engineers and use real-world engineering knowledge and field data to further develop your research.
  • The assignment is planned to run from February until August 2027 and is particularly suitable for a student from Delft University of Technology or a comparable technical university.
Interested?

Are you interested in offshore wind, foundation engineering and the engineering challenges behind installing the next generation of large monopiles? Then we would like to hear from you.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Graduation Assignment - Crane and vessel vibrations during vibratory pile driving
Graduation Assignment - Crane and vessel vibrations during vibratory pile driving

Heerema • Leiden

On-site
EUR 6,700 - 10,000
Monthly internship allowance
Guidance from senior engineers
Access to cutting-edge tools and infra
+1
MSc Internship: Offshore Vibration Pile Modeling
MSc Internship: Offshore Vibration Pile Modeling

Heerema • Leiden

On-site
EUR 13,000 - 20,000
Graduate Subsea Rock Installation
Graduate Subsea Rock Installation

Van Oord • Moerdijk

On-site
EUR 4,500 - 6,700
Graduation internship allowance
Intensive supervision from experienced
Principal Engineer Foundation
Principal Engineer Foundation

Heerema Marine Contractors • Leiden

On-site
EUR 130,000 - 180,000
Strong compensation & benefits
Annual bonus plan tied to company perf
Future-proof pension
+4
Graduation Thesis Subsea Rock Installation
Graduation Thesis Subsea Rock Installation

Van Oord • Moerdijk

On-site
EUR 10,000 - 17,000
A graduation internship allowance
Intensive supervision
Young Van Oord
+2
Structural Engineer
Structural Engineer

Van Oord • Gorinchem

Hybrid
EUR 90,000 - 120,000
Travel allowance
Home office allowance
32 leave days per year
+7
Principal Engineer - Foundation Engineering
Principal Engineer - Foundation Engineering

Heerema Marine Contractors • Netherlands

On-site
EUR 120,000 - 180,000
Bonus plan
13th month salary
Holiday allowance
+5
Graduate Subsea Rock Installation
Graduate Subsea Rock Installation

Van Oord • Gorinchem

On-site
EUR 4,500 - 6,700
Graduation internship allowance
Intensive supervision from experienced
Communities to join: Young Van Oord, a
Senior Installation Engineer
Senior Installation Engineer

Heerema • Leiden

On-site
EUR 70,000 - 110,000
Annual bonus
Holiday allowance
Pension plan
+4
Offshore Vibration Dynamics MSc Thesis: Crane–Vessel
Offshore Vibration Dynamics MSc Thesis: Crane–Vessel

Heerema • Leiden

On-site
EUR 6,700 - 10,000
Monthly internship allowance
Guidance from senior engineers
Access to cutting-edge tools and infra
+1