Data Center Construction Lead

Rotterdam Innovation City

Rotterdam

On-site

EUR 120,000 - 180,000

Full time

6 days ago
Be an early applicant
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

i3D.net in the Netherlands seeks a Data Center Construction Lead to guide a ground-up facility project, combining design assurance with owner representation and strong on-site leadership.

You will coordinate multi-vendor construction, optimize power and cooling design for high-density workloads, and ensure safety and regulatory compliance throughout the build.

Qualifications

  • Data center delivery leadership experience, including on-site oversight.
  • Strong technical authority in power, cooling, and facility systems.
  • Experience coordinating multi-vendor construction and commissioning.
  • Ability to manage multiple workstreams in a fast-paced environment.
  • Excellent communication and problem-solving skills; fluent English; Dutch a plus.

Responsibilities

  • Owns the ready-to-build design and approves drawings before construction.
  • Coordinate day-to-day site construction activities, schedules, milestones, and stakeholder communication.
  • Validate cooling, power, redundancy, and resilience to support high-density workloads.
  • Define immediate vs future growth needs with a clear expansion path.
  • Ensure safety culture and regulatory compliance on site.
  • Serve as owner's on-site representative for contractors and vendors.
  • Monitor progress, quality, and site readiness; escalate risks early.
  • Support commissioning, testing, turnover, and handover readiness.
  • Lead risk identification and mitigation to keep the project on track.

Skills

Data Center Delivery
Technical Authority
Field Experience
Composure under load
Clear communicator
Dutch language

Job description

At i3D.net, we provide world-class global coverage with one of the most interconnected networks in the world. Our solutions focus on low latency, zero packet loss, and unmatched scalability, enabling seamless experiences for millions of users worldwide. With dedicated support, bespoke solutions, and cutting-edge technology, we deliver reliable, cost-efficient infrastructure that empowers game developers and businesses to scale effortlessly. Partnering with major names like Nvidia, DuckDuckGo, and Ubisoft, we are shaping the future of gaming and network technology.

Why your role matters

As Data Center Construction Lead, you'll provide technical leadership for the ground-up construction of a new data center, designed to host both traditional colocation and high-density computing. The project will be delivered with an engineering firm, a general contractor, and specialist vendors. This role is responsible for design assurance and owner representation, partnering closely with our internal team of experts to ensure successful project delivery.

Acting as the owner's technical representative, you'll exercise independent judgment, accountability, and strong execution. You'll bring expertise in GPUs, liquid cooling, and critical facility systems, combined with broad data center knowledge to evaluate risks, coordinate technical stakeholders, and support effective decision-making during escalations.

What you’ll be doing
  • Design ownership: Own the ready-to-build design by validating that it meets business requirements and approve drawings before construction begins.

  • Constructive challenge: Challenge assumptions and identify more cost-effective, resilient, and future-ready solutions while design changes remain possible.

  • Technical validation: Validate cooling, power, redundancy, resilience, space, and structural requirements to support current and future high-density workloads.

  • Capacity planning: Define what must be built immediately versus provisioned for future growth, with a clear expansion path.

  • Site coordination: Coordinate day-to-day site construction activities, schedules, milestones, and stakeholder communication.

  • Quality and progress: Monitor progress, quality, and site readiness, ensuring installed work aligns with approved designs and addressing deviations early.

  • Risk management: Identify, elevate, and help resolve project risks, delays, and coordination issues.

  • Owner representation: Serve as the primary on-site representative for contractors and vendors, managing sequencing, logistics, and access.

  • Safety culture: Promote a strong safety culture and compliance with all site health and safety requirements.

  • Handover: Support commissioning, testing, turnover, operational readiness, documentation, training, punch-list management, and project closeout.

Tech stack

On this project, you'll work across:

  • Power and cooling: Data center power distribution, cooling, redundancy, resilience, and capacity planning.

  • High density cooling: Direct-to-chip cooling, CDUs, and rear-door heat exchangers supporting GPU and high-density compute.

  • Structural and space: Floor loading, rack layouts, clearances, and access routes.

  • Commissioning: Commissioning and testing activities, including load bank and integrated systems testing.

  • Delivery: Long-lead equipment procurement, deployment sequencing, and schedule impacts.

  • Operation readiness: MOPs, infrastructure change management, and operational readiness processes.

What success looks like in the first year
  • Design signed off with confidence: The ready-to-build design is validated against business requirements, and drawings are approved with open questions resolved rather than deferred.

  • Decisions made while they’re still cheap: Assumptions are challenged early, and improvements to cost, resilience, and future readiness are made while design changes are still possible.

  • A build that matches the drawings: Installed work aligns with the approved design, and deviations are caught and corrected early rather than at handover.

  • Risks surfaced, not discovered: Project risks, delays, and coordination issues are identified and escalated in time for the team to act on them.

  • A clean turnover: Commissioning, testing, documentation, training, and punch-list closeout leave the facility ready to operate.

Your profile
  • Data Center Delivery: You have led or overseen multiple data center construction projects, including at least one completed build at or near the scale of our 10,000 m² facility.

  • Technical Authority: You have strong knowledge of data center power and cooling infrastructure and can review designs, challenge technical decisions, and hold engineers, contractors, and suppliers accountable.

  • Field Experience: You have led construction activities on site, coordinating contractors and suppliers, tracking delivery against requirements, and making informed construction decisions on behalf of the owner.

  • Composure under load: You manage competing priorities and multiple workstreams in a fast-paced setting.

  • Clear communicator: You bring excellent communication, organizational, and problem-solving skills, and you are fluent in English.

  • Local context: Prior project experience in the Netherlands is a must. The ability to communicate in Dutch is considered a strong asset.

Nice to haves
  • High-density cooling: Hands‑on experience delivering direct‑to‑chip cooling, CDUs, and rear‑door heat exchangers.

  • Large-scale compute: Experience supporting large‑scale compute deployments, including vendor coordination and deployment sequencing.

  • Live environments: Experience working in live, mission‑critical environments.

  • Operational processes: Knowledge of MOPs, infrastructure change management, and operational readiness processes.

Location and engagement
  • Based in Rotterdam: This role is based in Rotterdam, the Netherlands, under a renewable annual contract.

  • On-site presence: Regular on-site presence is required, increasing during construction, commissioning, and handover phases.

Why join us?
  • Global gaming customers: Join a company with over 20 years of success, working with gaming leaders like Ubisoft and Discord.

  • Build it from the ground up: Lead a greenfield facility from design assurance through commissioning and turnover, rather than taking over a finished plan.

  • Technical depth: Work at the front edge of high‑density compute, liquid cooling, and critical facility systems.

  • Real ownership: Act as the owner's technical representative with the independence to challenge design decisions and hold vendors to standard.

  • Hands‑on impact: Deliver infrastructure that supports high‑performance gaming and digital experiences worldwide.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Data Center Construction Lead
Data Center Construction Lead

i3D.net • Rotterdam

On-site
EUR 120,000 - 180,000
Data Center Construction Lead
Data Center Construction Lead

i3D.net • Capelle aan den IJssel

On-site
EUR 90,000 - 130,000
Data Center Lead
Data Center Lead

Rotterdam Innovation City • Rotterdam

Hybrid
EUR 70,000 - 110,000
Annual bonus
Vacation days
Travel allowance
+3
Data Center Lead
Data Center Lead

Linuxconfig • Rotterdam

Hybrid
EUR 90,000 - 120,000
Annual bonus
Vacation days
Travel allowance
+3
Data Center Lead
Data Center Lead

Webhosting • Rotterdam

Hybrid
EUR 70,000 - 110,000
Senior Infrastructure Delivery Project Manager
Senior Infrastructure Delivery Project Manager

Webhosting • Rotterdam

Hybrid
EUR 95,000 - 130,000
Senior Technical Producer – Infrastructure Delivery
Senior Technical Producer – Infrastructure Delivery

Webhosting • Rotterdam

Hybrid
EUR 90,000 - 120,000
Network Engineering Manager
Network Engineering Manager

Linuxconfig • Rotterdam

Hybrid
EUR 110,000 - 150,000
Annual bonus
Vacation days
Travel allowance
+2
Data Center Lead
Data Center Lead

i3D.net • Rotterdam

Hybrid
EUR 75,000 - 110,000
Annual bonus
Travel allowance
Pension
+2
Senior Technical Project Manager - Network Products
Senior Technical Project Manager - Network Products

i3D.net • Rotterdam

On-site
EUR 90,000 - 130,000
Annual bonus
Travel allowance
Pension plan
+2