Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Comsip, a subsidiary of VINCI Energies Oil & Gas, seeks an SPS – HSE Management Services specialist to support the SPS Package Manager in implementing the Project HSE Management System and safeguarding personnel, environment and assets in Malaysia.
The role interfaces with Project H3SEQ, SPS Contractor and suppliers across fabrication, testing and service sites, driving H3SE objectives, audits and timely reporting to meet project requirements.
Comsip, a subsidiary of VINCI Energies Oil & Gas, specializes in providing highly qualified technical resources to support the most ambitious industrial projects around the world.
Our mission for over 75 years : to support the largest operators and engineering companies in the successful delivery of their complex projects, by providing key skills in Engineering,Construction,Commissioning,Operations and Maintenance.
With more than 120 experts available worldwide, Comsip operates with a responsible and sustainable approach, in perfect alignment with the values of the VINCI Energies group.
The service holder will be responsible for supporting the SPS Package Manager in implementing and deploying the Project HSE Management System to ensure the protection of personnel, respect for the environment & safeguarding of the operational assets by working closely with the Project H3SEQ Manager and Company’s entities.
The service is highly transverse, with numerous interactions among which:
To adopt & demonstrate a strict respect with regard to H3SE rules and requirements, and with regard to the Company Ethics and “Code of Conduct” policy
To actively promote Safety culture and awareness, and in general H3SE awareness
To coordinate all H3SE activities within the SPS package and, as such, shall liaise permanently with the SPS Package Manager and H3SE teams within the package, as well as with the Venus Project H3SEQ Manager
Act as a focal point within the package for all HSE teams on the different fabrication, testing or service sites.
To provide H3SE recommendations to the Package team, Project Management and Project team
To be the direct point of contact of the SPS Contractor HSE manager and team, and the SPS Contractor LOF HSE representatives in-country, and to follow up of all H3SE activities and performance of SURF Contractor and its subcontractors
To ensure that HSE requirements are complied with within the package, including SPS Contractor and its subcontractors
To define and review H3SE management systems and requirements - Philosophy, Plans and Procedures – from Project, package & SPS Contractor
To review Contractors’ H3SE management systems, and control their implementation by conducting regular safety audits of Contractors on all sites, including fabrication yards and Marine Spread
To collect, follow-up and report all H3SE performance, statistics & KPIs compared to objectives and ensure reporting is done adequately and timely by all involved parties
To propose actions for use of the SPS contract HSE Incentive scheme
To analyze incidents, perform investigations, organize feedback to management and personnel and propose mitigations and way forward to improve situations and avoid re-occurrence
To ensure that the safety reviews are conducted in a timely and proper manner to comply with Project H3SE targets
To participate to site HSE visits, premob reviews, audit… and prepare Package management HSE visits.
To ensure actions from reviews, audits, etc. (external and internal) are implemented and completed
To define and implement H3SE training plan for COMPANY SPS team and ensure adequate H3SE training of SPS Contractor and its subcontractors’ teams (as necessary)
To support the package manager and Project H3SEQ Manager on all H3SE matters
To ensure readiness of all H3SE documentation and follow-up as necessary with all parties, including Local Authorities when required
To gather ‘lessons learnt’ and provide feedback to TotalEnergies entities as required
The VENUS deep offshore Project is a key project for TotalEnergies as the first Oil & Gas facilities to be installed in Namibian waters with 3,000 m water depth and uncommon reservoir characteristics with a CAPEX > 10 BUSD. 38 wells to be drilled and completed (19 OP and 19 GI) with a DRILLEX > 3 BUSD; out of ~2/3 to be ready before First Oil date.
The Venus Project will be developed with the objectives to maximize economical results by optimizing the reserves, the schedule, reducing the costs and the Greenhouse Gas (GHG) emission, while maintaining the technical quality of the installations, with high H3SE requirements and focus.
International and multi-cultural environment.
Many suppliers’ locations, several fabrications, preparation / testing / servicing sites worldwide.