Enable job alerts via email!

Planner Sr

Jabil Circuit

Penang

On-site

MYR 40,000 - 80,000

Full time

30+ days ago

Boost your interview chances

Create a job specific, tailored resume for higher success rate.

Job summary

An established industry player is seeking a dedicated Production Planner to oversee all planning activities within a workcell. This role involves mentoring team members, ensuring on-time delivery, and maintaining precise revenue forecasts. You will develop and manage the Master Production Schedule (MPS) while ensuring material control and capacity planning are optimized. The ideal candidate will possess a strong educational background, with a Bachelor's degree and relevant experience, or higher qualifications. Join a dynamic team where your expertise will directly contribute to operational excellence and customer satisfaction.

Qualifications

  • 5+ years of experience in production planning or related field.
  • APICS certification preferred for advanced planning knowledge.

Responsibilities

  • Manage all planning activities for the assigned workcell.
  • Ensure 100% on-time delivery and maintain accurate revenue forecasting.
  • Develop and manage Master Production Schedule (MPS).

Skills

Production Planning
Material Control
Capacity Planning
Revenue Forecasting
BOM Management

Education

Bachelor's Degree
Master's Degree
PhD

Tools

ERP System

Job description

JOB SUMMARY
Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell.

ESSENTIAL DUTIES AND RESPONSIBILITIES

  1. Ensure 100% on-time delivery.
  2. Establish build readiness.
  3. Maintain efficiency of capacity and customer sizing.
  4. Maintain accurate revenue forecasting.
  5. Maintain material control and liability.
  6. Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  7. Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  8. Ensure the MPS is always 100% accurate and achievable.
  9. Achieve and maintain 95% MPS goal.
  10. Own production planning, BOM and document control with or without additional support.
  11. Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  12. Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  13. Meet daily with the Workcell and manufacturing team to assess production schedules, adjust as necessary based on production results, optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  14. Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
  15. Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  16. Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  17. End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  18. Manage Jabil purge process for internal Workcell purges.
  19. Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  20. Comply and follow all procedures within the company security policy.

MANAGEMENT & SUPERVISORY RESPONSIBILITIES

Typically reports to Management. Direct supervisor job title(s) typically include: TBD. Job is NOT directly responsible for managing other employees (e.g., hiring/termination and/or pay decisions, performance management).

EDUCATION & EXPERIENCE REQUIREMENTS

Bachelor’s degree + 5 years of experience, or Masters + 3 years of related experience, or PhD without experience. APICS certification and Supervisor experience also preferred. Thorough knowledge of MRP, lead times for specific component types, internal run rates, test development lead times, machine programming lead times and complete understanding of the chronological sequence of events that must occur in order to build a product. Or an equivalent combination of education, training, or experience.

Get your free, confidential resume review.
or drag and drop a PDF, DOC, DOCX, ODT, or PAGES file up to 5MB.