An application made for this job — a tailored resume and cover letter that speak straight to the posting.
PeopleStrong seeks a Quality professional with 4–11 years of experience to manage quality plans, method statements and ITPs aligned with IS codes. The role involves on-site design mix preparation, documentation control, and coordination with client, contractor, site and consultants.
You will conduct quality toolbox talks, supervise on-site activities, ensure proper materials, and review calibration certificates.
Required Experience 4 - 11 years
Method Development Quality Quality Assurance Quality Control
BE
Responsible for the preparation and checking of Quality plan, Method statement and ITP with respect tospecifications / IS codes.? Responsible for Establishment or Preparation of Design Mix at site.? Maintaining all documents related to the site Quality Department, Drawing Register, and Checklist.? Responsible for study of specifications of Items of work.? To ensure that proper methodology and instructions are followed in execution of various activities.? Materials Management? On site scheduled Supervision of Works.? Reporting and Documentation (Control of Documents).? Coordination among the Client, Contractor ,Site and Consultants? Drawing coordination with consultant.Inspection of incoming material received at site for MTC availability andorganizing qualification tests as per ITP/Method Statements.? Process Quality Checks of Activities – Utility Diversion Works, Secant Piles,Capping Beam and Flood Walls, Rock Anchoring, RCC Waller Beams, RockBolting Excavation, Drilling and Controlled Blasting, Shotcrete etc. as perITP’s/Method Statements at project site.? Co-ordination with GC/PMRP Engineers for inspection of site activity as andwhen required and obtaining clearances.? Deliver Quality Toolbox Talk and conduct weekly meetings at site for guidingsite engineers and workmen to achieve desired quality and improveworkmanship in construction operations.? To ensure that approved material is being used at site and properdocumentation is being done for traceability of quality checks.? Identification of Non-Conformities (Violation of ITP and SOP) and coordinationwith site team for resolving Non-Conformities (NC’s) in stipulated time.? Inspection and review of Calibration Certificates of various equipment’s in use atsite and ensure calibrated instruments under use and calibration status.? Sampling and Visual Checks on Concrete, Shotcrete, Cement Grout