- DEIC-L&T Precision Engineering & Systems IC
- Coimbatore Campus
End Date 16 May 2027
Required Experience 5 - 10 years
Skills
Knowledge & Posting Location
Energy Storage Electrical Wiring Cooling System Drawing verification IEC ISO Lean Leadership
Bachelor of Technology (BTech)
Job Description
Production Engineer – Pack to Container
Grade: T1 | Experience: 5 – 10 years | Reports to: Production Manager
D E P A R T M E N T
Manufacturing & Ops
Full-Time
CIF Kancheepuram
1. ROLE PURPOSE
Lead integration of battery packs, racks, thermal, fire and auxiliary systems into BESS containers, ensuring
on-time, first-time-right delivery to FAT and dispatch.
2. KEY RESPONSIBILITIES
1. Container Build Planning & Execution
- Plan manpower, material readiness and schedule for each container build.
- Establish assembly SOPs, checklists, torque records and in-process inspection points.
- Prepare daily and weekly build plans linked to container dispatch dates.
2. Mechanical & Electrical Integration
- Execute rack installation, DC/AC cabling, liquid-cooling piping, HVAC, fire suppression and
- Interpret GA, SLD, wiring and P&ID drawings; build as per approved BOM.
- Verify rack, busbar and cable torque, polarity and insulation checks at each stage.
3. Quality & Compliance
- Ensure builds meet internal, client and regulatory standards (IEC / UL / ISO).
- Drive RCA and CAPA for rework and non-conformances; coordinate FAT readiness.
- Maintain build records, traceability and as-built documentation for FAT and handover.
4. Safety
- Enforce HV, work-at-height, lifting and Li-ion safety practices on the container line.
- Ensure ESD control and safe handling of energised racks and packs.
5. Coordination & Improvement
- Coordinate with Design, Quality, Testing and Stores for ECNs and material flow.
- Drive productivity, cost and rework reduction using Lean.
- Track man-hours per container, rework and material wastage; drive reduction plans.
- Apply Lean, 5S and standard work to cut cycle time and improve layout flow.
- Support cost and yield reviews with the Production Manager.
7. People & Shift Management
- Allocate technicians and supervisors across stations and shifts.
- Train operators on SOPs, safety and quality checkpoints; maintain skill matrix.
8. Documentation & Handover
- Coordinate NPI, ECN and BOM changes with Design.
- Hand over completed containers to Testing with complete check-sheets and punch-lists.
- Verify kit completeness for racks, cables, cooling and fire hardware before build starts.
- Raise shortages early with Stores and Procurement; track expedites.
Confidential - Job Description Sensitivity : This Document is Classifie d as "LNT Internal Use". Page 2 of 2
- Lead Kaizen and root-cause projects on recurring rework such as leaks, harness faults and torque misses.
- Prepare improvement reports and standardise winning practices across containers.
SCHEDULE ADHERENCE
100% On-Time
FIRST PASS YIELD
> 98.5%
REWORK
< 2%
EHS RECORD
4. IDEAL CANDIDATE PROFILE
Required Experience & Education
- Education: B.E. / B.Tech in Electrical,
- Mechanical or Electronics Engineering.
- Experience: 5–10 years in electromechanical
- assembly with BESS / EV / HV system integration
- exposure.
- Hands-on experience with coolant loop and leak
- testing.
- Cooling Drawing Reading IEC / UL / ISO Lean