A complete application in a minute — tailored resume and cover letter, ready to send.
Adani Group is seeking an experienced Lead EMS for Battery Energy Storage Systems (BESS) to design, develop, integrate, test, and commission advanced EMS solutions. You will optimize energy dispatch, renewable integration, and grid interaction while coordinating EMS-SCADA interfaces.
The role requires strong expertise in EMS architectures, energy optimization algorithms, and industry protocols (Modbus, IEC 61850, OPC-UA).