A complete application in a minute
Tailored resume and cover letter, ready to send.
Function Mining in Rajasthan, India seeks a Mining Engineer to survey and prepare statutory mine plans and sections under MCDR-1988 and MMR-1961. The role supports daily mine operations with survey data and planning outputs, using AutoCAD/data mine planning tools.
The candidate will coordinate with the shift in charge, ensure safety compliance, and contribute to eco-friendly mining practices while implementing continuous improvement and regulatory reporting.
Function Mining
Bachelor Of Engineering
To survey, prepare & maintain statutory plans, sections of mine. Surveying and taking Auto CAD/Data mine mine planning software output for internal planning in day to day mine operation to assist section head (shift) in mine operation. Mine planning is a continuous process which includes the systematic and scientific mining and conservation of mineral resources with minimum impact on the surrounding environment, scientific & eco-friendly mine closer plan being controlled by the regulatory authority Indian Bureau of Mines under MCDR-1988. Mine Safety and Mine Management is being controlled by the regulatory authority DGMS under Mines Act 1952 & MMR 1961. The position is responsible for survey and prepare the statutory plans & sections required under MCDR-1988 & MMR 1961, submit to the respective regulatory authority in due course of time or otherwise as required from time to time. As a part of basic requirement for safe, scientific and eco-friendly mining activity, the position is responsible to provide plans, sections, survey data & mining planning software output for various parameters in day to day planning activity and for monitoring the prescribed mining standard under statute and to set new benchmarks.. Major Challenges
KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1 Mine plans & sections Surveying & Levelling activity for preparation of statutory plans and sections required under MCDR-1988 and MMR-1961 and otherwise required by orders made their under. Mining Scheme Preparations of various plans and sections for 5 year scheme of mining for approval from IBM, Surveying and levelling work of mine area by Total Station survey instruments quarterly/ monthly. Downloading the survey data to Auto CAD/Data mine mine planning software.
KRA2 Cost Optimisation:
. Mine Survey & planning through software Implementation of mine planning software in day to day mining activity. To ensure volume of excavation monthly. Vocational Training Covering 20% mine workers annually training under Mine Vocational Training Rule-1966 Data, report generation in mine planning software Demarcation of over burden area as per mining scheme.
KRA3 Safety:
KRA4 System Implementation:
Organize and implement ISO, EMS, OHSAS, SA 8000 and WCM systems in his area of operation through the involvement of people for the improvement of quality standards and productivity. Identify and execute improvement study and kaizen.
Identify & get rectified: