SH Mechanical - Sewagram Cement Works

Aditya Birla

Sarangvado

On-site

INR 900,000 - 1,500,000

Full time

2 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

UltraTech Cement is seeking an experienced maintenance supervisor to oversee operation and maintenance activities at the plant, ensuring high availability and adherence to safety and quality standards.

You will coordinate with maintenance teams, develop SAP data, manage budgets, and drive continuous improvement initiatives in a large cement production environment.

Qualifications

  • Supervise & coordinate operation & maintenance activities to maximize plant availability.
  • Analyse stoppage reports and plan corrective actions.
  • Develop SAP data and material/manpower planning.
  • Ensure safety, ISO, EMS, and WCM system compliance.

Responsibilities

  • Supervise maintenance jobs and coordinate condition monitoring.
  • Plan shutdowns and allocate material and manpower.
  • Monitor costs, budgets and inventory.
  • Identify Kaizen opportunities and implement improvements.
  • Ensure safety and statutory compliance.

Skills

Preventive maintenance
Mechanical Engineering
Communication

Education

Bachelor of Engineering
Master of Engineering

Tools

SAP
MS Office

Job description

Preventive maintenance Mechanical Engineering SAP Communication MS Office

Bachelor Of Engineering Master of Engineering

CERTIFICATION
Job Description
Job Purpose

Supervise & co-ordinate execution of Operation & maintenance activities in the section to maximize plant availability to improve productivity at minimum maintenance cost.

Job Context:
UltraTech Cement Limited has an annual capacity of 52 million tonnes. It manufactures and markets Ordinary Portland Cement Portland Blast Furnace Slag Cement and Portland Pozzalana Cement. It also manufactures ready mix concrete RMC. The company has 11 integrated plants one white cement plant one clinkerisation plant in UAE 15 grinding units 11 in India UltraTech Cement is the country largest exporter of cement clinker. The export markets span countries around the Indian Ocean Africa Europe and the Middle East.2 in UAE one in Bahrain and Bangladesh each and five terminals four in India and one in Sri Lanka. UltraTech Cement is the country largest exporter of cement clinker. The export markets span countries around the Indian Ocean Africa Europe and the Middle East. Sewagram Cement Works was commissioned in 2009. The plant has clinker capacity of 3.6 MTPA and cement capacity of 2.4 MTPA. The Unit has two captive power plants (CPP) CPP-I with 35 MV and CPP-II with 22.5 MV capacity. The Unit has mines with reserve of 246.45 MT, a captive jetty, a desalination plant that can filter around 20 lakh litres of water every day and a bag-making plant. The plant also has an environmental cell which monitors air and water quality, audits, and conducts marine ecological studies and environmental studies of mines and nearby villages.
Job Challenges:
To reduce Breakdowns and improving plant availability.
To reduce the maintenance cost and manpower cost.

Key Result Areas

KRA (Accountabilities) (Max 1325 Characters)

Supporting Actions (Max 1325 Characters)

KRA1 Accountability: Operation & Maintenance Jobs:
  • Supervise & coordinate all operation maintenance activities of the section to maximize the plant availability to achieve production as per targets. Study stoppage report
  • Study checklist
  • Take corrective & preventive action.
  • Take plant round
  • Supervise maintenance jobs
  • Coordinate for conditional monitoring.
  • Develop SAP data.
  • Scheduling of shutdown jobs.
  • Workout material/ manpower requirement.
  • Organize material / manpower required.
  • Prepare indents.
  • Follow‑up for material requirement.
KRA2 Cost Optimisation:
  • Study and analyze and maintenance cost of the section compared to budget norms and implement action plans to optimize consumption/ maintenance cost. Prepare budgets.
  • Monitor actual cost with budget.
  • Take corrective actions.
  • Monitor inventory.
  • Attend task force meeting
  • Identify Kaizen/focused improvement area.
  • Study abnormalities / deviations
  • Analyse problematic areas
  • Review material requirement & inventory.
  • Control contractor cost.
  • Control over time.
KRA3 Modification / Upgradation:
  • Identify and carryout proposals for modifications / up-gradations for improvement in plant working on continuous basis in the section Analyse problems, breakdowns.
  • Identify areas requiring improvement
  • Carryout why-why analysis.
  • Review drawings / specifications
  • Formulate proposal.
  • Implement approved proposals.
  • Attend improvement meetings.
  • Review Technical Cell suggestions and implement.
KRA4 Safety & statutory compliance:
  • Carryout timely inspection of all jobs required as per statutory guidelines and ensure their timely compliance. Carryout the required checking, testing as per guidelines.
  • Maintain statutory records of the observations.
  • Take corrective measures for deviations.
  • Identify & rectify unsafe points & unsafe practice in the area.
  • On the job training to staff & workmen on safety & treatment.
KRA5 System Implementation:
  • Organize and implement ISO, EMS, OHSAS, SA 8000 and WCM systems in his area of operation through the involvement of people for the improvement of quality standards and productivity. Identify and execute improvement study and kaizen.
  • Identify & get rectified:
    Abnormalities. Spillage/leakages.
    Unsafe conditions/practices.5S activities.
    Points emerged in campaigns.
  • Execute implementation plan for Strategic quality projects.
  • Quality improvement objectives.
  • Improvement of WCM criteria score.
  • EMS targets.
  • Internal customer rating improvement. ISO system improvement.
  • Statutory compliance.
  • Improvement of OEE/MTBF/MTTR
  • Elimination of muda.
  • Does why why analysis.
  • Prepare/present weekly/monthly WCM presentation.
  • Develop one point lesson.
  • Update WCM activity boards.
  • Develop Model area.
  • Create awareness in team members.
  • Develop visual controls.
  • Monitor working of pollution control equipments...
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Egnieer/Sr.Eng/Asst.Manager- PF-Mech (JB-11)
Egnieer/Sr.Eng/Asst.Manager- PF-Mech (JB-11)

Aditya Birla • Tamil Nadu

On-site
INR 900,000 - 1,200,000
PF Mechanical (Rclmr & Trans) - Engineer/Sr Engineer/Asst. Manager
PF Mechanical (Rclmr & Trans) - Engineer/Sr Engineer/Asst. Manager

Aditya Birla Insulators • Anantapur

On-site
INR 1,000,000 - 1,500,000
PF Process (CRO & Raw Mill )
PF Process (CRO & Raw Mill )

UltraTech Cement Ltd. • Rajasthan

On-site
INR 1,200,000 - 1,800,000
FLE Mechanical (Cement Mill)
FLE Mechanical (Cement Mill)

UltraTech Cement Ltd. • Pali

On-site
INR 1,200,000 - 1,800,000
PF Process (CRO & Raw Mill )
PF Process (CRO & Raw Mill )

Aditya Birla • Nathdwara, Neem Ka Thana

On-site
INR 350,000 - 550,000
PF Mines (Operation)
PF Mines (Operation)

Aditya Birla • Raja ka Bagh

On-site
INR 1,200,000 - 2,000,000
PF Mechanical (Kiln & Cooler)
PF Mechanical (Kiln & Cooler)

UltraTech Cement Ltd. • Maharashtra

On-site
INR 1,200,000 - 1,800,000
PF Electrical (Raw Mill) - Asst.Manager/Sr.Engineer/Engineer
PF Electrical (Raw Mill) - Asst.Manager/Sr.Engineer/Engineer

UltraTech Cement Ltd. • Andhra Pradesh

On-site
INR 600,000 - 900,000
PF HR (L&D) Professional
PF HR (L&D) Professional

Aditya Birla Insulators • Kachchh

On-site
INR 600,000 - 900,000
PF Process (CRO & Raw Mill )
PF Process (CRO & Raw Mill )

Aditya Birla Group • Rajasthan

On-site
INR 500,000 - 700,000