Overseas Structural Engineer - Data Center Construction Lead

AIDAT TECHNOLOGY PTE. LTD.

Kepulauan Riau

On-site

IDR 167,400,000 - 279,000,000

Full time

3 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

AIDAT TECHNOLOGY PTE. LTD. seeks an experienced Civil/Structural Engineer to lead the schematic design and on-site supervision for an Indonesia overseas data center project.

You will review drawings from collaborating institutes and drive optimization, ensuring compliance with local Indonesian codes and international guidelines. The role requires 4–6+ years in structural design and site management, hands-on overseas project experience, and strong knowledge of concrete and steel design codes.

Qualifications

  • Bachelor's degree or above in Civil/Structural Engineering.
  • Grade I or II Registered Structural Engineer certificates preferred.
  • 4–6 years or more of experience in structural design and construction site management.

Responsibilities

  • Review structural design drawings, plans, and calculation reports to ensure compliance with project requirements and Indonesian standards.
  • Provide on-site technical guidance, process control, and inspections for steel and concrete structures.
  • Ensure construction outcomes comply with local building codes and safety standards.
  • Oversee quality, safety, and schedule of civil works and coordinate with third‑party institutes.

Skills

Civil engineering
Structural engineering
Construction supervision
On-site supervision

Education

Bachelor's degree or above
Grade I or II Registered Structural Engineer

Job description

AIDAT TECHNOLOGY PTE. LTD. seeks an experienced Civil/Structural Engineer to lead the schematic design and on-site supervision for an Indonesia overseas data center project.

You will review drawings from collaborating institutes and drive optimization, ensuring compliance with local Indonesian codes and international guidelines. The role requires 4–6+ years in structural design and site management, hands-on overseas project experience, and strong knowledge of concrete and steel design codes.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Civil and Structural Engineer
Civil and Structural Engineer

AIDAT TECHNOLOGY PTE. LTD. • Kepulauan Riau

On-site
IDR 167,400,000 - 279,000,000
Overseas Data Center Low-Voltage Engineer
Overseas Data Center Low-Voltage Engineer

AIDAT TECHNOLOGY PTE. LTD. • Kepulauan Riau

On-site
IDR 450,000,000 - 650,000,000
Data Center Electrical Design Engineer
Data Center Electrical Design Engineer

AIDAT TECHNOLOGY PTE. LTD. • Kepulauan Riau

On-site
IDR 180,000,000 - 260,000,000
On-Site Data Center HVAC Lead – Indonesia
On-Site Data Center HVAC Lead – Indonesia

AIDAT TECHNOLOGY PTE. LTD. • Kepulauan Riau

On-site
IDR 180,000,000 - 280,000,000
On-Site Electrical Engineer — Data Center Power Systems
On-Site Electrical Engineer — Data Center Power Systems

AIDAT TECHNOLOGY PTE. LTD. • Kepulauan Riau

On-site
IDR 200,000,000 - 320,000,000
Lead Data Center Infrastructure Architect for 10MW AIDC
Lead Data Center Infrastructure Architect for 10MW AIDC

AIDAT TECHNOLOGY PTE. LTD. • Kepulauan Riau

On-site
IDR 1,597,161,000 - 2,129,547,000
Technical Director (Data Center)
Technical Director (Data Center)

PT Talenta Eksekutif Asia • Jakarta Pusat

On-site
IDR 600,000,000 - 900,000,000
Site Engineer - Data Center Projects Lead
Site Engineer - Data Center Projects Lead

PT. CSCEC International Indonesia • Desa Ciranjeng

On-site
IDR 240,000,000 - 360,000,000
Senior Civil & Structural Lead — Plant Expansion
Senior Civil & Structural Lead — Plant Expansion

Archi Indonesia • Indonesia

On-site
IDR 350,000,000 - 600,000,000
LEAD CIVIL STRUCTURAL ENGINEER
LEAD CIVIL STRUCTURAL ENGINEER

Archi Indonesia • Indonesia

On-site
IDR 350,000,000 - 600,000,000