A complete application in a minute
Tailored resume and cover letter, ready to send.
Allerton Grange School in Leeds is seeking a dedicated teaching assistant to support SEND students. The role is term-time, part-time, with a 31.25-hour week, aligned with school hours (08:30–15:15) and includes breaks.
The position offers opportunities to grow within a supportive school community and to contribute to high-quality teaching. We value integrity, compassion and collaboration, and provide a strong professional development ethos along with a generous benefits package and flexible
Allerton Grange School in Leeds is seeking a dedicated teaching assistant to support SEND students. The role is term-time, part-time, with a 31.25-hour week, aligned with school hours (08:30–15:15) and includes breaks.
The position offers opportunities to grow within a supportive school community and to contribute to high-quality teaching. We value integrity, compassion and collaboration, and provide a strong professional development ethos along with a generous benefits package and flexible