Plant Modification Proposal Manager

Morson Group

England

Hybrid

GBP 68,000 - 97,000

Full time

10 days ago

Get a reply from this recruiter

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Morson Group is seeking a Plant Modification Proposal Manager to lead the end-to-end PMP process for modifications, upgrades, or retrofits of plant equipment and systems in line with Nuclear Site licence Condition 22. The role is based at Sellafield on a hybrid basis and initially runs as a 12 month contract inside IR35 at £60ph.

SC clearance is required for this role. Applicants must be British citizens/passport holders and have not worked outside the UK in the past five years.

Qualifications

  • PMP management experience is required for Cat B–E projects.
  • Strong PM/Engineering background with plant systems knowledge.
  • Deep understanding of LC22 requirements and safety case principles.

Responsibilities

  • Lead end-to-end PMP process from conception to close out.
  • Coordinate with SME's and safety committees as needed.
  • Ensure timely PMP submission and activation of safety assessments.

Job description

I am looking for a Plant Modification Proposal Manager to be responsible for leading the end-to-end process of developing, reviewing, and submitting technical proposals for modifying, upgrading, or retrofitting plant equipment and systems in line with Nuclear Site licence Condition 22. Their primary purpose is to ensure that proposed changes are safe, technically compliant, economically viable, and approved within strict project schedules.

This role will be based at Sellafield on a hybrid basis and is initially a 12 month contract position inside IR35 at £60ph.

SC clearance is required for this role.

***Only apply if you are a British Citizen and passport holder and not have worked outside the UK during the past 5 years.***

ROLE RESPONSIBILITIES:

All activities associated with ensuring compliance with the PMP process from conception to close out, including:

  • Ensuring that PMP preparation involves timely consultation with all relevant SME (e.g., Safety Case Manager, Environment Specialist, Security & Resilience Manager, COMAH.
  • Ensuring that the PMP is filled in correctly, in totality.
  • Ensuring that all hazards which may arise from a misconceived or inadequately implemented modification are identified and the consequences considered.
  • Ensuring that all supporting safety assessments (e.g., radiological, nuclear, environmental or conventional) are available with the PMP.
  • Assigning a provisional safety category to the PMP.
  • Advising the Level 4 RIM of PMP’s categorised as A, B, E1 or CC1.
  • Arranging, where required, the presentation of the PMP to the relevant safety committee(s).
  • Ensuring that where a PMP could affect safety, environmental or COMAH performance in another plant, it is submitted to the other relevant PMP Committee(s) for consideration.
  • Arranging, where required, submission of the PMP to ONR/EA.
  • Ensuring that the PMP is fully implemented, tested and closed.
  • Ensuring that if, during PMP implementation, circumstances change or are different to those previously agreed in the PMP, work is stopped and the impact on the PMP is assessed.
  • Ensuring that plant drawings are updated as required.
  • Confirming that Safety Case Implementation is complete.
  • Providing hold point release information in accordance with a hold point release schedule in accordance with SLP 4.07.06. Ensuring that, if required, a replacement PMP Manager is identified and that adequate handover of the PMP takes place. A change of PMP Manager must be agreed by the Head of Operations or Deputy and communicated to the PMP co-ordinator team.
  • Generating and signing PMP amendments - refer details in section 1.8.
  • Implementation of the Overdue PMP Reporting process (Appendix 2).
  • Attending all required PMP surgeries and providing a current and accurate update of the status of the PMP.
ESSENTIAL CRITERIA:
  • PMP Manager SQEP is in line with the requirements of SR0997.
  • Demonstrable experience as a PMP manager leading Cat B-E PMP’s.
  • Project Management or Engineering background.
  • Strong understand of plant systems and design basis such as engineering substantiation and safety case principles.
  • Deep understanding of LC22 requirements.
  • Experience of Safety case production and implementation.
  • Experience of Nuclear hazard identification and assessment (HAZOP).
  • An understanding of ONR Technical assessment guides (TAGs).
  • Ability to obtain SC level security clearance (this includes but is not limited to identity, employment, financial and criminal record checks plus 5 years’ worth of UK residency).
DESIRABLE CRITERIA:
  • Experience working on complex infrastructure or nuclear projects.
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Plant Modification Proposal Manager
Plant Modification Proposal Manager

Morson Edge • England

Hybrid
GBP 68,000 - 97,000
Nuclear Plant Modification Proposal Lead (Hybrid)
Nuclear Plant Modification Proposal Lead (Hybrid)

Morson Group • England

Hybrid
GBP 68,000 - 97,000
Senior Project Manager
Senior Project Manager

VINCI Construction • Warrington

Hybrid
GBP 70,000 - 110,000
Nuclear Plant Modification Proposals Lead
Nuclear Plant Modification Proposals Lead

Morson Edge • England

Hybrid
GBP 68,000 - 97,000
Project Manager (Control Systems)
Project Manager (Control Systems)

Morson Group • Warrington, Whitehaven

Hybrid
GBP 60,000 - 90,000
Scope PM
Scope PM

Bilfinger UK • Bridgwater

On-site
GBP 60,000 - 90,000
Nuclear Project Manager
Nuclear Project Manager

Shepley Engineers Ltd. • Springfields

On-site
GBP 80,000 - 110,000
Senior Project Manager
Senior Project Manager

Rullion • Warrington

On-site
GBP 90,000 - 120,000
Scope PM
Scope PM

Bilfinger • Bridgwater

On-site
GBP 75,000 - 110,000
Project Engineer / Manager
Project Engineer / Manager

Mitie Group • England

Hybrid
GBP 55,000 - 90,000