A complete application in a minute
Tailored resume and cover letter, ready to send.
Ferrovial BAM Joint Venture (FBJV) is seeking a High Speed Depot Integration Manager to coordinate Calvert IMD design interfaces across track, rail systems and utilities. You will lead workshops, capture information and ensure buildable, safe, and compliant design delivery for the depot facility.
The role sits within the Engineering/Design function with London-based responsibilities and periodic meetings in Birmingham/London; a design-focused posting rather than depot-committed presence.
Department: Engineering/Design
Reports to: Calvert IMD Design Manager (IMD Infrastructure Maintenance Depot)
Location: This role can be based in either Euston or Birmingham. Although the depot is located in Calvert, this is a design-related role and therefore does not require a permanent presence at the depot.
We are recruiting for a High-Speed Depot Integration Manager to join the HS2 Track infrastructure project during the initial design phase, which will run alongside the completion of main works contracts now at their peak. We are now developing the Calvert IMD design team, which will interface with the Track design team, Rail Systems, NR and Main Works Civils contracts. We will need to manage interfaces and resolve any potential issues relating to the integration of the Calvert IMD design, including earthworks, utilities, communications, rail systems and P-Way.
As High-Speed Depot Integration Manager, you will manage and coordinate all design interfaces related to the Calvert IMD, attending/organising workshops and eliciting information to inform the design delivery of the railhead, On Track Maintenance shed, Office building, ancillary buildings and external works associated with the depot facility. These design interfaces will mainly relate to the Inter-system interfaces with the other HS2 contract packages but will also include any extra-system interfaces with third parties.
This is a hands-on role that will also cover the management of intra-system interfaces between sub-systems, initially from a constructability and maintainability perspective at design reviews, through to managing design information between supply chain package managers.
The Calvert IMD is part of the FBJV Rail Systems delivery, as such this role will engage with the Integration and Interface leads, to ensure the technical interfaces are correctly registered.
The Ferrovial BAM Joint Venture (FBJV) has a successful history of delivering critical infrastructure for the UK on time and to budget together in joint venture partnership. They first worked together in 2010 as BFK, delivering three Crossrail contracts, including the longest stretch of tunnelling works between Royal Oak and Farringdon and Farringdon Station, the first central station to be completed on the Elizabeth Line. The team also successfully delivered Silvertown Tunnel project together in East London and has been delivering excellence at each stage of HS2, such as Fusion JV for the Enabling Works packages, EKFB for the central Main Works Contract and now delivering the track infrastructure across the entire HS2 route.