A complete application in a minute
Tailored resume and cover letter, ready to send.
STRABAG UK leads the Haweswater Aqueduct Resilience Programme (HARP) in the North West of England. The role focuses on assisting with electrical systems specification, procurement, installation and safe operations across multiple construction sites involved in upgrading the aqueduct.
The position requires a relevant Master’s/Bachelor’s degree, strong analytical skills, and the ability to work within a team while coordinating across sites.
The Haweswater Aqueduct Resilience Programme (HARP) is a £3 billion infrastructure project led by United Utilities to upgrade the 110-kilometre Haweswater Aqueduct in the North West of England. STRABAG UK are leading the full design and construction scope of the project.
The Haweswater Aqueduct Resilience Programme (HARP) is a £3 billion infrastructure project led by United Utilities to upgrade the 110-kilometre Haweswater Aqueduct in the North West of England. STRABAG UK are leading the full design and construction scope of the project.
The aqueduct was originally built between 1933 and 1955; the project will be replacing six aging underground tunnel sections (totalling over 50km) to secure long-term clean drinking water supply to 2.5 million people across Cumbria, Lancashire, and Greater Manchester.
Please note, the role will close to applications on Monday 30th November 2026.