Transformez ce poste en entretien — un CV et une lettre de motivation conçus selon ce que cet employeur recherche.
TotalEnergies SPS Execution Testing expert is needed to coordinate system testing and the qualification program for the GranMorgu SPS scope, ensuring compliance with technical, quality, planning and HSE requirements.
The role covers coordinating testing planning, validating interfaces with Engineering, Planning and Fabrication, identifying equipment and tooling, integrating the testing schedule with the overall package, and reporting daily progress from the Paris-based site with potential global
Description
The Service Provider shall be responsible for coordinating System Testing and the possible TechnologyQualification Program and activities associated with the SPS scope of work according to the technical, quality,planning and HSE requirements.
The SPS scope for GranMorgu project covers mainly but is not limited to 34 off XT full systems, 6 off Production& 9 off Injection manifolds with their mudmats, 8 off Subsea distribution units with their mudmats, around 600connectors, UTA and UTH terminating umbilical’s, required tooling and topside control system hardware &software.
At all times, the service provider will:
In undertaking this role, the Service Provider shall coordinate, validate, and supervise all SPS Integration Testingactivities by:
The Service Provider will also:
The Service Provider will report to the SPS Technical Leader
In October 2024, TotalEnergies announced the Final Investment Decision for the GranMorgu development on Block 58 in Suriname. This deep offshore oil project aims to develop nearly 700 million barrels of reserves, with the FPSO unit expected to start production in 2028. The multidisciplinary GranMorgu project team, managed by TotalEnergies E&P, coordinates development studies to optimize reserves, schedule, costs, and GHG emissions while maintaining high technical quality and H3SE standards. GranMorgu exemplifies TotalEnergies' transition strategy, focusing on economic and social impact on Suriname and minimizing greenhouse gas emissions.
As a flagship project for TotalEnergies, GranMorgu requires support to enhance its reputation and awareness.
Starting date: November 2026
Duration: 1 year minimum to 3 years
Location (country/site): France / Paris – Contractor Work Unit and Testing locations with periodic missions to follow activities in Paramaribo / Suriname
Status: Residential
Rotational, Not Applicable
Professional Experience: At least 20 years