Data Center Construction Electrical Design Engineer

Worldwide Mission Critical

Fully

On-site

CHF 120,000 - 180,000

Full time

23 hours ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Worldwide Mission Critical is seeking an Electrical Design Engineer to guide planning, coordination, and execution of advanced electrical systems on large-scale data center projects. You will collaborate with internal teams and external partners to ensure robust, code-compliant designs aligned with project objectives.

You will focus on reliable, efficient, and scalable electrical solutions while upholding safety, quality, cost, and schedule commitments, mentoring junior engineers, and supporting

Qualifications

  • Bachelor’s degree in Electrical Engineering or Power Engineering with electrical building systems emphasis.
  • Revit BIM design experience required.
  • Proficiency in power distribution and lighting design, including controls implementation.
  • Experience with short circuit analysis and SKM or similar tools.
  • Strong background in design, construction, and commissioning of medium and low voltage electrical systems.

Responsibilities

  • Serve as a liaison between internal departments, consultants, contractors, and the EoR to troubleshoot electrical design challenges.
  • Lead development and review of electrical documents, including one-line diagrams, load calculations, and panel schedules.
  • Research emerging trends to optimize electrical systems in data centers for efficiency and reliability.
  • Ensure timely delivery of design packages by identifying bottlenecks and managing evolving requirements.
  • Ensure compliance with NEC, IEEE, IEC and mitigate design risks.

Skills

Electrical design
Power distribution
Code compliance
Mentoring staff

Education

Bachelor's degree in Electrical or Power Engineering

Tools

Revit BIM design
SKM or similar

Job description

About Worldwide Mission Critical

Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, our ability to provide oversight for all aspects of a project sets us apart.

About Worldwide Mission Critical

Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, our ability to provide oversight for all aspects of a project sets us apart.

Summary

As an Electrical Design Engineer, you will play a critical role in guiding the planning, coordination, and execution of advanced electrical systems on large-scale infrastructure projects. You will work cross-functionally with internal teams and external partners to ensure that all designs are technically robust, code-compliant, and aligned with project objectives. Your focus will be on delivering reliable, efficient, and scalable electrical solutions while upholding safety, quality, cost, and schedule commitments.

Primary Responsibilities
  • You will serve as a key liaison between internal departments, external consultants, contractors, and the Engineer of Record (EoR) to troubleshoot and resolve electrical design challenges.
  • You will lead the development and review of electrical documents, including one-line diagrams, load calculations, panel schedules, submittals, technical studies, and RFIs.
  • You will research and develop emerging trends and new technologies to optimize electrical systems and infrastructure in data centers, enhancing efficiency, reliability, and scalability.
  • You will be responsible for ensuring the timely delivery of design packages by identifying bottlenecks, introducing efficiencies, and proactively managing evolving project requirements.
  • You will ensure electrical systems meet all applicable codes and standards (NEC, IEEE, IEC) while maintaining design quality and mitigating technical risk.
  • You will contribute to budget management by evaluating the cost impact of design changes, tracking electrical expenditures, and analyzing contractual obligations tied to the EoR.
  • You will participate in risk assessment and commissioning efforts, including factory and site acceptance testing, milestone inspections, and integration verification.
  • You will coordinate closely with mechanical, controls, and architectural teams to ensure the electrical systems are fully integrated into the broader design framework.
  • You will mentor and support junior engineers, reinforcing consistent design practices and ensuring knowledge continuity across the team.
  • You will help capture lessons learned and apply them to improve future design processes, standards, and project outcomes.
  • You will support construction activities in the field, resolving installation issues, conducting walkthroughs, and ensuring a successful handoff to operations.
Skills, Knowledge, Education, And Experience
  • Bachelor’s degree in Electrical Engineering or Power Engineering with electrical building systems emphasis.
  • Revit BIM design experience required.
  • Proficiency in power distribution and lighting design, including controls implementation.
  • Experience with short circuit analysis and utilization of analytical modeling software such as SKM or similar tools.
  • Strong background in the design, construction, and commissioning of medium and low voltage electrical distribution systems, and power management or SCADA tools.
  • Preferred qualifications include a Professional Engineering (PE) license.
  • Experience in mission-critical facilities and their electrical/mechanical infrastructure.
  • Knowledge and experience in estimating, electrical design, operation, and commissioning of substations, switchgear, and power monitoring.
  • Minimum 5 years' experience in A/E industry preferred.
  • Comprehensive understanding of professional services from conceptual design through project close-out.
  • Strong written and verbal communication skills, organizational skills, and ability to motivate and mentor staff.
  • Familiarity with sustainable design approaches and related project impacts.
  • Passion for improving workflows and mentoring team members.
  • Proficient with Microsoft Productivity Suite products.

We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center Construction Senior Mechanical Design Engineer
Data Center Construction Senior Mechanical Design Engineer

Worldwide Mission Critical • Fully

On-site
CHF 120,000 - 190,000
Data Center Electrical Design Engineer - Lead, Scalable Power
Data Center Electrical Design Engineer - Lead, Scalable Power

Worldwide Mission Critical • Fully

On-site
CHF 120,000 - 180,000
Electrical Engineer - Data Center
Electrical Engineer - Data Center

Michael Page (Belgium) • Zürich

On-site
CHF 90,000 - 140,000
Electrical Design Engineer (M/F)
Electrical Design Engineer (M/F)

Expleo Group • Oberwallis

On-site
CHF 90,000 - 140,000
Digital Project Engineer
Digital Project Engineer

avec compétence GmbH • Baden

Hybrid
CHF 110,000 - 180,000
Hybrid work model
Interim to permanent contract
Digital Project Engineer
Digital Project Engineer

ABB Inc • Baden

Hybrid
CHF 140,000 - 180,000
Digital Project Engineer
Digital Project Engineer

ABB Schweiz AG • Baden

Hybrid
CHF 90,000 - 150,000
Electrical Design Engineer – Power Electronics
Electrical Design Engineer – Power Electronics

AYES - Management & Technology Consulting • Baden

On-site
CHF 90,000 - 120,000
Digital Project Engineer
Digital Project Engineer

Try&Hire • Aargau

Hybrid
CHF 90,000 - 130,000
Hybrid work model
Commissioning Manager - Electrical
Commissioning Manager - Electrical

Global Commissioning • Zürich

On-site
CHF 120,000 - 160,000
20 days holiday plus bank holidays
Top locations