Stand out for this role — generate a tailored resume and cover letter in about a minute.
JFE Shoji Power Canada in Burlington, Ontario, seeks a temporary Quality Control Plan Administrator for an 8-month contract. You will handle clerical transactions in the Smart Factory MES, ensuring pre-configuration includes the correct Quality Control Plan inspections on Work Orders.
You will collaborate with Production Planners and quality teams, perform data entry in company systems, review transactions for accuracy, and support administrative tasks across Quality, Production, and Engineering.
JFE Shoji Power Canada (JSC) is an electrical steel products manufacturer located in Burlington, Ontario. As the largest producer of transformer cores in North America, JSC specializes in wound, amorphous, and step-lap cores for power generation and distribution equipment. Its electrical steel products and magnetic materials are also used in electric vehicle motors and charging station infrastructure, data centres, audio equipment, and other industrial applications.
Since 1972, JSC (formerly Cogent) has grown from a small niche manufacturer to an integral part of the North American electrical steel supply chain with multiple facilities and over 500 employees. JSC is dedicated to meeting the growing demand for electrical energy by providing strategic, innovative, and sustainable solutions to its clients.
At JFE Shoji Power Canada, we are more than just a company—we are a community that embraces safety. We have a proactive safety attitude where every team member is empowered to care for each other and take responsibility for keeping everyone safe. By embodying the ICare principles, we ensure that safety is not just a priority but a core value of our culture. Each employee plays an essential role in shaping a workplace where safety is embedded in every action we take, and where incidents are prevented before they happen.
This temporary (8-month) contract role, with the possibility of extension, is responsible for clerical transactions within our new Smart Factory™ Manufacturing Execution System (MES), which must be completed on a Production Work Order basis, prior to release to the shop floor. Specifically, these pre-configuration transactions will ensure at the appropriate Product Quality Inspections are included for both Product Associate and Quality Inspector use, improving clarity & reducing complexity.
As defined by standard work, complete transactions for Smart Factory™ \"inspection group\" selections accurately and in a timely manner, to ensure the correct Quality Control Plan Inspection are defined on a Work Order basis. This involves:
Please note: JFE Shoji Power does not accept agency resumes and is not responsible for any fees related to unsolicited resumes.