Senior Project Planner – M&E, Schedule & Risk Lead

Jones Engineering

Henegouwen

Sur place

EUR 55 000 - 75 000

Plein temps

14 jours+
Générateur de candidature

Transformez ce poste en entretien — un CV et une lettre de motivation conçus selon ce que cet employeur recherche.

Passez les filtres ATS

Résumé du poste

Jones Engineering is seeking a site-based Project Control Engineer to build and develop tender and construction schedules, monitor progress and ensure contract compliance on complex M&E projects.

The role requires 3-5 years post-qualification experience in an M&E contracting environment, and demonstrated experience with Primavera P6. You will attend site meetings and coordinate weekly construction reports with the project team.

Qualifications

  • 3–5 years post-qualification experience (ideally in an M&E contracting environment).
  • Experience using Primavera P6 is required.
  • Site-based role with a standard working week or rotation.

Responsabilités

  • Build/develop tender schedules.
  • Build/develop construction schedules.
  • Updates/progress tracking.
  • Time Impact Analysis.
  • Critical Path & Risk Analysis.
  • Contract compliance.
  • Coordinate with construction team to log issues via change control mechanisms.
  • Attend site meetings (internal and client based).
  • Monitor original versus actual budgets for scope changes.
  • Use Jones Engineering internal project control system.
  • Lead in production/coordination of weekly construction reports.

Formation

Relevant 3rd level qualification

Outils

Primavera P6

Description du poste

Jones Engineering is seeking a site-based Project Control Engineer to build and develop tender and construction schedules, monitor progress and ensure contract compliance on complex M&E projects.

The role requires 3-5 years post-qualification experience in an M&E contracting environment, and demonstrated experience with Primavera P6. You will attend site meetings and coordinate weekly construction reports with the project team.

Obtenez votre examen gratuit et confidentiel de votre CV.
ou faites glisser et déposez votre fichier ici.
Similar jobs

Postes similaires à comparer

Senior Planner - Charleroi - 145378
Senior Planner - Charleroi - 145378

Jones Engineering • Henegouwen

Sur place
EUR 55 000 - 75 000
Mechanical Project Manager — Lead Cross-Functional Builds
Mechanical Project Manager — Lead Cross-Functional Builds

Jones Engineering • Henegouwen

Sur place
EUR 60 000 - 90 000
Project Controller
Project Controller

CTRL-F • Berchem

Sur place
EUR 45 000 - 65 000
Project Manager / Owners Representative
Project Manager / Owners Representative

g2 Recruitment • Henegouwen

Sur place
EUR 50 000 - 80 000
Electro-Mechanical Site Supervisor – Piping & ME
Electro-Mechanical Site Supervisor – Piping & ME

BESIX Group • Brussel Hoofdstad

Sur place
EUR 90 000 - 120 000
Flexible mobility advantages
Medical care insurance
Work-life balance program
Electrical Project Manager - Charleroi (Onsite)
Electrical Project Manager - Charleroi (Onsite)

Jones Engineering • Henegouwen

Sur place
EUR 50 000 - 70 000
Competitive salary package
Training and development programs
Project Scheduler
Project Scheduler

Arcadis • Geel

Hybride
EUR 65 000 - 95 000
Hybrid work model
Career development opportunities
Exposure to international projects
Senior EHS Lead — Construction & M&E
Senior EHS Lead — Construction & M&E

ProSource Group • Brussel

Sur place
EUR 60 000 - 80 000
Project Planner & Scheduler
Project Planner & Scheduler

Pauwels Consulting • Waver

Sur place
EUR 60 000 - 82 000
Project Engineer - Capital Projects
Project Engineer - Capital Projects

LanzaTech • Oost-Vlaanderen

Hybride
EUR 70 000 - 110 000