E&I Shutdown Lead for Refinery Projects

Wood Group

Brisbane

On-site

AUD 129,000 - 203,000

Full time

9 days ago

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Wood Group seeks experienced E&I Supervisors for a Brisbane-based shutdown at the Ampol Lytton Refinery. The role starts early May for about 12–14 weeks, leading a fast-paced supervisory team and safely executing planned shutdown activities.

Applicants based in Southeast Queensland are preferred, with travel and lodging arrangements provided where applicable. Australian citizens or those with the required permit/VISA will be considered.

Qualifications

  • Trade certificate and QLD electrical licence essential.
  • Dual trade qualification with Cert III Electrical and Cert III Instrument & Control.
  • Cert IV in Electrical – Instrumentation considered.
  • EEHA certification required; LVR/CPR current to mid-August 2026.
  • Working at Heights, Confined Space and High-risk EWP desirable.
  • Pre-employment medical check is required.

Responsibilities

  • Lead and execute planned shutdown activities safely.
  • Coordinate resources to deliver quality work on schedule.
  • Ensure compliance with Permit to Work, SWMS and risk controls.
  • Interface with clients, supervisors and E&I teams on site.
  • Record incidents and participate in investigations and lessons learned.
  • Maintain zero tolerance for unsafe acts and promote safety culture.

Skills

Shutdown experience
Resource coordination
Electrical diagrams literacy
Technical advisory
Scheduling & planning

Education

QLD Electrical licence
Cert III Electrotechnology
Cert III Instrument & Control
Cert IV Electrical – Instrumentation
EEHA (Hazardous Areas)
LVR/CPR

Job description

Wood Group seeks experienced E&I Supervisors for a Brisbane-based shutdown at the Ampol Lytton Refinery. The role starts early May for about 12–14 weeks, leading a fast-paced supervisory team and safely executing planned shutdown activities.

Applicants based in Southeast Queensland are preferred, with travel and lodging arrangements provided where applicable. Australian citizens or those with the required permit/VISA will be considered.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Shutdown E&I Supervisor — Lead Critical Installations
Shutdown E&I Supervisor — Lead Critical Installations

Alltype Engineering Pty Ltd • Leinster

On-site
AUD 80,000 - 100,000
Career development prospects
Challenging work
Longevity in employment
Coded Welder – Refinery Turnaround (FIFO/Immediate Start)
Coded Welder – Refinery Turnaround (FIFO/Immediate Start)

EnerMech • City of Brisbane

Hybrid
AUD 83,000 - 110,000
FIFO available
LAHA
11-hour shifts
+1
E&I Supervisor | FIFO 2:2 | 12-hour Shifts | Gas Plant
E&I Supervisor | FIFO 2:2 | 12-hour Shifts | Gas Plant

UGL • Town Of Port Hedland

On-site
AUD 110,000 - 150,000
FIFO roster
Coded Welder for Major Refinery T&I | FIFO/LAHA
Coded Welder for Major Refinery T&I | FIFO/LAHA

EnerMech • City of Brisbane

On-site
AUD 55,000 - 83,000
FIFO
LAHA
11-hour shifts
+1
Pipe Fitter - Brisbane Refinery (DIDO)
Pipe Fitter - Brisbane Refinery (DIDO)

Eftech International • City of Brisbane

On-site
AUD 92,000 - 129,000
Drive In - Drive Out (DIDO)
E&I Controls Project Engineer – Brownfield Refinery Upgrades
E&I Controls Project Engineer – Brownfield Refinery Upgrades

Category 5 Labour Management • Sydney

On-site
AUD 110,000 - 160,000
Immediate start
Refinery project exposure NSW
E&I Technician — Turnaround Specialist (WA Downstream)
E&I Technician — Turnaround Specialist (WA Downstream)

UGL Pty Limited • Onslow

On-site
AUD 120,000 - 170,000
Diverse opportunities to grow
Attractive remuneration and benefits
Global contractor
LNG Shutdown E&I Planner - 12-Month Contract, Flexible Work
LNG Shutdown E&I Planner - 12-Month Contract, Flexible Work

Maintenance Systems Solutions Pty Ltd • Gladstone Regional

Hybrid
AUD 124,000 - 138,000
12-month contract
Flexible working arrangements
LNG shutdown project
Electrical Maintenance Planner
Electrical Maintenance Planner

Wood • City of Brisbane

On-site
AUD 90,000 - 120,000
Lead Boilermaker - Major Shutdown & Maintenance Lead
Lead Boilermaker - Major Shutdown & Maintenance Lead

EnerMech • Gladstone Regional

On-site
AUD 75,768 - 123,984