Workface Planner III - Instrumentation

Worley

Baytown (TX)

On-site

USD 90,000 - 130,000

Full time

5 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Paid time off
Holiday pay (US)
Health, life, dental, vision insurance
401K plan

Job summary

Worley seeks an experienced Workface Planner III - Instrumentation to translate engineering, procurement, and project schedules into detailed IWPs for field execution. You will drive safe, constructive delivery of instrumentation work across engineering, procurement, and construction interfaces.

You will apply advanced planning methods, coordinate across disciplines, and ensure readiness for installation, testing, and turnover, while balancing safety, productivity, and project priorities.

Qualifications

  • University/degree in Instrumentation Engineering, Electrical Engineering, Construction Management, Project Management or related discipline.
  • Typically 5+ years of experience for degree candidates or 10+ years with trade qualifications.
  • Experience in instrumentation workface planning, industrial construction planning, field engineering, or project controls.
  • Strong knowledge of AWP, CWPs, IWPs.
  • Ability to interpret P&IDs, loop drawings, data sheets and specs.
  • Experience coordinating across engineering, procurement, materials management, construction, quality, and commissioning.
  • Independent technical planning decisions within assigned responsibilities.
  • Commitment to HSE and continuous improvement.

Responsibilities

  • Developing, reviewing, and maintaining instrumentation Installation Work Packages (IWPs) that support safe and efficient field execution.
  • Applying Advanced Work Packaging (AWP) principles to translate CWPs into detailed, executable instrumentation work scopes.
  • Coordinating engineering drawings, data sheets, material requirements and field information for construction readiness.
  • Verifying that engineering information, materials, equipment, access, permits, and quality requirements are available before work is released to the field.
  • Performing detailed constraint identification and tracking and coordinating with stakeholders to remove barriers.
  • Developing installation sequences aligning with milestones, system boundaries, testing requirements, and turnover plans.
  • Collaborating with instrumentation supervision and construction management to reflect practical field execution requirements.
  • Coordinating field instrument installation, instrument supports, tubing, impulse lines, junction boxes, and cabling interfaces.
  • Coordinating across disciplines to maintain workface readiness.
  • Monitoring availability of instruments and materials for planned work.
  • Supporting workforce forecasting and productivity planning by defining quantities, scope, sequencing, and resources.
  • Monitoring IWP progress and adjusting plans to maintain priorities.
  • Ensuring work packages support calibration, testing, pre-commissioning, commissioning, and turnover.
  • Incorporating constructability into work packages to improve safety and productivity.
  • Identifying risks and developing practical recommendations to protect productivity and commitments.
  • Participating in workface planning meetings and readiness reviews.
  • Maintaining work package records and planning data.
  • Communicating priorities and status to stakeholders.
  • Providing technical guidance to planning personnel and supporting required activities.
  • Troubleshooting planning systems and supporting continuous improvement.

Skills

Instrumentation planning
AWP/IWP knowledge
P&IDs interpretation
Construction sequencing
Stakeholder collaboration

Education

Degree in Instrumentation/Elect Electrical/Construction Mgmt

Tools

AWP tools

Job description

Job Description - Workface Planner III - Instrumentation (BAY01F0)

Workface Planner III - Instrumentation - BAY01F0

Company : Worley

Job

Construction

Schedule

Full-time

Employment Type : Employee

Reporting Manager Title : Senior Director, Project Delivery Services

Workface Planner III - Instrumentation

Play an integral role in delivering complex industrial construction projects by translating engineering, procurement, and project schedules into safe, construction-ready instrumentation work packages. As a Workface Planner III - Instrumentation, you will provide advanced construction planning expertise that enables field teams to install, test, and complete instrumentation systems safely, efficiently, and predictably.

Working at the critical interface between engineering, procurement, materials management, project controls, construction, quality, and commissioning, you will ensure instrumentation work is properly sequenced, fully constrained, and ready for field execution. Your expertise will directly influence craft productivity, construction readiness, system completion, commissioning priorities, and successful project delivery.

Purpose of the role

The Workface Planner III - Instrumentation is responsible for developing and maintaining detailed instrumentation workface plans that convert project-level construction strategies into executable field work. You will apply advanced knowledge of construction planning, instrumentation systems, and project execution to develop Installation Work Packages (IWPs), identify and remove constraints, establish work sequencing, and provide field teams with reliable, construction-ready information.

You will work with a high degree of independence within established project requirements, making technical planning decisions and recommendations that balance safety, constructability, productivity, cost, schedule, material availability, testing requirements, and commissioning priorities.

You will be responsible for:

  • Developing, reviewing, and maintaining instrumentation Installation Work Packages (IWPs) that support safe and efficient field execution.
  • Applying Advanced Work Packaging (AWP) principles to translate Construction Work Packages (CWPs) into detailed, executable instrumentation work scopes.
  • Coordinating engineering drawings, P&IDs, instrument indexes, loop drawings, hook-up drawings, specifications, data sheets, material requirements, schedules, and field information required for construction readiness.
  • Verifying that engineering information, materials, equipment, access, permits, quality requirements, and other prerequisites are available before work is released to the field.
  • Performing detailed constraint identification and tracking and coordinating with responsible stakeholders to remove barriers before scheduled execution.
  • Developing logical installation sequences that align instrumentation construction with project milestones, system boundaries, testing requirements, commissioning priorities, and turnover plans.
  • Working closely with instrumentation supervision and construction management to ensure work packages reflect practical field execution requirements.
  • Coordinating field instrument installation, instrument supports, tubing, impulse lines, junction boxes, control valves, analyzer systems, instrument cabling interfaces, and associated construction activities.
  • Coordinating engineering, procurement, materials management, project controls, construction, electrical, quality, commissioning, and other disciplines to maintain workface readiness.
  • Monitoring availability of instruments, valves, tubing, fittings, supports, junction boxes, specialty components, vendor equipment, and other materials required for planned work.
  • Supporting workforce forecasting and productivity planning by defining quantities, work scope, installation sequencing, and resource requirements.
  • Monitoring IWP progress, field performance, and changing project conditions and adjusting plans to maintain construction priorities.
  • Ensuring instrumentation work packages support calibration, loop checking, functional testing, system completion, pre-commissioning, commissioning, and turnover requirements.
  • Incorporating constructability considerations into work packages to improve safety, access, productivity, quality, and execution efficiency.
  • Identifying technical, schedule, material, interface, or execution risks and developing practical recommendations to protect field productivity and project commitments.
  • Participating in workface planning meetings, construction readiness reviews, schedule reviews, look-ahead planning, systemization discussions, and coordination sessions.
  • Maintaining accurate work package records, progress information, planning documentation, constraint logs, and supporting project data.
  • Communicating planning priorities, constraints, status, and recommended actions clearly to construction and project stakeholders.
  • Providing technical guidance to less experienced workface planning personnel and supporting assigned planning activities when required.
  • Troubleshooting planning systems, processes, and tools and supporting continuous improvement in AWP and workface planning practices.

About us

Worley is a global company of energy, chemicals and resources experts headquartered in Australia. We partner with our customers to deliver projects and create value across the life of their assets. We specialize in consulting, engineering, procurement and construction across the project lifecycle, with services extending through to operations and decommissioning. Leveraging extensive experience and AI-enabled delivery, we support customers in navigating complexity as they meet today's needs and transition to more sustainable solutions.

What you’ll bring to the role

You are an experienced construction planning professional with strong instrumentation knowledge and a practical understanding of how engineering, materials, construction sequencing, testing, and commissioning requirements come together to create executable field work. You combine advanced planning expertise with sound technical judgment and the ability to work directly with construction teams to improve productivity and predictability.

  • University degree in Instrumentation Engineering, Electrical Engineering, Construction Management, Project Management, or a related discipline, or an equivalent trade qualification combined with relevant technical training and experience.
  • Typically 5+ years of relevant experience for degree-qualified candidates or 10+ years of relevant experience supported by trade qualifications.
  • Demonstrated experience in instrumentation workface planning, industrial construction planning, field engineering, instrumentation construction, project controls, or related project execution activities.
  • Strong working knowledge of Advanced Work Packaging (AWP), Construction Work Packages (CWPs), and Installation Work Packages (IWPs).
  • Strong knowledge of instrumentation installation practices, including field instruments, control valves, tubing, impulse lines, supports, junction boxes, analyzer systems, and associated interfaces.
  • Ability to interpret P&IDs, instrument indexes, loop drawings, hook-up drawings, data sheets, specifications, cable schedules, vendor documentation, and construction drawings.
  • Experience developing construction-ready work packages and identifying and managing constraints that affect safe and productive field execution.
  • Strong understanding of instrumentation calibration, loop checks, functional testing, system completion, pre-commissioning, commissioning, and turnover requirements.
  • Strong understanding of construction sequencing, schedule priorities, material availability, labor requirements, systemization, and productivity considerations.
  • Experience coordinating across engineering, procurement, materials management, construction, project controls, quality, electrical, and commissioning functions.
  • Ability to make independent technical planning decisions within assigned responsibilities and appropriately escalate complex or unusual matters.
  • Strong analytical, organizational, troubleshooting, and problem-solving capabilities.
  • Effective communication and stakeholder engagement skills with the ability to influence planning and construction priorities.
  • Strong understanding of construction planning systems, scheduling tools, document management platforms, and project execution processes.
  • Ability to provide technical guidance and support to other planning personnel when required.
  • Commitment to HSE, construction quality, productivity, operational excellence, and continuous improvement.
  • Feel the energy at Worley with access to a range of benefits including: paid-time off, holiday pay (usually 8 per year in the US), and eligibility to participate in the medical, life, dental, and vision insurance plans, as well as 401K plan.

Moving forward together

We want our people to be energized and empowered to drive sustainable impact. So, our focus is on a values-inspired culture that unlocks brilliance through belonging, connection and innovation. We're building a diverse, inclusive and respectful workplace. Creating a space where everyone feels they belong, can be themselves, and are heard.

And we're not just talking about it; we're doing it. We're reskilling our people, leveraging transferable skills, and supporting the transition of our workforce to become experts in today's low carbon energy infrastructure and technology. Whatever your ambition, there's a path for you here.

And there's no barrier to your potential career success. Join us to broaden your horizons, explore diverse opportunities, and be part of delivering sustainable change.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Workface Planner
Senior Workface Planner

Worley • Brownsville (TX)

On-site
USD 95,000 - 125,000
Paid time off
Holiday pay
Health insurance
+1
Senior Workface Planner
Senior Workface Planner

Worley • Cameron (LA)

On-site
USD 120,000 - 180,000
Senior Workface Planner - Civil/Structural
Senior Workface Planner - Civil/Structural

Worley • Brownsville (TX)

On-site
USD 110,000 - 150,000
Paid time off
Holiday pay
Medical insurance
+3
Senior Workface Planner
Senior Workface Planner

Worley • Louisiana

On-site
USD 120,000 - 160,000
Workface Planner I - Mechanical/Piping
Workface Planner I - Mechanical/Piping

Worley • Bastrop (TX)

On-site
USD 65,000 - 90,000
Paid time off
Holiday pay
Medical insurance
+4
Principal Instrumentation Engineer
Principal Instrumentation Engineer

Worley • Baton Rouge (LA)

On-site
USD 120,000 - 180,000
Workface Planner III
Workface Planner III

Worley • Cameron (LA)

On-site
USD 90,000 - 150,000
Field Engineer III - Mechanical
Field Engineer III - Mechanical

Worley • Baytown (TX)

On-site
USD 120,000 - 150,000
Paid time off
Holiday pay
401K plan
Planner/Scheduler I
Planner/Scheduler I

Worley • Louisiana

On-site
USD 90,000 - 130,000
Senior Principal Instrumentation Engineer
Senior Principal Instrumentation Engineer

Worley • Missouri

On-site
USD 90,000 - 130,000