Typhoon Halong Lead Carpenter

Association of Village Council Presidents

Toksook Bay (AK)

On-site

USD 60,000 - 80,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

A local community organization is seeking a Lead Carpenter to oversee a crew in residential remodeling projects in rural Alaska. The ideal candidate should have at least four years of supervisory experience, proficiency in residential construction, and fluency in Yup’ik and English. Responsibilities include managing work sites, estimating job durations, and ensuring efficient material use. Applicants must hold a high school diploma and a valid Alaska driver's license. This role will require outdoor work and regional travel.

Qualifications

  • Minimum 4 years of supervisory experience in construction.
  • Experience in all phases of residential construction.
  • Ability to interact with the general public professionally.

Responsibilities

  • Lead a crew of 3 to 4 people for residential remodeling projects in Alaska.
  • Estimate work and time required for jobs accurately.
  • Manage materials and supplies to ensure efficiency.

Skills

Supervisory Experience
Residential Construction Proficiency
Fluency in Yup’ik and English
Knowledge of Personal Protective Equipment (PPE)

Education

High School Diploma or GED
Apprenticeship in Construction or Maintenance

Job description

Description

SUMMARY:

Lead carpenters must be able to lead a crew of 3 to 4 people. Remote Alaska residential remodeling experiences a plus.

PERFORMANCE RESPONSIBILITIES:

include the following. Other duties may be assigned:

  • Study individual job sites, plan work and accurately take off construction material
  • Estimate amount of work and time required for job
  • Experience building foundations and leveling buildings.
  • Experience with all phases of residential construction. Installation of windows, doors, Insulation, sealing, flooring siding and roof work. Able to lay out and build stairs. Finish carpentry. Setting cabinets and counter tops. General understanding of electrical and plumbing.
  • Manage materials and supplies as necessary to facilitate the efficient progression of work on the job.
  • Understand construction logistics in Rural Alaska.
  • Prepare project labor coding on timesheets
  • Work with Human Resources Department, Transportation Director to hire supervisor, discipline, and if n necessary fire onsite employees.
  • Interact with the general public maintaining a professional attitude and working relationship.
  • Travels frequently within the region for projects.

Requirements

QUALIFICATIONS:

To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Fluency in Yup’ik and English is strongly preferred. Work will be in outdoor environments. May travel by jet, small plane, four wheeler, snow machine, boat.

REQUIREMENTS:

Supervisory Experience

Proof (evidence) of construction supervisory experience – minimum 4 years experience.

Provide resume of previous employment with references

Show proficiency with residential construction

EDUCATION and EXPERIENCE:

Must have a High school diploma or GED. Four (4) years working in a carpenter position. Apprenticeship trade in construction or maintenance is strongly preferred. Must have experience in and knowledge of Personal Protective Equipment (PPE) and use it.

Certificates, Licenses, Registrations:

Valid State of Alaska Driver’s License with a good enough driving record to be insured on the AVCP Vehicle Policy.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Typhoon Halong Lead Carpenter
Typhoon Halong Lead Carpenter

Association of Village Council Presidents • Nightmute (AK)

On-site
USD 60,000 - 80,000
Typhoon Halong Lead Carpenter
Typhoon Halong Lead Carpenter

Association of Village Council Presidents • Alaska

On-site
USD 85,000 - 110,000
Typhoon Halong Lead Carpenter
Typhoon Halong Lead Carpenter

Association of Village Council Presidents • Bethel (CT)

Remote
USD 70,000 - 90,000
HIP Lead Carpenter
HIP Lead Carpenter

Association of Village Council Presidents • Tuluksak (AK)

On-site
USD 60,000 - 80,000
HIP Lead Carpenter
HIP Lead Carpenter

Association of Village Council Presidents • Kasigluk (AK)

On-site
USD 60,000 - 75,000
Typhoon Halong Carpenter
Typhoon Halong Carpenter

Association of Village Council Presidents • Toksook Bay (AK)

On-site
USD 18,000 - 30,000
Typhoon Halong Carpenter
Typhoon Halong Carpenter

Association of Village Council Presidents • Bethel (CT)

On-site
USD 40,000 - 60,000
Carpenter
Carpenter

Association of Village Council Presidents • Bethel (CT)

Hybrid
USD 60,000 - 90,000
Typhoon Halong Carpenter
Typhoon Halong Carpenter

Association of Village Council Presidents • Alaska

On-site
USD 40,000 - 60,000
LIHEAP Lead Carpenter
LIHEAP Lead Carpenter

Association of Village Council Presidents • Kwethluk (AK)

On-site
USD 60,000 - 100,000