Traveling Construction Scheduler

Clayco

Kentucky

On-site

USD 85,000 - 140,000

Full time

5 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Clayco is seeking a Scheduling and Planning Manager to build and maintain project schedules and baselines, aligning with Clayco policies and owner requirements. You will drive data collection, update schedules with inputs from Project Managers, Superintendents, and subcontractors, and ensure accurate cash flow reporting.

Requirements include a Bachelor’s in Engineering/Construction, 6–10 years of scheduling experience, and Primavera P6 expertise.

Qualifications

  • Bachelor’s degree in Engineering, Construction, or related major.
  • 6–10 years scheduling experience.
  • Proven knowledge of Primavera P-6 scheduling management system.
  • Project Management experience for general contractor preferred.
  • Strong computer skills: MS Project, Word, Excel, Outlook.
  • Knowledge in BIM and scheduling relationships preferred.
  • Willingness to travel and move between project locations.
  • Excellent oral and written communication.

Responsibilities

  • Update progress of schedules and gather data from PMs, supers, and Owners' reps.
  • Maintain Project Schedule Baselines per policy and owner requirements.
  • Generate periodic performance and cash flow reports (e.g., EV, Baseline Deviation).
  • Load costs and resources in schedules using Clayco metrics.
  • Analyze network logic and validate against project intent.
  • Assist in monthly schedule reporting and narrative.
  • Develop schedules from ground up for proposals and construction.

Skills

Scheduling
Primavera P6
MS Project
BIM concepts
Communication

Education

Bachelor’s degree in Engineering/Construction

Tools

MS Excel
MS Outlook

Job description

Clayco is a full-service, turnkey real estate development, master planning, architecture, engineering, and construction firm that safely delivers clients across North America the highest quality solutions on time, on budget, and above and beyond expectations. With $8.1 billion in revenue for 2025, Clayco specializes in the "art and science of building," providing fast track, efficient solutions for mission critical, industrial, life sciences, power & energy, aviation, commercial, institutional, residential and sports & entertainment related building projects.

The Role We Want You For

The Scheduling and Planning Manager builds and maintains the project schedule and the different baselines in accordance with Clayco's policies, owner requirements, and the on-going analysis of the network logic and validation as it complies with the intent of the project team. Cost and resource loading including the Clayco metrics and general conditions is required on all project schedules so, all report generation and cash flows will be a critical element of the role.

The Specifics of the Role
  • Periodic progress updates of in-progress schedules. Collection of all pertinent data required to update the schedule. The Scheduler is responsible for collection of update data from multiple sources, including the Project Manager, Superintendent, and Owners Representatives and subcontractors. All update data shall be approved by the Project Manager prior to incorporation into the schedule.
  • Maintenance of Project Schedule Baselines. Maintains Project Schedule Baselines in accordance with Clayco's policy regarding Baselines and any additional requirements the Owner's contracts may include.
  • Periodic Performance Report Generation. Generation of project specific Performance Reports as well as Clayco Standard reports, including but not limited to: Critical Activities Report, Baseline Deviation Report, Earned Value Performance Index Report and Project Cash Flow Report.
  • Cost and Resource Loading of Schedules. Required at a minimum on all Clayco projects to include the Clayco Metrics Resource Set for project staff and General Conditions. As required by the project, updating cost and resource actuals may be required as part of the periodic progress update process.
  • Network Logic Analysis and Validation. On-going analysis of the network logic and validation that it complies with the intent of the project team and that it complies with the Clayco Standard Guidelines for network logic. The network logic on-going analysis shall also include removal of extraneous and superfluous dependencies that may cause errors in calculating total float and criticality.
  • Assist in preparation of Monthly Schedule Reporting. Preparation of the required reports for the project and shall include assisting with the draft of the Monthly Schedule Narrative.
  • Schedule Development. Developing schedules from the ground up for both proposals and construction projects. Development of both types of schedules shall be a team effort.
Requirements
  • Bachelor's Degree in Engineering, Construction, or related major is required.
  • 6-10 years of scheduling experience.
  • Recent expertise and a proven knowledge of Primavera P-6 scheduling management system.
  • Project Management experience working for general contractor preferred.
  • Strong computer skills, including proficiency in Microsoft Project, Word, Excel, and Outlook and willingness to regularly update skills.
  • Knowledge in BIM and how it relates to scheduling and sequencing is preferred.
  • Ability to travel and move depending on project locations.
  • Excellent communication skills, both oral and written.
  • Excellent listening skills with attention to detail.
  • Excellent and efficient quality of work.
  • Highly entrepreneurial, hardworking, and self-motivated, with the ability to work equally well on own as well as in a team environment.
  • Ability to walk the job site, climb ladders, and multi floor scaffolding.
  • Ability to lift objects at least 30lbs
Some Things You Should Know
  • Our clients and projects are nationwide – Travel will be required.
  • No other builder can offer the collaborative design-build approach that Clayco does.
  • We work on creative, complex, award-winning, high-profile jobs.
  • The pace is fast!
  • This position is classified as a safety-sensitive role in accordance with applicable state and federal laws. Candidates selected for this position will be subject to a comprehensive background check, which includes mandatory drug testing.
Why Clayco?
  • 2025 Best Places to Work – St. Louis Business Journal, Los Angeles Business Journal, and Phoenix Business Journal.
  • 2025 ENR Top 400 – Top Data Center Contractor (Top 3).
  • 2025 ENR Top 100 Design-Build Firms – Design-Build Contractor (Top 5).
  • Discretionary Annual Bonus: Subject to company and individual performance.
  • Comprehensive Benefits Package Including: Medical, dental and vision plans, 401k, generous PTO and paid company holidays, employee assistance program, flexible spending accounts, life insurance, disability coverage, learning & development programs and more!
Compensation
  • The salary range for this position considers a wide range of factors in making compensation decisions including but not limited to: Education, qualifications, skills, training, experience, certifications, internal equity, and location. Compensation decisions are dependent on the facts and circumstances of each case.
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Traveling Construction Scheduler
Traveling Construction Scheduler

Clayco • Town of Texas (WI)

On-site
USD 90,000 - 130,000
Traveling Construction Scheduler
Traveling Construction Scheduler

Clayco • Indiana (PA)

On-site
USD 95,000 - 130,000
Scheduling and Planning Manager
Scheduling and Planning Manager

Clayco • Jeffersonville (OH)

On-site
USD 95,000 - 130,000
Discretionary Annual Bonus
Comprehensive Benefits Package
Flexible Spending Accounts
+2
Scheduling and Planning Manager
Scheduling and Planning Manager

Gilder Search Group • Atlanta (GA)

On-site
USD 90,000 - 130,000
Comprehensive Benefits Package
Discretionary Annual Bonus
Generous PTO and paid company holidays
Scheduling and Planning Manager
Scheduling and Planning Manager

Gilder Search Group • South Bend (IN)

On-site
USD 90,000 - 140,000
Comprehensive Benefits Package
Discretionary Annual Bonus
Generous PTO and paid company holidays
Scheduling and Planning Manager
Scheduling and Planning Manager

Gilder Search Group • Kentucky

On-site
USD 90,000 - 120,000
Comprehensive benefits package
Discretionary annual bonus
Flexible spending accounts
+3
Director, Scheduling & Planning - Mission Control - Hobart, IN
Director, Scheduling & Planning - Mission Control - Hobart, IN

Sky Mavis • Harrisburg

Hybrid
USD 120,000 - 150,000
Discretionary Annual Bonus
Comprehensive Benefits Package
Scheduling and Planning Manager
Scheduling and Planning Manager

Sky Mavis • United States

On-site
USD 80,000 - 120,000
Discretionary Annual Bonus
Comprehensive Benefits Package
Scheduling and Planning Manager
Scheduling and Planning Manager

Sky Mavis • Rockville (MD)

On-site
USD 120,000 - 160,000
Discretionary Annual Bonus
Comprehensive Benefits Package
Scheduling and Planning Manager - Commercial
Scheduling and Planning Manager - Commercial

Sky Mavis • Rockville (MD)

On-site
USD 145,000 - 160,000
Discretionary bonus
Benefits package