Sr. Construction Schedule Analyst

MaineGuide

Kittery (ME)

On-site

USD 170,000 - 190,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Competitive compensation
Employee Stock Ownership Plan (ESOP)
Discretionary bonus
Medical, Dental, Vision Insurance
Generous PTO & 11 paid holidays
401(k) with employer match

Job summary

BB&E is seeking a dynamic Construction Scheduler to support NAVFAC projects and on-site design/construction activities in Kittery, ME.

The role requires deep expertise in Primavera P6, CPM scheduling, and Earned Value management, with a strong background in coordinating with NAVFAC, and presenting complex analyses to leadership. On-site work in Kittery, ME is expected.

Qualifications

  • U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required.
  • Certification: Registration as a Planning and Scheduling Professional (PSP) is desirable.
  • Excellent verbal and written communication skills; ability to convey complex concepts to diverse audiences.
  • Proficiency using Primavera P6-Oracle and MS Office.
  • Self-starter; able to manage multiple tasks and deadlines autonomously.

Responsibilities

  • Understand interrelated construction projects within Navy programs and initiatives.
  • Manage multiple priorities and independently develop scheduling solutions for time impacts.
  • Present scheduling analyses to leadership and stakeholders with recommended actions.
  • Develop and maintain scheduling training for project teams (CPM, TIA, baseline, progress, as-built).
  • Guide scheduling specs for contract documents and participate in NAVFAC scheduling groups.
  • Coordinate with NAVFAC personnel and internal teams to reflect changes in schedules.
  • Analyze contractor updates; validate impacts using CPM techniques and time-impact analyses.

Skills

Strong communication skills
Self-starter
Project scheduling
NACI/CAC eligibility

Education

Bachelor's degree

Tools

Primavera P6
MS Office (Excel/Word/PowerPoint)

Job description

BB&E is an employee owned full service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering and Program/Project Management Services to Federal and private sectors.

Position Summary

BB&E is seeking a dynamic and detail-oriented Construction Scheduler to join our team, supporting BB&E's A&AS contract, assisting NAVFAC Mid-Atlantic, and supporting facilities design and construction projects on-site at Kittery, ME.

Job Duties

  • Understanding interrelated construction projects within high-visibility Program Initiatives critical to the Navy's mission.
  • Manage multiple priorities and independently develop technical recommendations or solutions for scheduling issues and time impacts on complex problems encountered during construction contract administration.
  • Presenting technical schedule analysis results (verbal and graphical/tabular) to leadership and non-technical stakeholders, with recommendations for schedule management when requested.
  • Developing and maintaining scheduling training for project teams, including training on network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, and software usage.
  • Guiding scheduling specifications for incorporation into project contract documents.
  • Participating in NAVFAC-sponsored Scheduling Working Groups to address lessons learned, propose software changes, and identify training requirements.
  • Supporting the development of schedule software templates for contractors to create baseline schedules.
  • Project delivery methods include both design-bid/build and design-build.

Specific Responsibilities

  • Initial Construction Planning:
    • Review the scopes of individual projects and based on actual performance metrics and project conditions, propose:
    • Recommended provisions for inclusion in contract schedule specifications.
    • Reasonable construction durations to include in the RFP or solicitation.
    • Participate in Technical Evaluation Teams (TET) when selection factors involve contractor schedule and work plan submissions.
    • Review and provide recommendations to the TET Chair.
    • Review of Baseline Schedules:
    • Review baseline schedules for validity, reasonableness, and depth of construction planning. Ensure compliance with contract schedule specifications.
  • Ongoing Schedule Oversight:
    • Lead the project team in reviewing monthly contractor updates for validity and conformance to contract requirements.
    • Coordinate with technical and non-technical NAVFAC personnel within the Facilities Engineering Command (FEC) and field offices.
    • Work closely with the Contracting Office, design management, estimating, and construction teams to ensure contract changes, non-conformances, and requests for information are accurately reflected in contract schedule updates.
    • Review the critical path and lesser float paths to determine progress concurrency and shared project float.
    • Advise the project team on the disposition of contractor-submitted schedule updates.
    • Alert the project team when the As-Built schedule diverges from the accepted Baseline Schedule.
    • Assist project teams in assessing contractor adherence to the project schedule.
  • Schedule Analysis:
    • Compile Time-Impact-Analysis (TIA) issue files and timelines as issues arise.
    • Review the baseline schedule and schedule updates to determine adherence to the original baseline, apart from identified time impacts.
    • Prepare as-built schedules, including narrative and graphical/tabular visualizations, to highlight delays and/or accelerations that affected timely project completion.
    • Assess the impact of contract changes on the schedule and support the development of the Government's position regarding delays and/or liability.
    • Utilize computer-based scheduling programs, applying Critical Path Method (CPM) analysis.
    • Assist in validating impacts on the construction schedule by comparing work reports.
    • Provide analysis and recommendations on how contractors can mitigate delays and meet the contract completion date.

Requirements

Key Qualifications

  • U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required
  • Certification: Registration as a Planning and Scheduling Professional (PSP) is desirable
  • Strong Communication Skills: Excellent verbal and written communication skills, with the ability to effectively convey complex technical concepts to diverse audiences and experience presenting complex schedule analyses to non-technical stakeholders.
  • Software: Proficiency using Primavera P6- Oracle and MS Office including Excel, Word, and PowerPoint
  • Self-Starter: Highly motivated, with the ability to manage multiple tasks and deadlines autonomously

Experience & Education

  • Experience:
    • A minimum of 12 years of construction CPM scheduling experience utilizing Primavera P6 or its earlier versions is required
    • Experience conducting forensic reviews of Time-Impact Analyses (TIA) in relation to time extension requests or claims.
    • Expertise in Earned Value Management in a construction environment.
    • Ability to evaluate Contractor baseline schedules and monthly updates.
  • Education: A minimum of a Bachelor's degree is required

Physical Requirements

  • Ability to stand/walk/climb/kneel/crouch and remain in a stationary position/sit at least 60% of the time
  • Ability to operate office equipment, including computer, copy machine, phone, etc.
  • Ability to use hands to finger, handle or feel objects or controls; reach with hands and arms
  • Capable of lifting up to 10 lbs.
  • Ability to see details of objects that are less than a few feet away
  • Ability to understand the speech of another person, speak clearly so listeners can understand, and talk or hear both in person and by telephone

Benefits

Compensation, Benefits & Perks

  • Competitive compensation package with a range of $170,000-$190,000. This range represents good-faith compensation for the position at the time of posting. Individual compensation is determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements.
  • Participation in the Employee Stock Ownership Plan - BB&E is 100% employee-owned!
  • Discretionary bonus
  • Medical, Dental, and Vision Insurance with health care concierge
  • Employer provided Short-Term & Long-Term disability
  • Employer provided Life insurance
  • Employee options for supplemental life, supplemental accident, critical illness, hospital indemnity, and Identity theft protection benefits
  • Generous PTO plus 11 paid holidays
  • Traditional & Roth 401(k) options with fully vested employer match
  • Tuition reimbursement & professional development
  • Employee referral program
  • Employee discounts
  • Employee Assistance Program (EAP)
  • Pet insurance discount

Applies only to full-time employees

BB&E is an equal-opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, pregnancy, genetic information, disability, status as a protected veteran, or any other protected category under applicable federal, state, and local laws.

BB&E supports pay transparency and is committed to equitable and competitive compensation practices. Compensation for this role will be determined based on several factors, including job responsibilities, relevant experience, education, certifications, technical skills, security clearance status, geographic location, market conditions, internal equity, and contract-specific requirements. Where required by law, compensation ranges will be provided to candidates during the hiring process.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Sr. Construction Schedule Analyst
Sr. Construction Schedule Analyst

BB&E • Kittery (ME)

On-site
USD 80,000 - 100,000
Competitive compensation packages
Participation in Employee Stock Ownership Plan
Medical, Dental, and Vision Insurance
+4
Sr. Construction Schedule Analyst
Sr. Construction Schedule Analyst

BB&E Consulting Engineers and Professionals • Kittery (ME)

On-site
USD 170,000 - 190,000
Employee Stock Ownership Plan
Discretionary Bonus
Medical, Dental, Vision Insurance
+2
Federal Design and Construction Project Manager
Federal Design and Construction Project Manager

Facade Today • Norfolk (VA)

On-site
USD 130,000 - 160,000
Competitive compensation $130k–$160k
Employee stock ownership plan
Discretionary bonus
+4
Federal Design and Construction Project Manager
Federal Design and Construction Project Manager

BB&E Inc. • Norfolk (VA)

On-site
USD 130,000 - 160,000
Discretionary bonus
11 paid holidays
401(k) with employer match
+1
Construction Engineering Technician
Construction Engineering Technician

BB&E • Kittery (ME)

On-site
USD 105,000 - 115,000
Competitive compensation packages
Discretionary bonus
Medical, Dental, and Vision Insurance
+3
Construction Manager
Construction Manager

BB&E • Kittery (ME)

On-site
USD 85,000 - 100,000
Competitive compensation packages
Participation in Employee Stock Ownership Plan
Medical, Dental, and Vision Insurance
+2
Construction Engineering Technician
Construction Engineering Technician

BB&E • Philadelphia (MS)

On-site
USD 60,000 - 85,000
Competitive compensation packages
Participation in Employee Stock Ownership Plan
Medical, Dental, and Vision Insurance
+2
Construction Engineering Technician
Construction Engineering Technician

BB&E Inc. • Kittery (ME)

On-site
USD 105,000 - 115,000
Employee stock ownership
Discretionary bonus
Medical, Dental, Vision Insurance
+5
Construction Engineering Technician
Construction Engineering Technician

BB&E Consulting Engineers and Professionals • Portsmouth (NH)

On-site
USD 105,000 - 115,000
ESOP ownership
Discretionary bonus
Medical Insurance
+8
Field Construction QA Technician – NAVFAC Projects
Field Construction QA Technician – NAVFAC Projects

BB&E Consulting Engineers and Professionals • Portsmouth (NH)

On-site
USD 105,000 - 115,000