Site Leader - Datacenter construction, HVAC & AC Power

Vertiv Group

Kansas City (MO)

On-site

USD 90,000 - 140,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Vertiv is seeking a Site Leader to provide world-class on-site leadership for large, long-duration power and thermal projects. As the primary Vertiv on-site technical representative, you will coordinate start-up, testing, and completion while building strong relationships with customers and cross-functional teams.

You will partner with the Project Manager to control cost, manage resources, and ensure schedule adherence, while upholding Vertiv safety policies and driving a positive customer

Qualifications

  • Proven leadership of large on-site teams.
  • Experience with power and/or HVAC equipment on industrial projects.
  • Strong communication with customers and cross-functional teams.

Responsibilities

  • Provide on-site leadership for large, long-duration projects.
  • Coordinate startup, testing, and commissioning activities.
  • Maintain safety, schedule adherence, and quality on site.

Skills

Leadership
Project management
Safety compliance
Communication
Electrical knowledge

Job description

Job Description The Site Leader will provide world class jobsite leadership for large, long-duration, high-profile projects for Vertiv power and/or thermal equipment. The Site Leader is the primary Vertiv Service on-site technical representative for large jobs, from construction start, through start-up, site acceptance testing, and project completion. The Site Leader is required to establish, grow and maintain excellent rapport with all customers, co-workers, sales representatives and others as appropriate. The Site Lead is required to work in tandem with the assigned Project Manager to drive cost controls, schedule adherence, resource management, and ultimately a positive customer experience.

DUTIES & RESPONSIBILITIES
ROLE SUMMARY
  • Provide jobsite construction and technical leadership for large projects
  • Working knowledge of critical infrastructure equipment in data centers, including Vertiv-manufactured equipment
  • Leads a multi-disciplinary on-site team consisting of Project Leaders, Installers, Technicians, Customer Engineers, and subcontractors
  • Represents Vertiv at daily customer meetings and can speak to technical requirements for the day's schedule to coordinate activity with other parties on-site
  • Leads and supports start-up and site testing activities for assigned projects
TECHNICAL RESPONSIBILITIES
  • Keeps current on Vertiv equipment start-up and commissioning processes, procedures, and tools-of-the-trade
  • Keeps current on Safety Bulletins, Safety Field Change Notices, Field Change Notices, and Service Tips
SAFETY RESPONSIBILITIES
  • Leads daily Vertiv toolbox talk, pre-job safety walk and inspection, and drives any necessary corrective/preventative actions required in a timely fashion
  • Responsible for the adherence and administration of all site and Vertiv Safety policies on job sites
  • Operates in a safe manner in accordance with published safety guidelines
  • Must wear appropriate PPE as per company guidelines and accordance with job duties
  • Adhere to work hours policy guidelines - "14 hours rule"
  • Report all work related accidents or injuries within 24 hours to the appropriate personnel
  • Must be a role model to fellow associates with regards to safety by setting a positive example
  • Lead by example with the use of STOP WORK Authority, Good Catch engagement, and timely closure of necessary corrective/preventative actions
ADMINISTRATIVE RESPONSIBILITIES
  • Ensure adherence to Vertiv Warranty process in partnership with Project Manager
  • Provide accurate and timely reporting in accordance with published guidelines
  • Timecards, expense reports, mileage reports, SR/task closure, forms, et al.
  • Supports Project Manager with obtaining any necessary technical data so Project Manager can maintain project systems
  • Maintain company property according to company policies
  • Credit cards, PPE, test equipment, laptop, smartphone, et al.
CUSTOMER SATISFACTION RESPONSIBILITIES
  • Provide proper and adequate communication to internal and external customers
  • Ensure daily alignment of customer expectations and Vertiv activity, and drive clarification/re-alignment if there appears to be misalignment of expectations
  • Maintain customer satisfaction rates according to company guidelines
PERSONAL PERFORMANCE EXPECTATIONS
  • Make decisions based on the Fundamental 5 in order of importance: Safety, Quality, Timeliness, Cost, Productivity
  • Capable of making timely decisions, technical and commercial, under pressure
  • Maintain productive utilization rate according to company guidelines
  • Adhere to company dress code and safety regulations
  • Understand and comply with company startup/escalation process and procedures
  • In all aspects of job requirements, must lead by example, and conduct themselves aligned to Vertiv Behaviors
  • Ability to communicate with all levels within the organization -Managers, co-workers, Support Services, sales, electronic communications, et al.
  • Ability to handle stressful situations and provide a calming effect to customer
  • High level of diplomacy when interacting with internal and external customers
QUALIFICATIONS
  • Experience (one or more of the following)
  • ASEET or ASMET preferred
  • Equivalent industry experience, specifically leading and actively participating in start-up and commissioning of power and/or HVAC equipment preferred
  • Six years' military experience in a related field
  • Minimum 2 years of experience in Industrial construction management
  • Interpersonal Skills
  • Vertiv Behavior practitioner
  • Strong organizational skills
  • Independent operator
  • Strong verbal and written communication skills
  • Able to build and maintain trusting customer relationships
  • Collaborative and cooperative in high-stress environments
  • Able to communicate at all levels of an organization with a base level of executive presence
  • Able to quickly respond to changing customer priorities without disruption or resistance
  • Must be able to read and interpret electrical one-line diagrams and blueprints
  • In all aspects of the job, need to lead by example, and be held to a higher standard of conduct
  • Product certifications up to date
  • Meet all aspects of the job description
  • Performance evaluation rating of meets all aspects of job requirement or better
  • Consistent performance and customer relation skills
Technical skills
  • Ability to make an immediate site evaluation, skills to include environmental temperature, and general operating conditions without supervision
  • Ability to summarize and report all work related tasks performed
  • Independently evaluate, recognize and recommend acceptable customer solutions based upon site evaluation
  • Recommend and direct activities at a customer site by leading technical activities of other technicians
  • Provide on-site customer consultation with the assistance of Project Leader(s)
  • Capable of providing project leadership and on-site direction for assigned projects
  • Expert in COHE procedures
  • Expert in site acceptance testing procedures and equipment
Computer skills
  • Advanced word processing, report generation
  • Spreadsheet processing
  • Electronic mail
  • Testing equipment and data analysis programs
  • Familiarity with computer networks
Mechanical aptitude
WORKING CONDITIONS
  • Job assignments will typically be long-term assignments ranging from 4 weeks to 12+ months duration based upon the scope and schedule of the project
  • If assigned a project not located in the vicinity of Site Leader residence, travel will consist of a field rotation that includes (3) consecutive weeks on the customer site followed by (1) week of a service break in their home office whereby the Site Leader is expected to work their minimum of 40 hours on billable tasks and any administrative duties (i.e. Safety training, cycle counts, etc.) as necessary
  • Jobsites consisting of industrial new construction (greens field) or retrofit construction (browns field)
  • Flexible schedules (weekends, evenings, and holidays)
  • Valid driver's license
  • Deployable in the event of emergencies
PHYSICAL REQUIREMENTS
  • While performing duties of the above jobs, the associate is regularly required to stand, walk, use hands and fingers, handle or feel objects, tools or other components; reach with hands and arms; stoop, kneel, crouch, or crawl; talk, hear and smell. The associate frequently is required to sit and climb or balance.
  • Specific vision abilities required by this job include close vision, distant vision, color vision, peripheral vision, depth perception, and the ability to adjust focus.
  • Must be able to consistently lift up to 50 pounds and occasionally up to 75 pounds.
  • Notes: Vertiv will make reasonable accommodations whenever necessary for all qualified employees or candidates with disabilities (as defined by applicable law), provided that (1) the individual is otherwise qualified to safely perform the essential functions of the job and (2) such accommodations due not impose an undue hardship.
  • The successful candidate will embrace Vertiv's Core Principals & Behaviors to help execute our Strategic Priorities.
OUR CORE PRINCIPALS

Safety. Integrity. Respect. Teamwork. Diversity & Inclusion.

OUR STRATEGIC PRIORITIES

Customer Focus.

Operational Excellence.

High-Performance Culture.

Innovation.

Financial Strength.

OUR BEHAVIORS
  • Own It
  • Act With Urgency
  • Foster a Customer-First Mindset
  • Think Big and Execute
  • Lead by Example
  • Drive Continuous Improvement
  • Learn and Seek Out Development
About Us

The successful candidate will embrace Vertiv's Core Principles & Behaviors to help execute our Strategic Priorities.

OUR CORE PRINCIPLES

Safety. Integrity. Respect. Teamwork. Inclusion.

OUR STRATEGIC PRIORITIES

High-Performance Culture.

Customer Focus.

Operational Excellence.

Innovation.

Financial Strength.

VERTIV BEHAVIORS
  • Own it
  • Act with urgency
  • Foster a customer‑first mindset
  • Think big and execute
  • Lead by example
  • Drive continuous improvement
  • Learn and seek out development
  • Promote transparent & open communication
About Vertiv

Vertiv (NYSE: VRT) brings together hardware, software, analytics and ongoing services to enable its customers' vital applications to run continuously, perform optimally and grow with their business needs. Vertiv solves the most important challenges facing today's data centers, communication networks, and commercial and industrial facilities with a portfolio of power, cooling and IT infrastructure solutions and services that extend from the cloud to the edge of the network. Headquartered in Westerville, Ohio, USA, Vertiv employs around 34,000 people and does business in more than 130 countries. Visit Vertiv.com to learn more.

Work Authorization No calls or agencies please.
Equal Opportunity Employer Vertiv is an Equal Opportunity/Affirmative Action employer. We promote equal opportunities for all with respect to hiring, terms of employment, mobility, training, compensation, and occupational health, without discrimination as to age, race, color, religion, creed, sex, pregnancy status (including childbirth, breastfeeding, or related medical conditions), marital status, sexual orientation, gender identity / expression (including transgender status or sexual stereotypes), genetic information, citizenship status, national origin, protected veteran status, political affiliation, or disability. If you have a disability and are having difficulty accessing or using this website to apply for a position, you can request help by sending an email to help.join@vertiv.com
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Site Lead - Datacenter Construction, Thermal & AC Power - El Paso
Site Lead - Datacenter Construction, Thermal & AC Power - El Paso

Vertiv Group • El Paso (TX)

On-site
USD 110,000 - 165,000
Site Leader - Thermal & Electric - Meridian MS
Site Leader - Thermal & Electric - Meridian MS

Vertiv Group • Meridian (MS)

On-site
USD 90,000 - 140,000
Site Leader - Thermal & Electric - Phoenix Az
Site Leader - Thermal & Electric - Phoenix Az

Vertiv Group • Phoenix (AZ)

On-site
USD 120,000 - 160,000
Site Leader - Thermal & Electric - Madison WI
Site Leader - Thermal & Electric - Madison WI

Vertiv Group • Madison (WI)

On-site
USD 120,000 - 180,000
Datacenter Site Leader + Thermal + AC Power - Meridian MS
Datacenter Site Leader + Thermal + AC Power - Meridian MS

Vertiv Group • Meridian (MS)

On-site
USD 120,000 - 170,000
Site Leader - Thermal & Electric - El Paso Tx
Site Leader - Thermal & Electric - El Paso Tx

Vertiv Group • El Paso (TX)

On-site
USD 120,000 - 180,000
Datacenter Site Leader + Thermal + AC Power - El Paso TX
Datacenter Site Leader + Thermal + AC Power - El Paso TX

Vertiv Group • El Paso (TX)

On-site
USD 90,000 - 150,000
HVAC Cooling Customer Engineer Site Leader - Red Oak
HVAC Cooling Customer Engineer Site Leader - Red Oak

Vertiv Corporation • Red Oak (TX)

On-site
USD 90,000 - 130,000
HVAC Cooling Customer Engineer Site Leader - Red Oak
HVAC Cooling Customer Engineer Site Leader - Red Oak

Vertiv Corporation • Dallas (TX)

On-site
USD 90,000 - 130,000
HVAC Cooling Customer Engineer Site Leader - Schaumburg
HVAC Cooling Customer Engineer Site Leader - Schaumburg

Vertiv Group • Chicago (IL)

On-site
USD 70,000 - 95,000