Senior QA/QC Field Engineer – Data Center Construction

WB Engineers+Consultants

Clarksville (AR)

On-site

USD 70,000 - 100,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Job summary

WB Engineers+Consultants seeks a detail-oriented QA/QC Field Engineer to serve as the on-site representative during data center construction. You will safeguard construction quality to meet operational requirements before turnover.

The role focuses on implementing QA/QC systems, conducting on-site inspections, and coordinating with design engineers, project managers, commissioning teams, contractors, and clients to ensure alignment with specifications and best practices.

Qualifications

  • Experience applying QA/QC standards on construction sites.
  • Ability to translate design specs into practical field actions.
  • Strong attention to detail and problem-solving on mission-critical systems.

Responsibilities

  • Implement QA/QC standards and checklists to verify work meets specs.
  • Perform on-site inspections and quality walkdowns across all disciplines.
  • Monitor activities for compliance with plans and drawings and inspect materials/workmanship.
  • Identify safety hazards and ensure safe work practices.
  • Coordinate with design engineers, project managers, and contractors to align with requirements.
  • Review MEP designs from operations perspective to improve maintainability.
  • Prepare progress reports, inspection records, and as-built drawings.
  • Verify installation quality against contract documents, labeling, torque, and location.
  • Provide actionable recommendations to resolve issues with designers and suppliers.

Skills

QA/QC Field Engineering
On-site inspections
Documentation
Cross-functional collaboration

Tools

MS Office
AutoCAD
QA/QC software

Job description

WB Engineers+Consultants seeks a detail-oriented QA/QC Field Engineer to serve as the on-site representative during data center construction. You will safeguard construction quality to meet operational requirements before turnover.

The role focuses on implementing QA/QC systems, conducting on-site inspections, and coordinating with design engineers, project managers, commissioning teams, contractors, and clients to ensure alignment with specifications and best practices.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Data Center QA/QC Field Engineer — On-Site Quality Guardian
Data Center QA/QC Field Engineer — On-Site Quality Guardian

Wb Engineering • Clarksville (AR)

On-site
USD 65,000 - 85,000
On-Site QA/QC Lead for Data Center Builds
On-Site QA/QC Lead for Data Center Builds

WB Engineers+Consultants • Clarksville (TN)

On-site
USD 100,000 - 180,000
QA / QC Field Engineer
QA / QC Field Engineer

Wb Engineering • Clarksville (AR)

On-site
USD 65,000 - 85,000
Senior Project Engineer
Senior Project Engineer

WB Engineers+Consultants • Clarksville (AR)

On-site
USD 70,000 - 100,000
Senior Project Engineer - Data Centers
Senior Project Engineer - Data Centers

WB Engineers+Consultants • Clarksville (TN)

On-site
USD 100,000 - 180,000
Data Center QA/QC Lead – Field Inspections
Data Center QA/QC Lead – Field Inspections

CBRE Group, Inc. • Fort Wayne (IN)

On-site
USD 60,000 - 80,000
Data Center QA/QC Technician — Field Inspections & Safety
Data Center QA/QC Technician — Field Inspections & Safety

Insight Global • Town of Texas (WI)

On-site
USD 36,000 - 41,000
Data Center QA/QC Engineer - Construction & Commissioning
Data Center QA/QC Engineer - Construction & Commissioning

Pkaza • Bastrop (TX)

On-site
USD 80,000 - 100,000
Medical insurance
401(k) plan
Competitive salaries
Quality Control Manager - Data Center Construction
Quality Control Manager - Data Center Construction

Employbridge • Town of Texas (WI)

On-site
USD 95,000 - 125,000
Quality Assurance Manager
Quality Assurance Manager

Owen Thomas Group • Town of Texas (WI)

On-site
USD 90,000 - 130,000