Senior Project Manager - Utility Electrical (Data Center Construction)

Austin NAWIC

Vernon, Northern (TX, KY)

Hybrid

USD 83,000 - 191,000

Full time

10 days ago
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Benefits offered by this job

Medical
Dental Insurance
Vision Insurance
401(k)
401(k) Matching
Paid Time Off
Paid Holidays
Short and long-term disability
Employee Assistance Program

Job summary

World Wide Professional Solutions (WWPS) seeks a Senior Project Manager for the utility electrical scope on a data center construction program in Vernon, TX. This role leads end-to-end delivery, coordinating with utilities, EPCs, vendors and the data center team to ensure safe, compliant energization and turnover.

The position requires extensive HV/MV experience, strong leadership, QA/QC, and robust project controls. A comprehensive benefits package and competitive salary accompany the role.

Qualifications

  • 12 to 20+ years of construction project management experience with significant electrical infrastructure responsibility.
  • Experience delivering utility substations, high voltage infra, interconnections, or mission critical power systems.
  • Read and manage execution from single line diagrams, specs, and commissioning procedures.

Responsibilities

  • Lead full lifecycle delivery of utility electrical scope from design through energization and turnover.
  • Interface with utility, EPC/contractors, design engineers, vendors and site leadership.
  • Oversee high voltage equipment, switchgear, grounding, and related civil interfaces.
  • Drive interconnection milestones, design approvals, procurement, outages and energization dates.
  • Coordinate QA/QC, testing, turnover, energization planning and safety around energized systems.
  • Manage schedule, cost, risk, and changes for the utility electrical workstream.

Skills

Leadership
Stakeholder management
Reading electrical diagrams
Project controls
Contractor coordination
Quality assurance

Education

Bachelor's degree in electrical engineering, construction management, engineering, or related field

Tools

Procore
Primavera P6
MS Project

Job description

Position Title:

Senior Project Manager - Utility Electrical (Data Center Construction)

Location:

Vernon, TX

Time Type:

Full time

Key Responsibilities
  • Lead full lifecycle delivery of the utility electrical scope from design coordination and procurement through construction, energization, commissioning, and turnover
  • Serve as the primary owner's representative interface with the serving utility, electrical EPC or contractor, design engineers, equipment vendors, commissioning teams, and site leadership
  • Manage high voltage substation and switchyard scope including transformers, breakers, disconnect switches, bus, instrument transformers, control buildings, station service, grounding systems, cable systems, and associated civil interfaces
  • Drive utility interconnection milestones, design approvals, long lead equipment procurement, outage and switching coordination, and required energization dates
  • Review and challenge electrical single line diagrams, substation layouts, equipment submittals, protection and control schemes, relay coordination, grounding studies, and construction packages
  • Oversee protection and controls, relaying, SCADA, telecom, revenue or utility metering, and the interfaces between utility systems and the data center electrical distribution network
  • Coordinate installation and testing of high voltage and medium voltage cables, terminations, transformers, switchgear, breakers, grounding, and related electrical infrastructure
  • Lead quality and commissioning readiness including factory acceptance testing, field acceptance testing, relay testing, electrical testing, punch resolution, and energization documentation
  • Develop and manage safe energization, switching, lockout tagout, outage, and turnover plans in alignment with utility requirements, NEC, NESC, NFPA 70E, OSHA, and project standards
  • Control schedule, cost, risk, change management, contractor performance, and interface issues for the utility electrical workstream
  • Identify constructability, sequencing, access, equipment delivery, and cross discipline interface risks early and drive them to resolution
Required Qualifications
  • 12 to 20+ years of construction project management experience with significant electrical infrastructure responsibility.
  • Strong experience delivering utility substations, high voltage electrical infrastructure, utility interconnections, transmission or distribution projects, or comparable mission critical power systems.
  • Hands on knowledge of substation construction, power transformers, high voltage and medium voltage switchgear, breakers, protection and controls, relays, grounding, cable systems, and energization.
  • Ability to read and manage execution from single line diagrams, electrical specifications, protection and control drawings, substation layouts, and commissioning procedures.
  • Proven ability to lead contractors, engineers, utilities, vendors, commissioning teams, and multidisciplinary project stakeholders.
  • Experience with electrical QA and QC, testing, commissioning, turnover, energization planning, and safe work practices around energized systems.
  • Proficiency with project controls and construction management tools such as Procore, Primavera P6, or MS Project
Preferred Qualifications
  • Hyperscale data center or mission critical utility electrical experience strongly preferred
  • Direct, high voltage substation, utility interconnect, switchyard, or owner's representative electrical package experience is highly relevant
  • Background with an electric utility, substation EPC, electrical contractor, engineering firm, commissioning provider, or large industrial power project is highly transferable
  • Bachelor's degree in electrical engineering, construction management, engineering, or a related field. PE, PMP, or electrical commissioning credentials are a plus

The salary range for this full-time role is $82,700.00-$190,900.05 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. World Wide Professional Solutions reserves the right to pay more or less than the posted range, depending on a candidate's experience, skills, and qualifications, including client requirements.

In addition to base salary, WWPS offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
About_Us:

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client's needs and add meaningful value at every step of a project's development.

Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members including many of the brightest minds in the industry.

Learn more about what a great organization we are here.

World Wide Professional Solutions (WWPS) is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is WWPS', policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, WWPS complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group's policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Project Manager - Utility Electrical (Data Center Construction)
Senior Project Manager - Utility Electrical (Data Center Construction)

Cumming Group • Vernon (TX)

On-site
USD 83,000 - 191,000
Medical Insurance
Dental Insurance
Vision Insurance
+6
Senior Project Manager - Utility Electrical (Data Center Construction)
Senior Project Manager - Utility Electrical (Data Center Construction)

World Wide Professional Solutions LLC • Town of Texas (WI)

On-site
USD 83,000 - 191,000
Medical
Dental
401(k)
+5
Senior Project Manager - Utility Electrical
Senior Project Manager - Utility Electrical

Cumming Group • Vernon (TX)

On-site
USD 83,000 - 191,000
Medical
Dental Insurance
Vision Insurance
+6
Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction
Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction

Wwprosolutions • Vernon (TX)

On-site
USD 150,000 - 210,000
Medical, dental, and vision coverage
Life insurance and disability coverage
Retirement plan
+1
Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction
Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction

World Wide Professional Solutions • United States

On-site
USD 140,000 - 210,000
Per diem
Medical insurance
Dental insurance
+5
Senior Electrical Project Manager - Data Center Construction
Senior Electrical Project Manager - Data Center Construction

Cumming Group • San Antonio (TX)

On-site
USD 116,000 - 162,000
Medical
Dental Insurance
Vision Insurance
+6
Senior Electrical Project Manager - Data Center Construction
Senior Electrical Project Manager - Data Center Construction

Cumming Group • Austin (TX)

On-site
USD 116,000 - 162,000
Medical insurance
Dental Insurance
Vision Insurance
+6
Senior Project Manager - Data Center Construction
Senior Project Manager - Data Center Construction

Cumming Group • Chicago (IL)

On-site
USD 121,000 - 211,000
Medical
Dental Insurance
Vision Insurance
+6
Senior Project Manager - Data Center Construction
Senior Project Manager - Data Center Construction

Cumming Management Group, Inc. • Illinois

On-site
USD 121,000 - 211,000
Medical
Dental
Vision
+6
Senior Project Manager - Data Center Construction
Senior Project Manager - Data Center Construction

Cumming Group • Atlanta (GA)

On-site
USD 116,000 - 202,000
Medical
Dental Insurance
Vision Insurance
+6